• One Layer Aluminum Flexible Duct for HVAC System 1
  • One Layer Aluminum Flexible Duct for HVAC System 2
  • One Layer Aluminum Flexible Duct for HVAC System 3
  • One Layer Aluminum Flexible Duct for HVAC System 4
  • One Layer Aluminum Flexible Duct for HVAC System 5
One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

One Layer Aluminum Flexible Duct for HVAC

1. Structure of One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC is Ideal to use for air condition/ventilation system including water heater, fanner, ventilator, center air condition in hospital, hotel, restaurant, commercial building as well as industrial and residential application.

 2.Main Features of One Layer Aluminum Flexible Duct for HVAC

Advantages;

1) Easy to use, economic and financial.

2) Compared to aluminum foil duct, it is more convenient to transport and can bear higher pressure and temperature, longer lifespan.

3) Many models: ranged from 50mm to 400mm so far.

Application and benefits

 -Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 3. Double layer Aluminum Flexible Duct Images

 

One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC

One Layer Aluminum Flexible Duct for HVAC

 

 

 4. Double layer Aluminum Flexible Duct Specification

Non-insulated Flexible Duct

Structure: Two-layer aluminum foils +1 layer of PET film.

Non-insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Non-insulated Flexible Duct
(1 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm

Insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Insulated Flexible Duct
(1 Layer Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Combined Flexible Duct

Structure: flexible duct PVC jacket.

REMARK: Special structure is available according to customer's requirements

Combined Flexible Duct (PVC jacket+ flexible duct)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

1.what’s the package

10meters packed in one carton

 2.How long for your delivery time?

Normally15 working days can be served. If you need the products urgently, we can shorten the delivery time into 10 days.

 3.Do you support customer required size or dimension?

we can produce according to customers’ required.

 

Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
So good, then you recommend more. Give an address. You are not layman, too modest.
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords