Hot dipped galvanized Standard Ringlock system
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 500 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Hot dipped galvanized Standard Ringlock system
Features & advantages of hot dipped galvanized:
Nowadays, more and more scaffolding products choose hot dipped galvanized treatment. Because this type of surfacing treament has very good benifits on scaffolding!
As we know scaffolding are used in construction works, it must imfluenced by different weather, complex working environment,human use and crashes when use and storege.
So, scaffolding must suffer many,oxidations, roots and damages. So the scaffolding surface is most likely oxidated and become bad, easy to lead many accident.
So to do a good surfacing treatment to prevent oxidation is very nessessory. But differrent surfacing will have different surface using time. share a commons for these using time:
Painted:1-3month
Dipped painted:4-5month
Galvanized:2-3years
Hot dipped galvanized:5-6years.
Anyway, different treatment will worth different charges, it deponds on you choose, the life is important than everything.
Product specification:
Part description | Thicknesss | Thickness | Lenger | Steel Grade | Surface |
Standard | φ48.3/φ60 | 3-3.25mm | 500-2500mm | Q345 | Hot dipped galvanized |
Ledger/Horizontal | φ48.3 | 3mm | 600/900/1200/1500/1800/2100 | Q235 | Hot dipped galvanized |
Level diagonal | φ48.3 | 3mm | \ | Q235 | Hot dipped galvanized |
Brace/diagonal | φ48.3/φ42 | 2.5mm | \ | Q235 | Hot dipped galvanized |
Production applications:
Our this ringlock system is produce by us Gainford, got good control from income material to end products. Whole product system has big load capacity and multi function benifits, suitable for many purposes, such as bridge construction,boat building,outlook frame for building,railway construction,oil and gas projects and so on.
With it fast erection and good convinient, it could be use for stage, show platform, outdoor AD landmarks and so on.
Welcome send inquiry to us for more info, we glad to support you. !
- Q:What is the distance from the external walls of the scaffolding and scaffolding?
- Common terminology in the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG
- Q:What kind of insulation materials and equipment are allowed to be imported in China?
- What kind of insulation materials and equipment are allowed to be imported in China?
- Q:Can the fifteen typhoon blow up the three - storey house?
- Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
- Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
- Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
- Q:How to do a good job of typhoon during the mass transfer mobilization work
- strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
- Q:What is the most important safety hazard at the construction site?
- Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
- Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
- Especially when the project quality accident and other accidents need to be investigated, the supervising enterprise or the supervisor is often in a passive state of fear or fear , With the resignation of life to describe the situation at this time and then appropriate
- Q:What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hot dipped galvanized Standard Ringlock system
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 500 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches