• Interface  agent   New  Building Materials System 1
  • Interface  agent   New  Building Materials System 2
Interface  agent   New  Building Materials

Interface agent New Building Materials

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
200 kg
Supply Capability:
3000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

This product has excellent water resistance, improve the grass-roots plastering mortar bond strength, can effectively avoid the plaster layer hollowing, loss, shrinkage cracks and other issues, green.

usable range:

For the treatment of concrete, sand-lime brick and fly ash bricks and other surfaces, as these solve absorbent surface smooth or easy to cause bonding interface, causing plaster layer hollowing, cracking, peeling. Can greatly enhance the new 1st between concrete and mortar, concrete and plaster adhesion. It can replace the traditional concrete surface roughening process, improve surface aerated concrete plastering process, labor and cost savings. Is a modern building construction and decoration indispensable supporting materials.

Directions:

Eleven original crack treatment with a putty knife to cut the crack, try some deep, filled caulking gypsum. Attention must be tamped, fill evenly. Then place the appearance of cracks in brown paper paste, then brushing interface agent, after drying putty or doing other treatment process.

 Interface  agent   New  Building Materials


Q: What is PE waterproof cloth and PVC tarpaulin
Waterproof cloth product features and the use of attention 1. Has a waterproof, mildew function, and a light material, high tensile strength, Naisuan Jian, high temperature, easy to wash and so fold the characteristics of folding; 2. This product should be used in the process should avoid sharp impact with the sharp metal; 3. If the product is damaged, can be used to repair glue.
Q: Can acrylic materials be perforated? How to do waterproof after punching?
Anti-corrosion nine PCT board size is greater than the size of the hole, that is, just in the hole on the nine-plate, This can play a certain role in strengthening.
Q: Find the construction steps for waterproof coatings
2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
Q: How does the finished ventilator manufacturer waterproof?
In the latest country set JJCJ33 clearly stipulates that the structure to be waterproof, refers to the internal ventilation of all nodes and ventilators and roof all the nodes,
Q: Hello, roof with SBS waterproof material bulk density is how much?
SBS Styrene-based thermoplastic elastomer is the largest yield (more than 70%) of SBCs, the lowest cost and wider application. It is a triblock copolymer with styrene and butadiene as monomer. Plastic and rubber properties, known as the "third generation of synthetic rubber".
Q: What should you pay attention to before the construction of the basement waterproofing membrane?
2, the mold of the nail set: in accordance with the pre-scheduled area along the painted bottom line nail with polyethylene film wrapped wood mold. Mold to be flat, with the basic nail implementation, to prevent leakage material.
Q: I would like to ask how to do in the warm water above,
Do not know why you are in the floor to do the top of the waterproof? The We are here in the northeast of the winter is very cold, are warm, no one to warm the ground to do the above water, I think you over and over again, ah, no need, every family is warm, you have to do waterproof in the above is afraid of soaking your floor or tiles Bubble? The If the pipe really leaked, did not use the waterproof, the first warm tube must be selected, followed by your shop is good or bad, workers, water, are very important, you focus on this line on the line
Q: How can the toilet waterproof works fail?
Can only do a new waterproof, and now have engaged in the base of the waterproof coating, the effect is very good. It is best to ask professionals to do their own difficult.
Q: What are the materials used in the ceiling?
Kitchen bathroom ceiling material 3: waterproof gypsum board ????Waterproof gypsum board is in the gypsum core by adding a certain amount of waterproof plastic made of products, so waterproof gypsum board has a certain waterproof function, while gypsum board paper is also a waterproof measures, is a more widely used materials. Waterproof gypsum board with the effect of thermal insulation, but also has the advantages of fire, noise, but also an easy decoration materials. There is also a feature of the characteristics of environmental protection, due to the use of natural gypsum as a raw material, in the home environmental protection is guaranteed.
Q: Finished house bathroom waterproof household acceptance should be how to accept?
5: the use of construction stubs should be along the direction of the flow of water, lap width of not less than 100mm, the use of two or more fiberglass cloth up and down when the overlap should be staggered width of one-half.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords