• Hot Galvanized Ringlock Scaffolding for Construction and Engineering System 1
  • Hot Galvanized Ringlock Scaffolding for Construction and Engineering System 2
Hot Galvanized Ringlock Scaffolding for Construction and Engineering

Hot Galvanized Ringlock Scaffolding for Construction and Engineering

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
1000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Ring Lock Scaffolding Description 

 

Ring-lock scaffolding consists of cup-lock connector,post,cross bar,diagonal brace,base and top brace.Safe and convenient to operation,fast to assemble and dismantle,widely used in scaffolding construction,such as formwork scaffold and fitment construction.

 

 2. Main Features of the Ring Lock Scaffolding

 

 - Using less pipes

 - Easy to install

 - It can be used again and again for nearly 20years 

 - Easy to storage and transportation 

 - High degree of standardization

 - Easy and quick erection

 - Excellent stability and bearing capacity

 

3. Ring Lock Scaffolding Images

 

Hot Galvanized Ringlock Scaffolding for Construction and Engineering

Hot Galvanized Ringlock Scaffolding for Construction and Engineering

Hot Galvanized Ringlock Scaffolding for Construction and Engineering

 

4. Ring Lock Scaffolding Specification

 

 material: Q235

 tube size: 48.3*3.2mm 

surfacing: galvanized

the usual size: 0.5-3m

We can design and manufacture as per your specific requirements.

  

 5. FAQ of Ring Lock Scaffolding

 

We have organized several common questions for our clients,may help you sincerely:

1) What can we supply for you? 

We can supply base jack,ring lock scaffolding system,steel pipe/tubes,etc. 

  

2) Why choose us?  

• Decade years of experience in the field of scaffoldings 
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price.OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.

 

3) How about our after-sale service?

Any of your reasonable request will be responsed within 24hours.If you need the

supervision of installation,we could arrange one or two engineers to provide the technic service on-site.

 

 4) What about the package and shipping time?

Packing:  packed in wooden pallet in containers.  

Shipping: We have various shipping ways for our customers, such as express,by air or by sea,railway,etc.Normally it takes around one month.

 

Q: I'm asking this in favour of my friend who currently has no internet.She had her scaffold piercing done about 2 days ago and today it got knocked and started bleeding. It's been bleeding for about 3 hours now and she's worried about it.
First you gotta stop touching it, that's probably causing the irratation, hence bleeding. IT'll take time to heal, just leave it alone clean out the blood every hour or so, BE CAREFUL! and LEAVE IT IN!
Q: Found two different bowl buckle scaffold specification JGJ166-2008
Should be a fastener type steel pipe scaffolding, the two are different
Q: I had my scaffolding piercing done on tuesday (now sunday) and it is still really painful and sore. But my main concern is that the skin under the bar looks like it's being pushed down and the skin is growing around the bar? Is this bad?
Yes it is bad if I looks as if it has the skin growing around it. I would see your piercer about that.
Q: is scaffolding a trade that i could emigrate to australia with?
as it lists all the trades and professions eligible to migrate to Australia. Good luck!
Q: Japan SS 03 scaffolding system advanced
The structure, construction and convenient disassembly, basic structure and special components, allows the system to adapt for various buildings; only is composed of an upright rod and the transverse and oblique rod of three kinds of component, vertical rod and the transverse and oblique rod all made in the factory, is a maximum to prevent the traditional scaffolding activities of spare parts easily lost, easily damaged, reduce construction unit economic losses; two is no movable locking member, no security risks maximally prevent the traditional scaffolding caused by movable locking member.
Q: How much is the bowl buckle scaffold
According to the type and quality of different bowl buckle scaffold prices are not the same,
Q: A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q: What are the specifications of the bowl fastener? What kind of?
Pole commonly used specifications are: LG-300.LG-240.LG-180.LG-150.LG-120.LG-90.LG-60
Q: Iam a student from federal polytecnic damaturu in Nigeria from department of civil engineering.thanks
1. ) We really need to paint building and steel to prevent from rust, by then it will help the structure to last long..We all know that rust is one of the problem that loosen the strenght of steel.. 2.) Construction aggregate, or simply aggregate, is a broad category of coarse particulate material used in construction, including sand, gravel, crushed stone, slag, and recycled concrete. Aggregates are a component of composite materials such as concrete and asphalt concrete; the aggregate serves as reinforcement to add strength to the overall composite material.
Q: How much is the erection height of double row scaffold
Single row fastener type steel pipe scaffold erection height requirements is 25 meters, double row height doubled, is 50 meters.The single row of cuplok scaffolding height requirements on top, is 30 meters. The same double bowl buckle scaffold is doubled 60 meters.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords