Hot Dip Galvanized Scaffolding Tube 48.3*3.0*6000mm Q235B Steel Standard EN39/BS1139 for Sale CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Galvanized Scaffolding Tube 48.3*3.0*6000mm Q235B Steel EN39/BS1139
Material :Q235B/Q345B
Size : 48.3*3.0*6000mm
Surface treatment :Black/Painted/Galvanized
Standard:EN39/BS1139
Futures of Galvanized Scaffolding Tube 48.3*3.0*6000mm Q235B Steel EN39/BS1139Galvanized Scaffolding Tubes confirm to BS 1139/BS EN 39 Standard. We have a big factory producing galvanized Scaffolding tubes 25,000 tons each month, and 90% of them are for export. Our scaffolding tubes are widely used in all kinds of construction site such as oil and gas industry, refinery industry and infrastructure in over 20 countries.
We have a wide range of round scaffolding tubes. If you require a specific size, such as different thickness or different length, please send us your detail requirements. Our quotation will always base on your requirements.
Hot Dipped Galvanized Scaffolding tubes are also known as scaffolding pipes, scaffolding poles, and galvanized steel tubes, round galvanized tubes.
Size: 48.3 X 3.0X 6000mm
Zinc Thickness: 40 micron
Surface: hot Dipped Galvanized
Water Proof: according to customer requirements.FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: How to solve the problem of scaffold pipe repair
- In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
- Q: what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q: I couldn't believe it, but yes it happened...
- Physics worked in his favor. No God stuff. Really! Become an Atheist. Very simple. No God to fear. No dogma. A life more moral than that of Christians.(statistically proved) Subject to the rule of law by consensus of democracy not the autocratic law of a god. Death is not to fear nor rejoice. Its just like fading into a deep, untroubled sleep. Be happy. Treat people justly. The Truth Will Set You Free
- Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
- Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
- Q: Fastener type steel pipe scaffold accessories
- fastenerFastener type steel pipe scaffold fastener malleable iron casting should be adopted, its basic form has three kinds: vertical cross bar for a connection between the rectangular fastener, fastener for rotating connecting parallel or oblique bars and rods for butt joint butt joint fastener.
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- (3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
- Q: Latch type disc scaffolding accessories is a national patent product
- Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
- Q: Introduction of external scaffolding
- 2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m<l = 4m4m<l = 6.5m = 12 = 206 level bar, inclined bar bending steel pipe L = 6.5m = 302) from drilling pipe.
- Q: Fastener type steel pipe scaffold composed of which components?
- Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Send your message to us
Hot Dip Galvanized Scaffolding Tube 48.3*3.0*6000mm Q235B Steel Standard EN39/BS1139 for Sale CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords