• High Tech 260 Rotary Drilling Rig New Design for Sale System 1
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 2
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 3
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 4
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 5
  • High Tech 260 Rotary Drilling Rig New Design for Sale System 6
High Tech 260 Rotary Drilling Rig New Design for Sale

High Tech 260 Rotary Drilling Rig New Design for Sale

Ref Price:
$100,000.00 - 500,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

High Tech Rotary Drilling Rig New Design for Sale 

High Tech 260 Rotary Drilling Rig New Design for Sale

Product Features:

 

 Features of   Chassis :

>>It is high working stability   equipped with expert chassis Which is under advanced design. 
  >>It is controlled to extend when working and retract the crawlers by   fully hydraulic with The proper center of Gravity design to make the drilling   rig with high stability.  

 


 

 Drill Mast:

>>Auto lift and fall of the drill   mast, convertible and Three section of box-type of drill mast reduce the   length and height;
  >>Parallelogram articulated and triangle cylinder positioning   supporting arm structure actualizes the high stability and rigidity and easy   lifting and falling; 
  >>Install gooseneck boom-cylinder on gooseneck boom and telescopic   supporting leg in bottom of the drill Mast to increase the working   efficiency.


 

 Features of upper   frame:

>>Unique body lever, use bracket   for upper frame, adopting the leveling cylinder is better than mast leveling,   and makes the operator more comfortable.


 

 Features of   engine:

>>Volvo boostmid-coolelectrical control   for engine,strong momentum,it can work at the place with 4,500m above sea   level with normal condition, Euro 3 emission standards.


 

 Features of rotary   drive:

>>Double-motor, double-reducer in   the rotary drive, powerful output torque, high ability of stressing. It is   with good adaptivity, the speed and output torque can auto-change with   different geological conditions; 
  >>It is installed hydraulic circle systems for separated lubricationcooling and speed changing system to ensure the reliability and   high effciency of power head.

 


 

 Features for   operating cabin:

>>The operating cabin to supplying   the comfortable working place for operator is with all-weather design,adopt   sound-proof material,elastic shock absorberimported adjustable seat, environmental air conditioner. 
  >>The layout for all the apparatuses and operating rods are clear, easy   operating. Colorful LED display, monitor the positioning of pile, the   balancing of the drill mast and the functions of the engine and hydraulic   system.

 


 

 Features for   hydraulic system:

>>Main hydraulic pump system,   hydraulic pilot-operated, constant power control.
  >>Hydraulic auxiliary pump system: load-sensitivity, hydraulic   pilot-operated, proportion control, fast responding, low energy consumption;   adopt unique load-flow control valve.
  >>Unique lubricated circuit for rotary drive: solve the problem of   mixing oil between lubricant oil and hydraulic oil.
  >>Balancing valve: the balancing valve for amplitude cylinder and drill   mast cylinder with non-pressure design make the speed lifting and falling   more stable for drill mast and amplitude mechanism to prevent the big shock.

 


 

 Features for   control system:

>>It can be real time monitored by   integrated electronic control system when working, and featured with 16   warning functions.
  >>Verticality automatic leveling system of drill mast can monitor the   lifting and falling and control the verticality of drill mast.
  >>Dynamic and digital display of all execution components on   intelligent diagnosis system.
  >>Rigorous logical interlocking control to prevent wrong operation by   operator.
  >>Accurate measurement for drilling depth: the mistake can be   controlled less than 10mm, 1mm for drilling depth by unique depth measurement   device.

 


 Features for   operating system:

>>Display operation: set up every   limit unlocklevel the   perpendicularity of drill mastthe reset of state   parameter of working for engine,set up the logical relationship of drilling   rig.
  >>rod operation:
  A.main work:CW/CCW for rotary drive; rotation of upper frame; operated by a   press or draw hydraulic cylinder;drilling tools lift and fall.
  B.auxiliary work:lift and fall of luffing mechanism; rotation of upper frameauxiliary winch lift and fall.
  C.operating rod for working mechanism:forwardbackward and turn around of the main machine.
  D.operating for drill mast:operating the rod to make the drill mast lifted   and fell.

Parameter:


ParameterModelTW260
Max.drilling Diameter (mm)Distance From Center Of Rotary Drive To Slideway Of Mast1040
Max.drilling Diameter2200
Max.drilling Depth(m)
80
EngineRated Power(kw)tab1241 354
Max.output Speed(TW/min)2100
Rotary DriveMax.output Torpue(kN.m)260
Output Speed(TW/min)8~32
Main WinchMax.lifting Force(kN)250
Diameter Of Steel Rope30
Auxiliary WinchMax.lifting Force(kN)100
Diameter Of Steel Rope20
Mast InclinationSide Inclination (°)5
Forward Inclination (°)5
Backward Inclination(°)90
Pull-Down CylinderMax.pull-Down Piston Push(kN)220
Max.pull-Down Piston Pull(kN)240
Stroke(m)5.3
UndercarrigeTrack Total Length(mm)5800
Track Plate Width(mm)900
Track Width(mm)3200~4400
Max.traveling Speed(km/h)1.7
DimensionWorking Condition Dimension(mm)10940×4400×23900
Transportation Dimension(mm)3500×3200×16600
Upper Frame Height(mm)1400
Upper Frame Width(mm)3000
Undercarrige Height(mm)1300
Rotary Radius(mm)4420
Overall Weight(t)
82


Application of prodcts:


FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Company Information

China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!

CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.

Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.


Q: If so, ask what it works forThe pile hammers I've seen before all have a steam hammer, and this one doesn't know how it works.
A static pile driver that presses the cylinder into the ground with the machine! Foundation reinforcement!
Q: The working principle of a pile driver ship
The pile hammer is attached to two parallel vertical guide rods at the front of the pile support frame and is hoisted by the pile frame, and the front of the pile support is provided with a guide frame.
Q: How to maintain the pile driver daily?
(1) engine parts: washable air filter, oil filter, diesel filter net. Release the fuel tank deposits and clean the fuel tank strainer. Check the main engine crankcase lubricating oil and clean the respirator. Check and adjust the tightness of generator belt and fan belt, and lubricate fan bearing. Check the water leakage of the pump and clean the oil outside the water tank. Check the flywheel connecting screws and connections with no breaks and replace them if necessary. (2) walk and control mechanism. Inspect the lubrication surfaces of each gear box and reducer. Add lubricating oil according to the standard level. Check the bearing wheel, idler pulley, driving wheel and axle bush, add enough lubricating oil and grease. The check and adjust the track tension, full track bolt tightening.
Q: Pile driver model, which brand is better?
Small rotary drilling rig and small pile driver, the foundation pile foundation, compared to the screw pile driver, can meet all kinds of large-scale infrastructure construction requirements.As for the piling machine brand small piling machine is recommended a Matlock in Hunan, the drilling machine is widely used in city high-rise buildings, railways, highways, bridges, airports, ports and other pile foundation engineering irrigation pile construction, has wide application range, high construction efficiency, stable performance, and thoughtful service, environmental protection and energy saving the advantages of.
Q: Highway guardrail, piling machine, drilling, piling price
Highway guardrail, piling machine, drilling, piling price8-10 contact me
Q: How many hours will it take for the 200 piles and the 1 pile drivers?
Because there is a piling process: measurement line - out pile connection - send pile inspection -- moving pile pile machine in place -- the original check -- prefabricated pile precast pile lifting pile stabilizing pile -- -- --.It depends on what kind of pile, the diameter of the pile, the geological condition, the construction site, the construction organization and so on.Taking prestressed pipe pile of 18M as an exampleAbout 20 per day, about 10 hours / day, and that is exactly every half an hour. This refers to the "stability, pressure, connection and delivery" critical progress, because other schedules can be arranged in parallel. While not completely parallel arrangement, the efficiency drops by half, that is, it takes 1 hours to hit a pile.So it takes a lot of skilled workers to finish the job faster.
Q: What are the general safety hazards of temporary power and piling machines in the construction site?
3, the night construction should be safe and meet the lighting, lighting equipment and components should be consistent with the quality of the current national mandatory standards, not allowed to use insulation aging or damaged appliances and devices. In the event of a sudden power failure, the staff needs to evacuate the working place in time, it is necessary to install emergency lighting equipment with its own power supply.4, mobile power tools, hand-held power tools should be maintained before use, grounding, and the use of safety voltage. Electric tool load line should select type of weather resistant rubber sheathed copper cable and any joint. When using hand-held power tools, it is necessary to wear and wear protective clothing according to the rules.5, the use of self generating units, there should be special management.
Q: What safety measures should be taken when assembling a pile driver?
4, mechanical equipment installation and transportation safety mattersThe mechanical equipment should be installed in a safe place, not in the rock slope landslide, or may be installed by flood invasion and flying stone in place, to ensure personal safety and machinery.The room layout shall be constructed according to the mechanical instructions or actual needs. Room to ensure mechanical windproof and rainproof, antifreeze and other requirements, to the appropriate area, convenient operation and maintenance, and adequate lighting, good ventilation, shutdown protection facilities for temporary use of machinery should be necessary.Mechanical equipment shall be installed according to the instruction manual and relevant regulations. After installation, safety inspection and performance test shall be carried out, and may be put into use after the test operation has been qualified.When the mechanical equipment is transported, make sure the binding is firm, the center of gravity is reliable, the brake is reliable, and the traffic safety is ensured.When mechanical equipment is unloaded, be sure to handle with care, forbid to throw and throw off from the car, use dump truck to transport machinery, forbid dumping with dumping method.
Q: How many meters per day can a foundation shovel in Luoyang be 80 centimeters in diameter? Is it easy to damage?
About 8 meters per hour, durable, bad, are spare parts, such as wire rope, brake, triangle belt, but do more work, it will earn!
Q: What's the use of a pile driver?
The pile driver is used for the soft foundation treatment of buildings, high-speed railways and so on. First, drilling and pouring concrete,

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords