HUAYUAN high-end horizontal biomass boiler--698KW
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
This boiler is 698KW one.
Introduction:
The first horizontal biomass boiler in China Brand: HUAYUAN
High-end product---Longxiao series A, B, C
Technical features:
By the great effort, HUAYUAN has developed the first biomass boiler without grate. There are three kinds of hot water boilers as following:
Longxiao Series A: blue touchscreen control system, burning any biomass fuel without dark smoke.
Longxiao Series B: colorful touchscreen control system. motor frequency control system. drain the coked fuel in the combustion procession. burning all coked biomass fuel.
Longxiao Series C: large colorful touchscreen control system. intelligent control system, internet control system. drain the coked fuel in the combustion. burning all coked biomass fuel.
Characteristics:
1. Different from tradition vertical boiler, any parts of boiler could be checked and repaired. Even the fire pipes in the boiler could be replaced without boiler disassembled.
2. HUAYUAN adopts world leading patent combustion system. Boilers without grate will need no more grate transporting to solve coked fuel burning problem.
3. High temperature in the hearth could be controlled to make sure that temperature is enough high to do biomass pyrolysis gasification and complete combustion. With specially designed
airflow spraying, tar will not be attached to the hearth after longtime combustion and pipes will not be blocked by the attached tar, it will do little effect on the boiler's efficiency after long time using, this is what users will neglect. Long-time energy saving is what matters.
4. As store is directly connected to the hearth, many biomass boilers catch fire easily. Applying anti-back fire structure and back-flow prevention device, so that only biomass fuel can be put into hearth, high temperature airflow can't flow into bunker. We are equipped with safety fire protection device, even when the back-flow prevention device fails, automatic monitoring feeding system will start to force high temperature into hearth. Boiler will stop working only after cleaning all the fuels.
5. Change the traditional boiler feeding way, decrease the feeding height of bunker, increase the capacity, reduce the labor strength.
6. Traditional biomass boiler only monitor output water temperature, Longxiao series adopts touchscreen control system, clients can monitor the parameters of temperature of input water, output water, smoke, fuels in bunker, combustion in hearth etc. After the change of relevant data, it will timely remind the user of maintenance, so that to allow user to get more information about running status and energy-saving data.
7. First one to apply internet control system in biomass fuel industry, you can monitor the boiler everywhere with internet.
8. Under intelligent control, boiler will automatically operates from start-running-stop-restart. You could be an online boiler operator with high efficiency and 6 safety protection settings.
Product specification: covers from 10*104Kcal~180*104Kcal (this list shows parts of specifications for reference)
Item | Unit | CLHS0.12 | CHLS0.24 | CLHS0.35 | CHLS0.48 | CLHS0.60 | CLHS0.73 | ||||||
Rated head | Kcal | 10*104 | 20*104 | 30*104 | 40*104 | 50*104 | 60*104 | ||||||
Rated discharge pressure | Mpa | 0(Normal pressu re) | |||||||||||
Rated temperature of outlet water | ℃ | 85 | |||||||||||
Rated temperature of return water | ℃ | 60 | |||||||||||
Heat efficiency | % | 90 | |||||||||||
Water inlet | MM | 40 | 50 | 50 | 65 | 65 | 80 | ||||||
Water outlet | MM | 40 | 50 | 50 | 65 | 65 | 80 | ||||||
Drain hole | MM | 40 | 50 | 50 | 65 | 65 | 80 | ||||||
Vent hole | MM | 40 | 50 | 50 | 65 | 65 | 80 | ||||||
electricity | KW | 1.1 | 1.5 | 1.8 | 2.2 | 2.7 | 3.2 | ||||||
size | length | MM | 2060 | 2360 | 2560 | 2790 | 2820 | 3200 | |||||
width | MM | 650 | 738 | 850 | 1010 | 1060 | 1150 | ||||||
height | MM | 1760 | 1760 | 1760 | 1960 | 1960 | 1960 |
- Q:Boiler stove 2 class G2.G3 what mean
- Note 1: Class III boiler operators can work with Class II, Class I boiler operators, Class II boiler operators can work with Class I Boiler Operators.
- Q:HIya--I have a vent pipe that goes from the boiler to the chimney---it has a few holes in it that kind of look like someone punched them into the pipe years ago--is there a reason someone may have done that? there is hot air leaving this pipe up the chimney,,,were they trying to send some of this into the basement? should I plug them? thanks for any info!
- complicated factor. try searching from yahoo and bing. that will could help!
- Q:is it possible to burn a higher quality coal in a lignite fired boiler? will there be any impact in efficiencies? i understand the reverse may not be true viz. lignite cannot be burned in an anthracite fired boiler.
- There are several drawbacks. One is the coal mills are set up for a particular type of coal, they may have to re-worked to process a much harder coal like anthracite. Also, if the boiler is designed for a lower heating value coal like lignite, the heat exchange surfaces may not be optimized for a high heat value coal like anthracite. There may be too much heat release in the water tube section and not enough heat going to the steam section. The amount of ash also affects the heat absorption in the same manner, since the anthracite will probably have less ash than lignite. This will affect the efficiency of the boiler.
- Q:My mother and I moved into the new house a few years ago and have only had the kerosene boiler serviced once. Its an OLD boiler the date printed with the model and details is 03/25/98 ( crown boiler co. ) model BD-074 WC G, Serial 159913. We don't know anything about the thing really, except how to bleed the kerosene line. And the other day the hot water pressure seems to be gone. Not sure what to do? Any suggestions of what it could be and what kind of tune up the boiler might need on a year to year basis?
- First.. Where are you getting low Hot water psi? Shower, Kitchen sink, And you say no hot water psi is it low psi or no psi at all? Your boiler has a hot water coil inside, If you have hard water, lime, the coil needs to be flushed with an acid. TO BE DONE BY A PROFESSIONAL!! Coil cleaning is using a strong acid and water mix, and you must be trained to use it. Too much acid and you burn Thu the coil, also the fumes are toxic!! Your boiler is designed to use #2 fuel oil. If your using kerosene, your wasting money. (perhaps you made a mistake and call it kerosene) Second... Oil heat requires a yearly tune up. Changing the filter, nozzle, pump screen, and a brushing of the flues. Failure to do so will drop the efficiency of your boiler and also cause damage. For the cost of a tune up, it will pay for itself in the long run. Your oil company can help you if they have a full service dept. Don't try to fix it yourself if you don't know what your doing. Heating tech's have to go to school and be licensed to work on heating equip. Be sure the person who is working on it is licensed!! You can ask to see his/her lic. first as they must carry there lic. with them while performing there work.
- Q:My boiler runs even though no water is in use and the thermostat is set below the room temperature.Is this ok ?
- It will be topping up the heat of the water in the tank.
- Q:How to turn on my boiler?
- BOILER? Do you mean Water Heater? Is it gas, or electric.... Would you please give a bit more info, and I will be glad to help you!
- Q:Could you please recommend any good universities which can offer a degree on this subject. I have a computer engineering degree but over the years, my interest for steam engines has changed to a passion and now, an obsession. I want to learn about designing small steam turbines, its fabrication, material selection, machining methods etc. Can I learn all of this under one degree? Where? Thanks !!( I think it is not possible to learn these stuff online, am I right?)
- The boiler and steam turbines are taught in heatpower engineering . These subjects are far away from computer engineering you graduated . These are basic engg. disciplene and can not be a hobby subject as in every country fabrication of these items fall under the perview of competent authority . you may undergo openuniversity courses run bu MIT for theoretical knowledge .Practical knowledge have to be gained by apprenticeship with some manufacturing industry .Generally boilers and turbines are not manufactured by same company as technology of production differs and expertise /past experience counts . You have to choose any one of the two for persuation. online courses will help you tgheoretically but you will be never able to manufacture them with that. Better to enter a collaboration with some firm producing them ,for that purpose ,
- Q:We have a 3-unit multifamily home with radiator heat (about 2400 finished square feet on 3 levels) in the DC area. I was shocked at my $350 heating bill for November, but was absolutely blown away at my $500 bill for December. Can I replace my boiler (it's at least 20 years old) with a tankless water heater to save money and energy?
- Tankless Water Heater And Boiler
- Q:My home furnace is not working properly, i just replaced the thermocouple so now the pilot stays lit i turn it to run i set my temp at a low setting 1 degree or more above current temp just like it says on the manual....stays on for about 30 seconds then it turns off (burners and pilot) completely off. i redo all the steps again and again and still the same outcome...what else do i need to replace or do.
- I am a Plumber in Boston, first thing I do on a no heat call is turn the thermostat all the way up and see what happens. There are a few reasons the main burner flame may cut out quickly. One is the Thermostat is set to close to the room temp. Another reason could be the Boiler is already at it max temprature. Without seeing it I can't say what it should be at but on a Burnham maybe 180 or 190 if you have baseboard or radiators. Unles it is the Revolution I think which is the one with the corners angled so it isn't quit square. That boilers High limit is 210 . Inside the front of the boiler is a temp pressue guage ,probably on the upper left . (Revolution is hard to see in the upper right) . If the water temp is hot you probably have a circulation problem.
- Q:The house is 4000 sq feet. The new boiler would be a Weil-McLain EG series. The boiler is in a stand-up basement area that is accessible from the outside. The contractor is quite reputable, but known to be expensive.Thanks in advance for your help.
- A year ago I priced the installation of a boiler for a friend - I was going to provide install it. Since he's an old friend, I wanted to give him a deal - materials at cost + reduced labor. I came up with just under $10K. I seriously doubt that anyone qualified to install a boiler will do all that work for $500.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HUAYUAN high-end horizontal biomass boiler--698KW
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords