• High Tech 260 Rotary Drilling Rig New Design for Sale System 1
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 2
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 3
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 4
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 5
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 6
High Tech 260 Rotary Drilling Rig New Design for Sale

High Tech 260 Rotary Drilling Rig New Design for Sale

Ref Price:
$100,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

High Tech Rotary Drilling Rig New Design for Sale 

High Tech 260 Rotary Drilling Rig New Design for Sale

Product Features:

 

 Features of   Chassis :

>>It is high working stability   equipped with expert chassis Which is under advanced design. 
  >>It is controlled to extend when working and retract the crawlers by   fully hydraulic with The proper center of Gravity design to make the drilling   rig with high stability.  

 


 

 Drill Mast:

>>Auto lift and fall of the drill   mast, convertible and Three section of box-type of drill mast reduce the   length and height;
  >>Parallelogram articulated and triangle cylinder positioning   supporting arm structure actualizes the high stability and rigidity and easy   lifting and falling; 
  >>Install gooseneck boom-cylinder on gooseneck boom and telescopic   supporting leg in bottom of the drill Mast to increase the working   efficiency.


 

 Features of upper   frame:

>>Unique body lever, use bracket   for upper frame, adopting the leveling cylinder is better than mast leveling,   and makes the operator more comfortable.


 

 Features of   engine:

>>Volvo boostmid-coolelectrical control   for engine,strong momentum,it can work at the place with 4,500m above sea   level with normal condition, Euro 3 emission standards.


 

 Features of rotary   drive:

>>Double-motor, double-reducer in   the rotary drive, powerful output torque, high ability of stressing. It is   with good adaptivity, the speed and output torque can auto-change with   different geological conditions; 
  >>It is installed hydraulic circle systems for separated lubricationcooling and speed changing system to ensure the reliability and   high effciency of power head.

 


 

 Features for   operating cabin:

>>The operating cabin to supplying   the comfortable working place for operator is with all-weather design,adopt   sound-proof material,elastic shock absorberimported adjustable seat, environmental air conditioner. 
  >>The layout for all the apparatuses and operating rods are clear, easy   operating. Colorful LED display, monitor the positioning of pile, the   balancing of the drill mast and the functions of the engine and hydraulic   system.

 


 

 Features for   hydraulic system:

>>Main hydraulic pump system,   hydraulic pilot-operated, constant power control.
  >>Hydraulic auxiliary pump system: load-sensitivity, hydraulic   pilot-operated, proportion control, fast responding, low energy consumption;   adopt unique load-flow control valve.
  >>Unique lubricated circuit for rotary drive: solve the problem of   mixing oil between lubricant oil and hydraulic oil.
  >>Balancing valve: the balancing valve for amplitude cylinder and drill   mast cylinder with non-pressure design make the speed lifting and falling   more stable for drill mast and amplitude mechanism to prevent the big shock.

 


 

 Features for   control system:

>>It can be real time monitored by   integrated electronic control system when working, and featured with 16   warning functions.
  >>Verticality automatic leveling system of drill mast can monitor the   lifting and falling and control the verticality of drill mast.
  >>Dynamic and digital display of all execution components on   intelligent diagnosis system.
  >>Rigorous logical interlocking control to prevent wrong operation by   operator.
  >>Accurate measurement for drilling depth: the mistake can be   controlled less than 10mm, 1mm for drilling depth by unique depth measurement   device.

 


 Features for   operating system:

>>Display operation: set up every   limit unlocklevel the   perpendicularity of drill mastthe reset of state   parameter of working for engine,set up the logical relationship of drilling   rig.
  >>rod operation:
  A.main work:CW/CCW for rotary drive; rotation of upper frame; operated by a   press or draw hydraulic cylinder;drilling tools lift and fall.
  B.auxiliary work:lift and fall of luffing mechanism; rotation of upper frameauxiliary winch lift and fall.
  C.operating rod for working mechanism:forwardbackward and turn around of the main machine.
  D.operating for drill mast:operating the rod to make the drill mast lifted   and fell.

Parameter:


ParameterModelTW260
Max.drilling Diameter (mm)Distance From Center Of Rotary Drive To Slideway Of Mast1040
Max.drilling Diameter2200
Max.drilling Depth(m)
80
EngineRated Power(kw)tab1241 354
Max.output Speed(TW/min)2100
Rotary DriveMax.output Torpue(kN.m)260
Output Speed(TW/min)8~32
Main WinchMax.lifting Force(kN)250
Diameter Of Steel Rope30
Auxiliary WinchMax.lifting Force(kN)100
Diameter Of Steel Rope20
Mast InclinationSide Inclination (°)5
Forward Inclination (°)5
Backward Inclination(°)90
Pull-Down CylinderMax.pull-Down Piston Push(kN)220
Max.pull-Down Piston Pull(kN)240
Stroke(m)5.3
UndercarrigeTrack Total Length(mm)5800
Track Plate Width(mm)900
Track Width(mm)3200~4400
Max.traveling Speed(km/h)1.7
DimensionWorking Condition Dimension(mm)10940×4400×23900
Transportation Dimension(mm)3500×3200×16600
Upper Frame Height(mm)1400
Upper Frame Width(mm)3000
Undercarrige Height(mm)1300
Rotary Radius(mm)4420
Overall Weight(t)
82


Application of prodcts:


FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


Q: What are the preparations for the piling site?
1, the pile position determination: according to the project provided by the construction unit and the pile axis location map of pile location, pile location must be accurate, and in the pile position by a soldering iron drilling, hole depth is 15~20cm, filled with lime, prevent in the process of driving the wrong pile.2. Pile up(1) pile stacking shall be determined by pile driving route and pile driving sequence(2) the site shall be level and level with three passes and one leveling. Remove obstacles in the ground, underground and air in the range of the moving of the pile driver. The wooden posts and the pile rings shall be of the same position, except for the contact between the pile and the pile, and nothing else shall be in contact with the pile so as to prevent cracks in the pile.(3) the strength of reinforced concrete precast piles must be up to 100% before they can be transported and piled3, the selection of pile machineAccording to the design of single pile bearing capacity and pile length, this project intends to use hammer weight 2.5t track type diesel pile driver.
Q: I've heard that the pile driver's pay is high. I want to study. Also please seniors pointing. Be deeply grateful!
There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open.
Q: What's the difference between a walking tube type diesel pile driver and a track type diesel pile driver?
The piling machine works on the top and bottom of the pile hammer. The pile hammer moves up and down on the 2 rail. It is called a track type diesel pile driver, and the pile hammer operates in the pipe way up and down. It is called a tube type diesel pile driver
Q: Requirements of waveform guardrail column piling skills training program and training program.
B, anti blocking blocks, wave beam, end installation(a) after installing the upright column, the bracket (block block) can be installed. The bracket (stop block) is fixed between the wave beam and the upright post through the connecting bolt. The bracket (block) shall be adjusted to make it in place before tightening the connecting bolts.(b) the wave beam is spliced with each other by a splicing bolt and is fixed by a connecting bolt bracket (an anti blocking block), and the direction of the overlap of the roadbed guardrail and the corrugated beam is the key of the installation, and the installation is carried out in strict accordance with the drawing. The direction of overlap shall be consistent with the driving direction. The wave beam should be adjusted continuously during the installation. Therefore, the connecting bolts and the splicing bolts should not be tightened too early so that the long holes in the corrugated beam can be adjusted in time during the installation process so as to form a smooth alignment and avoid local irregularities. When the alignment of the guardrail is considered satisfactory, the bolt can be screwed at last. The connecting bolt between the bracket (stop block) and the wave beam should not be screwed too tight, so that the temperature stress can be adjusted by using a long round hole.(c) the end beam is spliced with standard section guard bars through splicing bolts. The construction method of the end beam is basically the same as that of the wave beam.
Q: The pile driving team has many years of piling experience, to undertake the construction of large and small piles, includingKongguanzhu
To consider how the site can take back the unearthed excavation method is ABC pile test done to dig a long tight schedule but also increase the test equipment such as AC two AC after completion of the test sequence can also do a ramp to the middle of the excavation
Q: What are the types of hammer pile drivers?
There are diesel tube pile driver, power source brand, Zhong Zhong brand, and Zhejiang is very popular guide rod hammer
Q: Is there a construction site for solar powered PV pile drivers?
Not necessarily. The main aspect is related to the structural characteristics, height and load of the proposed building, and the other major aspects are geological conditions, such as formation, geotechnical properties, strength, distribution, depth of burial, etc..
Q: What are the general safety hazards of temporary power and piling machines in the construction site?
3, the night construction should be safe and meet the lighting, lighting equipment and components should be consistent with the quality of the current national mandatory standards, not allowed to use insulation aging or damaged appliances and devices. In the event of a sudden power failure, the staff needs to evacuate the working place in time, it is necessary to install emergency lighting equipment with its own power supply.4, mobile power tools, hand-held power tools should be maintained before use, grounding, and the use of safety voltage. Electric tool load line should select type of weather resistant rubber sheathed copper cable and any joint. When using hand-held power tools, it is necessary to wear and wear protective clothing according to the rules.5, the use of self generating units, there should be special management.
Q: How do I maintain the hydraulic pile driver I bought?
the workload of the project; the geographical environment of the project; and the price the boss expects.
Q: What is the depth of the pile? What is the principle of hydraulic pile?
There are many kinds of piles, such as powder jet pile, which is the foundation pit support; the engineering pile is to improve the bearing capacity of the foundation............The depth of pile driving is related to many factors, such as underground bearing stratum and ground loadThe principle of hydraulic pile is simply to press the pile into the ground by hydraulic principle

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords