• JCD Formwork wing nuts for construction scaffolding System 1
JCD Formwork wing nuts for construction scaffolding

JCD Formwork wing nuts for construction scaffolding

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Brand Name:

JCD

Model Number:

15/17



Size:

15mm/17mm

Material:

QT450-10

Surface:

Galv.

Weight:

0.55KG

production technology:

sand casting



Packaging & Delivery

Packaging Detail:BAGS AND PLYWOOD CASES
Delivery Detail:30DAYS

Specifications

Formwork wing nuts 
1.Material:Casting Iron 
2.Surface: black, Gal.Zinc 
3.Weight:0.45KG 
4. Fit for Dia.17mm/15mm

 

Product Description

Formwork wing nuts for construction

material: nodular cast iron / ductile cast iron

surface: galvanized or natural colour

base plate size: dia.70mm / 80mm / 90mm / 100mm / 110mm

tensile strength: more than 195KN

colour: natural, white, yellow

quality level: high quality

supply ability: 800tons per month

customized: available

 

Basic Information


Product/Service (We Sell):Precast System,Scaffolding,Casting and Forging,Pipe Fitting  

Number of Employees:501 - 1000 People  

Trade & Market


Main Markets:Northern Europe
Western Europe
Mid East
Southeast Asia
Eastern Europe
South America
North America

Total Annual Sales Volume:US$5 Million - US$10 Million  

Export Percentage:91% - 100%  


Q: What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q: What are the dangers of scaffolding
The scaffold and bar for use of instability, binding is not strong or break and fall; the improper operation of the impact and accident etc.;Improper operation generally have the following situations:A. overexert, causing physical instability;B. in the frame and pull the car back walking;C. crowded collision;D. many people handling or installation of heavier components;Ice and snow on the E. frame is not clear, causing the slide.
Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q: I had my scaffold done on friday, and it's still very sore and swollen. My boyfriend's accidentally caught it a couple of times but not badly and i was wondering if the pain and swelling is normal and if there's anything i can do for it. I've been cleaning it with savlon and have been careful with it x
You should be using non ionised sea salt dissolved in warm to hot water twice a day to clean the piercing, not savlon (which is to harsh for piercings and will dry out the skin). If the piercing keeps getting caught then it is going to swell and be painful, the area has been through trauma so will be very sensitive. Although swelling at this early stage is still normal and to be expected.
Q: Scaffolding scaffolding erection norms which requirements, who can say?
This problem is more professional, we must be more professional people to answer, just do this industry, here on the simple about the content, you can refer to see.
Q: Scaffold Piercing Aftercare?Ok, so I was looking into getting an industrial piercing. However, I am very very serious about the aftercare, and I would dread any infection or anything going wrong. So, I was wondering, what are some aftercare cleaning tecniques/methods? I already know that antibacterial soap is good, as is the H20 cleaning spray stuff. And that you are supposed to clean it twice a day. But how and when should I do this? I have school which I can clean it before I go in the morning, but I don't get back until four, and then I take a shower at night always. I know it sounds silly, but are there some tips you have? Thanks!
I've had my industrial for over two years, it's a great piercing but aftercare is important and it does take awhile for it to heal. Here was my schedule for my industrial and all of my piercings since then... When I got my industrial I was in school until about 4 pm as well (I'm no longer in school now so I do it a little differently now) so this schedule might be doable for you. I took showers in the morning but that's not a huge problem. I'd wake up in the morning and while showering I'd clean my piercing with antibacterial soap AFTER I washed my hair and did my other shower rituals. Then when I got out of the shower I would do a short sea salt soaks (sea salt soaks are going to be much better for your piercing than H2O). I'd mix non-iodized sea salt in a clean new dixie cup with warm water, then I'd bend over and let my ear soak in the water for about five minutes. Sea salt soaks are great because they help promote healing and prevent/clean up infections. Then I'd go to school and after school I'd do a simple little rinse with a saline solution (which you can buy at any grocery store, usually around the contact supplies). Saline is good for when you're in a rush and don't have time to do a sea salt soak. Then at night I'd do a long sea salt soak and I'd soak my ear for about 10-15 minutes. Now for you, since you shower at night I would clean my ear with antibacterial soap every night in the shower and do a long sea salt soak after my shower, before bed. Then in the morning I'd so a short little sea salt soak before school and after school you can use a saline solution or the H2O. Good luck! This worked for me with all 6 of my piercings.
Q: I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
Scaffold/Industrial piercings definately hurt more than a regular lobe piercings because it's in the cartilage area and its pierced at a larger gauge but the pain is bareable. On a scale of 1 to 10 (10 being the worst pain) I would say an Industrial would be anywhere from a 4-6 depending on your pain threshold. Freezing it probably wouldn't be nessesssary. I got a 14g Industrial pierced on one ear and a 16g helix on the other both on the same day (the industrial was done first) and in my opinion the 16g helix hurt more. So it really depends on how well you tolerate pain
Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
(less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords