• Lszh Cable H05Z1Z1-F System 1
Lszh Cable H05Z1Z1-F

Lszh Cable H05Z1Z1-F

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
5000 Meters m
Supply Capability:
50000 Kilometers per Month m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

*Conductor: Class 5 flexible plain copper conductors

*Insulation: LSZH (Low Smoke Zero Halogen)

*Sheath: LSZH (Low Smoke Zero Halogen)

*Voltage Rating: 300/500V

*Standards: BS6500, IEC 60092-353

*Application:

Used as an indoor general wiring cable primarily for installations in public areas, especially for installation where fire, smoke emission and toxic fumes create a potential threat to life and equipment.

Q: We are now the construction site will all BV line to AF? What is the purpose, AF line in the end where the better
Classification and use of waterproof casing and use of commonly used waterproof casing is divided into two kinds of rigid and flexible
Q: In the laying of the time when there is no specific requirements if not and some cable to go the same bridge more
Shower room installation Note 1: handling, the shower room level easy to make the glass broken, must be vertical and more than two people at the same time handling, and pay attention to avoid collision with the hard objects. Shower room installation Note 2: shower room after the opening of the glass should be placed directly against the wall, placed horizontally or uneven placement may lead to glass damage, resulting in property damage or personal injury. Shower room installation precautions 3: cleaning is strictly prohibited the use of acid, alkali, organic solvents such as chemicals and acid cleaning agents, otherwise it will damage the surface of the product; use of water or neutral detergent on the product surface clean, can not remove the pollution Trace, can be soaked with a small amount of alcohol cleaning cloth to remove stains; shower room installation Note 4: acrylic plate is easy to attach static dust, clean acrylic basin only with cotton cloth dipped in a little soapy water can easily remove the dust Cleaning effect. Shower room installation precautions 5: the use of sealed silicone, silicone rubber should not be coated on the surface of acrylic. If you accidentally painted a little remember not to rush to wipe, so more difficult to remove, should wait until after curing gently peeled out, is strictly prohibited with a hard object scratches, otherwise it will lead to surface damage. After the bottom basin is installed, it should be used after the silica gel is fully cured (silica gel curing time is 24 hours). The above is the relevant shower room installation precautions, hoping to give you in the decoration when the bathroom can play a certain role in helping.
Q: What are the characteristics of Teflon heat shrink tubing
Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1
Q: For example: WDZB-YJY-3 * 2.5RVSPWEL, etc. Thank you, I am a novice, just enter more
Also find a shop to sell the same machine or have sold this machine shop, so that the boss to open a receipt of this machine, say something good or friends to a 5 block . let him tell you the Blue Devils After the sale of customer service where you go to the customer service that receipt out of your warranty card Ji Ji stalk Kui kill long ghosts Han magic lost, and can see what can help you get back to repair, if he does not promise you on the soft grinding Hard grinding, big deal to spend money repair it. Return to the factory repair than the street casually find a repair shop strong ah.
Q: What is the difference between a KVVR cable and an RVV cable?
Kbg tube should refer to the use of socket buckle connection technology to replace the traditional glue connection or welding construction, and no longer need to do jumper wire. KBG steel pipe by precision machining, double-sided chrome, both beautiful, but also a good anti-corrosion properties. No need to weld and set silk equipment, do not need to do cross the ground, no paint, eliminating the traditional welding and silk sets and other complex construction processes. Simply connect the straight pipe with the pipe and tube, threaded box connector connection pipe and junction box, positioning with a set screw can be tightened.
Q: Mechanical parts, standard room, special-shaped pieces, wire and cable, instrumentation. Hardware tools, lifting equipment spare parts what factory to sell
The reason is insufficient power supply. U disk what is not like the hard disk needs mechanical rotation, power consumption, so can easily bring and use. Solution: First, the mobile power line with 3 headline, increase the head of an external USB power supply or computer USB port. Second, do not use HUB or use the HUB with charger. Third, do not use mobile hard disk, the use of large capacity U disk.
Q: Can KVV control cables be used for home heating?
Can, in the water pipe on the top 0.3 meters wear protective tube on the line, if the optocoupler should do a good anti-corrosion on the line.
Q: Single-wire and stranded general use, instrument control cable can use a single line?
Shielding requirements of the higher number of cores is generally 3 +3 three phase line ground three symmetrical and phase line intersection.
Q: Is the RVV power cable also called a cable?
Depending on the actual situation and design there is no future addition or function increase. If not increased or the second phase design should not be reserved, because the general integrated wiring warranty period is 20 years. If it is damaged during the warranty period, the construction unit is responsible for solving! Fiber is generally called spare. Not reserved! Prepare a 4-core and so on.
Q: Instrument cable linked to the card EJB, sjb on behalf of what it means
Can not, air compressor trachea will be heat, will damage the cable, too many pipelines buried together, after the maintenance will be a lot of trouble.
The company enjoys powerful technical strength, a group of high calibers on production and marketing, modern and scale production lines with advanced technology home and abroad, high precision and full function inspection apparatus, all these contribute a supper strong supply ability.

1. Manufacturer Overview

Location Guangdong,China
Year Established 1997
Annual Output Value Above US$100 Million
Main Markets 70.00% Domestic Market
13.30% Oceania
3.00% South America
3.00% Southeast Asia
3.00% Africa
1.20% Eastern Europe
1.00% North America
1.00% Southern Europe
1.00% Western Europe
1.00% Central America
1.00% South Asia
0.50% Mid East
0.50% Eastern Asia
0.50% Northern Europe
Company Certifications ISO 9001:2008;ISO 14001:2004;OHSAS 18001;CCC; CB; CE; SAA

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Shenzhen,Guangzhou,Ningbo
Export Percentage 21% - 30%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese
b) Factory Information
Factory Size: Above 100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Low and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords