• aluminium scaffold tower, aluminium tower scaffold System 1
aluminium scaffold tower, aluminium tower scaffold

aluminium scaffold tower, aluminium tower scaffold

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Brand Name:

safe scaffolding

Model Number:




materials:

aluminium alloy 6061 D 50.8mm, 51.5mm

certificate:

GS, CE, ISO, SGS

length:

2m, 2.5m, 3m

height:

3m-20m

Sea port:


delivery time:

5-25 days after received your deposit

paymeng terms:

TT LC DP DA

width:

0.75m, 1.35m

pipe thickness:

1.7mm, 2.0mm, 2.5mm, 3mm

Packaging & Delivery

Packaging Detail:Package 1pc/polybag/two paper head
Delivery Detail:5-15 days after receive your deposit or L/C

Specifications

Certificate: GS, CE, SGS, ISO 
Materials: aluminum alloy 6061-T6 
50.8*2m, 51.5* 2mm, 2.5mm 
L: 2m-3m, W: 0.8m, 1.4m 
H: 3-20m

 

Products advantages: 

Special design can be used for limited space, such as narrow footpath and passage, 
It can be built in the elevator or other stair.
Steady and parts high utilize rate. Our ladder have enough strength, to fit for building site's circumentsance, while you only need spend short time to remove and put all of them into microbus, easy to carrying. 

 

Products  Characteristic:

1. Flexible frame parts ensure you increase work height 0.5m step by step, erect height you need. 2. Easy handling and structures, can be a single set of independent use.

3. Use aviation aluminum alloy materials durable, stable and reliable.

4. Work platform can be built in each rung, two rung interval 0.4m.

5. Passed SGS safety standard and GS certification.

 

Products detail:

1. Frame: width 0.8m, height 1.5m, 2m, handrial: width 0.8m, height 1m.
2. Single width: Can choose: 800*2000mm, 800*2500mm, 800*3000mm.
3. Tower height: Can choose from 2m to 10, special design can be up to 20m.
4. Carrying capacity: total load 900kg, each plank max 272kg.
5. Materials: Dia 51.5mm, 50.8mm, aluminum alloy 6082-T6/6061-T6.
6. Thickness: 1.7mm, 2.0mm, 2.2mm, 2.5mm, 3.0m.


Q: What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(4) the bearing capacity is large: the vertical rod connection is a coaxial core socket, and the cross bar is connected with the vertical rod by a bowl buckle joint. And the axial line of each member is placed at one point, and the node is in the plane of the frame. (the entire frame bearing capacity, about the same clear fastener type steel tube scaffold condition is improved by more than 15%,)
Q: I've had my scaffolding piercing for about a week now and when cleaning i've just dabbed the hydrogen peroxide and salt water around my ear. However i read that i should be rotating it when cleaning it. Should i rotate it after only a week?
you dont need to rotate a scaffolding piercing because its in such a place that it will rotate on its own throughout the day/night
Q: What are the characteristics of disc scaffolding
Disc scaffolding and scaffolding, for manufacturers, construction units, rental units refer to a scaffold, just two different names. The same scaffolding.
Q: i have my nose pierced and am thinking about getting a scaffold cartilage piercing, but am affraid because your cartilage is so tough! and i know it depends on the person when it comes to pain, but just compairing it to a nose piercing? (when i got my nose pierced i cried, but once they finished piercing it, i wasn't in anymore pain)
if you get it done with a gun it doesnt hurt at all but you shouldntget it with a gun cz it can shatter ur cartilage . i dont think it hurts at all i pierece mine all the time i ahve about.. 8 in each ear i did them all myself it doesn hurt me tht bad after woards its tender to the touch tths it tho .aah
Q: How to calculate the double wall scaffolding
The adjustment coefficient of the bearing capacity of the foundation: KC = 0.400;The average pressure of the bottom of the vertical rod foundation, P = N/A =84.900 kN/m2;Among them, the superstructure to the top surface of the axial force design value: N = 7.641 kN;Basal area (M2):A = 0.090 m2.P=84.900 = fg=200.000 kN/m2. Calculation of bearing capacity of foundation!
Q: What is a bar in the scaffold
Scaffolding in the cross section of the large cross bar, small cross bar.Large cross - vertical horizontal bar, which is located along the vertical axis of the scaffolding rod.A small transverse rod, a horizontal rod, which is horizontally arranged along the scaffold.
Q: Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q: What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
Take them on the road-trip of course....we'll find some use for them along the way.....
Q: Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
Helix will be less painful. It's kind of obvious that it would be a helix is probably one of the easiest piercings you can get I got mine done when I was like 13 and I didn't even flinch getting it done. A scaffold is definitely more intense. After all there are 2 incisions for this piercings so it's gong to be twice as tough. It's sore haling too, the bar is awkward and when it moves it hurts. A helix is far easier :)
Q: What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords