High Voltage Cable
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Meters m
- Supply Capability:
- 100000 Meters per Month m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
*high voltage copper cable up 35KV
*high voltage copper cable bear 90 degree
*high voltage copper cable do OEM&ODM service
high voltage copper cable is with following features:
high voltage copper cable use in ducts, trays and direct burial in ground. The cable is subject to immerse in water all the time.
-Standards / Testing Specications: IEC 60502-1.
xlpe swa pvc cable can be installed in duct, tray or direct burial. It is recommended that the installation instructions indicated by the Local Electric Code, or any equivalent, be followed, so that the safeguarding of persons and the integrity of the product will not be affected by eciencies in the installation.
The products are mainly complying with iec 60502 standard, also can be produced according to OEM requirements and other standards, such as bs standard, din standard, ASTM standard, etc.
Voltage grade is up to 35kv, cross-section area can be up to 400 sqmm (copper or aluminiun conductor). Conductor long-time operating temperature is 90 degrees. In short circuit, conductor highest temperature should be not more than 250 degrees
high voltage copper cable with following code and specification:
Code Word | AWG or Kcmil | Bare Neutral Messenger | Phase Conductor | Weight | ||
AL.-ALLOY Stranding and wires Dia(mm) | Rated strength(lbs) | Al. Stranding and wires Dia(mm) | XLPE Insulated thickness(mm) | (kg/km) | ||
Minex | 2*6AWG+1*30.58 | 7/1.68 | 1110 | 1/4.11 | 1.14 | 152 |
prawn | 2*4AWG+1*48.69 | 7/2.12 | 1760 | 1/5.19 | 1.14 | 229 |
Shrimp | 2*2AWG+1*77.47 | 7/2.67 | 2800 | 7/2.47 | 1.14 | 354 |
Cammarus | 2*1/0AWG+1*123.3 | 7/3.37 | 4460 | 7/3.12 | 1.52 | 569 |
Dungeness | 2*2/0AWG+1*155.4 | 7/3.78 | 5390 | 7/3.50 | 1.52 | 702 |
Cyclops | 2*3/0awg+1*155.4 | 7/3.78 | 5390 | 19/2.13 | 1.52 | 703 |
Flustra | 2*3/0AWG+1*195.7 | 7/4.25 | 6790 | 19/2.39 | 1.52 | 869 |
LEPAS | 2*4/0AWG+1*246.9 | 7/4.77 | 8560 | 19/2.68 | 1.52 | 1077 |
CRAB | 2*4AWG+1*30.58 | 7/1.68 | 1110 | 7/1.96 | 1.14 | 208 |
SDCRAB | 2*1/0AWG+1*77.47 | 7/2.67 | 2800 | 7/3.12 | 1.52 | 504 |
- Q:Is the RVV power cable also called a cable?
- Must be reserved! Spare to stay, the normal use of the bad, spare can be used directly, such as fiber
- Q:In the laying of the time when there is no specific requirements if not and some cable to go the same bridge more
- Shower room installation Note 1: handling, the shower room level easy to make the glass broken, must be vertical and more than two people at the same time handling, and pay attention to avoid collision with the hard objects. Shower room installation Note 2: shower room after the opening of the glass should be placed directly against the wall, placed horizontally or uneven placement may lead to glass damage, resulting in property damage or personal injury. Shower room installation precautions 3: cleaning is strictly prohibited the use of acid, alkali, organic solvents such as chemicals and acid cleaning agents, otherwise it will damage the surface of the product; use of water or neutral detergent on the product surface clean, can not remove the pollution Trace, can be soaked with a small amount of alcohol cleaning cloth to remove stains; shower room installation Note 4: acrylic plate is easy to attach static dust, clean acrylic basin only with cotton cloth dipped in a little soapy water can easily remove the dust Cleaning effect. Shower room installation precautions 5: the use of sealed silicone, silicone rubber should not be coated on the surface of acrylic. If you accidentally painted a little remember not to rush to wipe, so more difficult to remove, should wait until after curing gently peeled out, is strictly prohibited with a hard object scratches, otherwise it will lead to surface damage. After the bottom basin is installed, it should be used after the silica gel is fully cured (silica gel curing time is 24 hours). The above is the relevant shower room installation precautions, hoping to give you in the decoration when the bathroom can play a certain role in helping.
- Q:What are the characteristics of Teflon heat shrink tubing
- Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1Appendix B Construction Division (sub-division) project, sub-project division B.0.1 Construction Division (sub-division) project, sub-project can be divided according to Table B.0.1
- Q:We are now the construction site will all BV line to AF? What is the purpose, AF line in the end where the better
- The thickness of the three kinds of tubes produced by various manufacturers are not the same, depending on how much you need, there is only one standard, that is, require manufacturers to provide qualified products according to national standards.
- Q:What is the meaning of kxv in wire and cable?
- According to the drawings when the wiring should be reasonable to find the shortest distance to reduce the cost of water and electricity materials, the strength of electricity in the distribution of wiring.
- Q:Who provided the more to the sub-gave to whom, thank you for helping
- Short-term work optional 4 square, long-term work, the proposed selection of 6 square and above.
- Q:What is the difference between a KVVR cable and an RVV cable?
- The small circle on the wire is marked with a number or letter on the line number. It is set according to the line number on the drawing. A complete wire should be the same for both lines. It is for easy installation and maintenance. And used.
- Q:Mechanical parts, standard room, special-shaped pieces, wire and cable, instrumentation. Hardware tools, lifting equipment spare parts what factory to sell
- 2.5 square aluminum can withstand the maximum 10A current, the maximum load of not more than 2200W, but in the heat is not good temperature environment is not used.
- Q:Single-wire and stranded general use, instrument control cable can use a single line?
- Shielding requirements of the higher number of cores is generally 3 +3 three phase line ground three symmetrical and phase line intersection.
- Q:For example: WDZB-YJY-3 * 2.5RVSPWEL, etc. Thank you, I am a novice, just enter more
- Hello: - ★ . "the scene can not be fixed, with a very tight tie in the cable through the transformer line up" ... ... emergency use is entirely possible. - . need to pay attention to the problem: through the heart of the current transformer (temporary cable tie is firmly tied to the wire through the transformer) to install, to prevent the secondary wiring screws touch the other wire, To prevent measurement is not accurate. - ★ . pay attention to the second line of the line to be strong, to avoid open circuit. The secondary conductor shall be of 2.5 square copper wire (not less than 2.5 square meters).
1. Manufacturer Overview |
|
---|---|
Location | Yunnan,China |
Year Established | 2005 |
Annual Output Value | Above US$100 Million |
Main Markets | Southeast Asia 0.3% Africa 0.5 % Domestic Market 99.2% |
Company Certifications | ISO 9001:2000;ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Shenzhen,Guangzhou,Shanghai |
Export Percentage | 21% - 30% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English, Chinese |
b)Factory Information | |
Factory Size: | 5,000-10,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
High Voltage Cable
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Meters m
- Supply Capability:
- 100000 Meters per Month m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords