• Loader, Rated Load 700kg, Engine Power 50HP(JC45G) System 1
  • Loader, Rated Load 700kg, Engine Power 50HP(JC45G) System 2
Loader, Rated Load 700kg, Engine Power 50HP(JC45G)

Loader, Rated Load 700kg, Engine Power 50HP(JC45G)

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
1500 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Loader, Rated Load 700kg, Engine Power 50HP(JC45G)

Product Details

Basic Info.

Model NO.:JC45G

 

Type:Skid Steer Loader

Usage:Universal Type

 

Scraper Type:Wheel Type

Transmission:Hydraulic Transmission

 

Walking Mode:Wheeled

Load and Unload Method:Front Discharge

 

Engine Power:50HP

Certification:CE, ISO9001: 2000

 

Condition:New

Color:Yellow

 

Compact Structure, Maneuverable Movement:Suitable for Narrow Space Operation

Export Markets:Global

Additional Info.

Trademark:super monkey

 

Packing:Nude

Origin:Taian, Shandong

 

HS Code:84295100

Production Capacity:50sets/Year

Product Description

Standard:
1.Open cabin with mechanical control system
2.USA hydraulic system
3.Double accelerograph control
4.Hydraulic brake
5.Chinese diesel engine

Rated Operating Capacity      700
Tipping load(Kg)      1400
Bucket Capacity(m3)      0.4
Lifting force(kg)      1950
Hydraulic Pump Flow(L/min)      75
Engine power(HP)      50
Weight(Kg)      3100
Max. Travel Speed(km/h)      12
Grade ability (° )      20
Tire      10-16.5
Fuel hyd. Oil capacity(L)      65/65
Dimensions
A. Height at Maximum Extension      3980mm
B. Hinge Pin Height      3080mm
C. Total Height      2050mm
D. Length with Bucket      3420mm
E. Length without Bucket      2640mm
F. Width with Bucket      1740mm
G. Track Width      1450mm
H. Wheelbase      991mm
J. Ground Clearance      185mm
K. Dumping Angle      40°
L. Dumping Height      2380mm
M. Maximum Reach      750mm

Loader, Rated Load 700kg, Engine Power 50HP(JC45G)

Loader, Rated Load 700kg, Engine Power 50HP(JC45G)


Q: What do you think of a Kenda Nevigal 2.35 in the front and a Kenda Small Block 8 2.35 in the rear. I ride agressive east coast trails.Has anyone used this tire combo?
i just bought a pair of nevigals for the front and rear and they work really nice.. i dont know about the other one..
Q: can someone explain how to use ratcheting binders please. using them to chain down bobcats, mini excavators, small tractors etc. i have only used snap binders but our company replaced them all with ratcheting binders. thanks
I okorder /
Q: My key broke in the backhoe ignition today and i have no idea how to get the cut part of the key out of the ignition switch my key broke in half and the caterpillar dealership sends out one of the trucks every three months but they came last month and i do not want to go and buy a new ignition switch i need to use the backhoe tomorrow and all other machines are being used tomorrow i have a 5230 excavator at the shop
Is the key metal? If so, a strong magnet might help pull it out enough for you to pull it out the rest of the way with tweezers or your fingertips. It's worked for me in the past. Good luck.
Q: What did Baby Jesus' birth certificate list under father's name and father's occupation?
Fathers name of Baby Jesus is God. and Father's occupation is Carpenter, means builder.
Q: When you ask philosophy Questions, do you see yourself as an excavator looking for gems of truth in the facts?
A fact must be true to be a fact. Do you mean: do I sift through the evidence to find the facts? ......................................... To Paul: A true statement is a statement based on fact. It has to be precise. Using words is a means of communication. If a word is vague don't use it unless you intend to be vague: but there is nothing vague about some words. They are exact in what they mean.
Q: I play alot of decks that have like 4 windborne muses and 4 ghostly prisons which makes it too hard to attack with a traditional deck so I want to resort to a mill deck in response. I have a few cards in mind and plan on only making it mono blue.1-2x Rite of Replication4x Hedron Crabs2-3x Archieve Traps4x Millstones3x Ensnaring Bridges4x Time Ebbs4x High Tides4x Counterspells4x Cancels2x Howling Mines2x Mind SpringsPlease give me some more card options and keep in mind that I strongly would like to make it mono blue. Artifacts would be nice to consider as well.those are just a few cards off the top of my head4
here are a few other cards Capsize Rewind Dampen thought Consuming Vortex Counsel of the Soratami
Q: I work as an architectural draftsman for an architectural firm. I currently have an associated degree in drafting and design and am planning on getting a bachelors in construction engineeing technology. Would this degree be helpful in the archiectural field or should I pursue something else? (I do not have the option of getting an architecure degree)
may I suggest a job in grave yard as a real-estate excavator. If you have been working in the field and don't already know. it is obvious that you should be doing some thing else like digging graves or ditches. after all I am sure that you are waisting perfectly good natural resources in your current position How does it feel to know that your only contribution to this world is waisting AIR and Global warming
Q: I need to dig a trench about 180ft long, 3ft deep, and about 2-3ft wide. I want to get it done in one day, but if I really need to, I could add an extra day. What sized excavator should I rent do get this job done? I would prefer if you point me to a certain excavator and then I could rent the one that most closely matches it. Thank you!
You're only talking about 60cubic yards of material; you don't need an extremely large excavator for that amount. Even a small, tire-mounted backhoe should be able to easily handle that amount unless it is hard-packed clay, stone or oyster shell. I'm not talking about a terra-mite (a lawn mower with a backhoe attachment) but a decent sized John Deere, Case, Ford or Kubota with a backhoe. Of course, you can go all out and rent a smaller tracked excavator but there really isn't any reason to spend the extra money unless you just want to. They will make the work go quicker but the added expense is, in my opinion, not justified by the time saved. Good luck and enjoy!
Q: Where is the throttle motor for the excavator?
The throttle motor position of each company may be different. There's a stupid way to help you. You can find it along the throttle line of the engine
Q: Do you believe.
The average of TV viewers is excavator.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords