• J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM System 1
  • J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM System 2
J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM

J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 

Name

Ring Lock scaffolding system

Place of Origin

China

Brand name

CNBM

Main Material

Q345 ,Q235

Surface Treatment

High Protected Painted, Powder Coating, Electric   Gavenized, Hot Dip Gavenized.

Color

Silver

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

20ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day

Futures of the J-Stair for Arch Frame/Ladder Frame/All-round System with Q235 Q345 :

Meterial Q345 and Q 235 can be choosed.

Can offer SGS, EN75 and ISO cettifications. 

 

Description of the J-Stair for Arch Frame/Ladder Frame/All-round System with Q235 Q345  

                                               Theory Weight(KG)
 Hot Dip Galv.   Electric Galv.    Painting      PowderCoating  
J-Stair for Arch Frame 5'x6'6" (22" Treads)   40.85    37.14  37.51  37.14
J-Stair for Arch Frame 5'x6'6" (17.72" Treads)  36.70    33.37  33.70  33.37
J-Stair for Arch Frame 5'x6'4" (22" Treads)   40.67  36.97    37.34    36.97
J-Stair for Arch Frame 5'x6'4" (17.72" Treads)  36.52  33.2033.53  33.20
J-Stair for Ladder Frame 5'x5' (22" Treads)  40.5436.85    37.22    36.85
J-Stair for Ladder Frame 5'x5' (17.72" Treads)   36.19  32.90  33.23  32.90
J-Stair for All-round System2130x2000mm(17.72" Treads) 36.80  33.45  33.7833.45
Outer Handrail for J-Stair   14.16  12.88    13.0112.88
 Inner Handrail for J-Stair    9.46   8.60    8.698.60

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      

J-Stair for Arch Frame/ Ladder Frame/All-round System with Q235 Q345 CNBM


FAQ

1. What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

2.What are the certifications of your products?

Certified by SGS, BS1139, EN74, Local Test Report.

3. How long is the warranty period for your product?

Our products warranty is 2 years.

Q: How long is the service life of disc scaffolding?
Currently on the market there are many scaffolding accessories have been extended service
Q: Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q: On Wednesday day I'm planning to get this done (the top piercing). I've been thinking about it for a while now really want it.What problems can I have with this piercing?How long does it take to heal ect?Thanks =)
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
3 products have a high degree of economic, the use of more convenient and efficient in use, only need to put the plug into the hole of the ends of the cross rod pole corresponding, and then knock tightly, the quality of the demolition ride fast and overlapping is the traditional scaffold cannot do. Its erection speed is 4-8 times more than 2 times that of steel pipe scaffold. Reduce labor time and labor remuneration, reduce shipping costs to reduce the overall. The joint is reasonable in structure, easy in operation, light and handy. Vertical rod weight than the same length of the size of the bowl buckle 6-9%.
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
Q: What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q: What is the service life of the mobile scaffolding accessories?
Hot galvanized mobile scaffolding accessories for a period of 10 years or so, the surface does not require maintenance, in use without any restrictions. However, the cost is high, the raw materials needed to be more complex.
Q: Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
Q: What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords

1.100599s