• Concrete Placing Boom 12m Pouring Concrete System 1
Concrete Placing Boom 12m Pouring Concrete

Concrete Placing Boom 12m Pouring Concrete

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Manual Concrete Placing Boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q: What are the specifications of concrete spreader?
A counterweight box is arranged on the balance frame. It settled in the main beam rear connecting flange, screw firmly, to ensure the stability of the incident
Q: How to install and use the distributor?
In order to prevent the cable leakage wounding, should be used in three-phase five wire system, the "three distribution", "two levels of protection", to implement a machine a gate of an insurance, lighting line equipment switch installation, the nearest place, in case of emergency hand brake pull
Q: What are the acceptance items of concrete spreader?
The transmission mechanism of the protective cover, etc., each part is firmly connected cloth machine should maintain a certain distance with high voltage and electrical lines, the end of the pouring hose must fasten safety flies, prohibit the use of the length of more than 3 meters water column end hose, hose into the column shall be poured concrete, in strict accordance with the scope of work cloth machine. Work fabric machine under arms are not allowed to stand
Q: What is a fixed concrete distributor?
Internal climbing concrete distributing machine is a kind of distributing equipment for high-rise building concrete construction. The ship borne concrete distributor is a special ship loading equipment for construction and design of harbors and docks
Q: what's the difference between the fabric pump and boom pump?
Boom pump itself has pumping function, cloth machine needs to buy drag pump matching use
Q: What are the weekly inspection items for concrete spreader?
Check the wear of the pipe, the arm thickness is less than 2mm, should be replaced in a timely manner
Q: What is the working principle of the distributor?
The distributing machine is arranged at the center of each casting position, and meets the requirement of pouring position through the bent pipe and the hose
Q: What are the monthly inspection items of the movable concrete spreader?
Check cable, if damaged or aging, should be repaired and replaced immediately
Q: How to distinguish tower type distributor and general distributor?
Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
Q: What are the benefits of concrete handling machines?
Concrete distributor; material ratio; sling construction; fabric safety

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords