Hoist for building construction
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 50 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Guangxi Heqing Construction Machinery Manufacture, established in 2004, is a private enterprise specializing in R&D, designing, manufacturing, selling and leasing of construction machinery, mainly producing builder hoist, mast climbing work platform, superdeck loading platform, temporary suspended platform, building maintenance unit etc.
Taking product sale and leasing as the basic market strategy, the company has effectively built “Heqing” and provided steady cash flow. On one hand, it pushes the independently developed builder hoist, mast climbing work platform, superdeck loading platform, suspended platform and other standardization products to Germany, Sweden, Australia, Malaysia, Singapore, India, etc.; on the other hand, it energetically expands leasing business of builder hoist, superdeck loading platform, suspended platform and other products. Till now, we have established leasing branches in Guangxi, Beijing, Shanghai and etc. Besides, according to the different requirements of customers, our company actively develops design, production, sale and other business of building maintenance system, steel aluminum shuttering and other non-standard building machinery and metal parts.
High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.
Our “Heqing” concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.
【Corporate Vision】
Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
【Core Values】
Quality: High quality, innovation, safety and reliability.
High quality is the basis of the enterprise.
Innovation is the soul of the enterprise.
Safety is reverence to life.
Reliability wins the trust.
Service: Customer focused, customers are existence value of Heqing people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
【Spirit】
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Yuhuaxing to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Heqing people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work
- Q: Elevator to the second floor, when the man turned out and smiled at her. When the door closes, she suddenly darling up to the third floor .. The woman is dead. Q: Do not cancel the third floor of the case how can let her survive? More
- If you see it, the child is still running on the side of the elevator door .. assault .. then, run away .. there is a chance .. either is the door .. do not say no. It was boring for a few times before it was a few times .. It was the two hands and the left and right, and when it reached the floor, it would not open the door.
- Q: How can the elevator handle?
- First floor, a look at the outsiders do know the layman on the fills, but also the idiot of the experts to teach others if it is a power outage, then immediately from the big numbers to a small number of times, so that the elevator can be a buffer every time that is a power outage , But also to press, your hands OKorder and OKorder guilty cunning armor for the anchor machine no electricity, and still there, press the phone can not answer the phone in addition to this sentence if the elevator is broken, it should be inside the elevator Of the sirens notice outside, or call (but the elevator inside the signal is not very good). The other is fart if the elevator off the person, you should press the elevator inside the alarm and the above intercom call to inform the outside and duty room, no one can use the phone to answer, no signal can beat the door, where the elevator flow Are relatively large, so do not worry about others do not know the elevator inside the air is flowing, do not worry will suffocate, because it is not sealed
- Q: What is the elevator device code?
- First, the elevator equipment classification code by the four Arabic numerals, said: Second, the elevator registration code: registration code by the equipment classification code, administrative division code, registered year code, sequence code composition (a total of 20).
- Q: What is the elevator called? A word in the smoke alarm. Thank you! Question added: fire switch, moving switch elevator will return to the first floor ... please explain some of the details ok, thank you! Reply: Thank you for the answer 紶 Flower official arrest dumpling rule evil spear, all good! But still do not quite understand that the fire elevator needs this switch, the fire is prohibited to use the elevator ---, do not fire the elevator did not return to the first floor? What else is an election ladder and an optional ladder? Thank you! More
- Back to the first layer of meaning
- Q: How to set the elevator shaft
- Oh, you are asking the elevator shaft in the budget of the project problem, there are the following items 1, the implementation of steel reinforcement corresponding project 2, concrete concrete implementation of the corresponding project < ; 3, the template in the fixed in a proprietary, is the elevator shaft wall template, in practice, you can also use the shear wall project 4, elevator shaft frame This is the scaffolding in the project 5, you see the construction organization design, There is a corresponding process requirements, there will be no drawings such as bolts and other materials, this do not forget to calculate
- Q: Solve this problem.
- In the men pull the knife to the 3rd floor, according to individual buildings
- Q: Inside the elevator inside the number of buttons "1" below a letter "B", what does that mean? Question added: "B" is optional? More
- No meaning, just a code, if you like it, with A B C D .... can be similar to some people in the 4 layer do not want to use 4 to directly represent, with 3A, 13A, 23A and other subtitles Instead, of course, you like the words with 3X, 13X, 23X ... ... can be.
- Q: The above questions are in the civil design code 6.8.1. But do not know what reason. More
- Just to prevent more than 4, the elevator came to see it, because the elevator hall into the deep limited, it may not know the elevator door opened. The The...
- Q: How can an elevator stop at the floor where you want to dock? Why the general height of the error is very small, very few elevator doors open, the elevator is not the ground and the ground alignment of the situation? If the wire rope encountered thermal expansion or contraction or long harvest and make up the ancient use of the current period, will not produce the length of change? This will not make the elevator dock can not be aligned with the floor of the floor? There is no possibility of docking with the ground floor height error of tens of centimeters, people need to climb out of the situation? More
- In the outer door of the elevator along a limit switch! Under normal circumstances under the control of the elevator in front of the floor will be close to the front of the deceleration! And then slowly cut into pieces and make up the old table, The bar stopped the switch, the car stopped! Basically there is no "occurred when the ground with the ground floor height error of tens of centimeters" of the situation! Because it is mechanical control, so when the power outage does not matter! People are trapped inside the elevator! And the elevator car did not reach the position before the floor will not open the door! Because there is a layer of the door lock! Must be when the top of the car on the top of the top of the roof lock, Open! This is also purely mechanical!
- Q: How does the elevator work?
- Both ends are attached to the car and the counterweight, winding in the traction wheel and guide wheel, the traction motor through the reducer after the speed of the traction wheel driven by the traction rope and traction wheel friction caused by traction, Car and heavy lift movements, to achieve the purpose of transport. The guide shoe fixed to the car can be moved down and down along a fixed rail mounted on the building shaft wall to prevent the car from skewing or swinging during operation. Normally closed block brake in the motor work when the loose gate, so that the elevator running, in the event of loss of electricity braking, so that the car stopped lifting, and in the designated station to maintain its static state for personnel and goods access. The car is a box component that carries passengers or other loads, which is used to balance the car load and reduce the motor power. The compensating device is used to compensate for the change in tension and weight in the movement of the hoisting rope, so that the load of the traction motor is stable and the car can be accurately stopped. Electrical system to achieve the control of the elevator movement, while the completion of the selection layer, leveling, speed, lighting work. Indicating that the calling system is always showing the direction of movement of the car and the location of the floor. Safety devices ensure safe operation of the elevator.
Send your message to us
Hoist for building construction
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 50 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches