• High Preformance Concrete Placing Boom delivery concrete System 1
High Preformance Concrete Placing Boom delivery concrete

High Preformance Concrete Placing Boom delivery concrete

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Engineering Construction High Preformance Concrete Placing Boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q:How to distinguish tower type distributor and general distributor?
Avoid large arm distortion caused by huge pressure and vibration of concrete pump during construction
Q:What is a fixed concrete distributor?
Concrete distributing machine: special concrete pouring equipment for construction, design and production of railway beam yard and nuclear power plant
Q:What are the benefits of concrete handling machines?
Concrete distributor; material ratio; sling construction; fabric safety
Q:How to fit the cloth rod of the distributor?
Build a frame with a cloth pole for bearing and inspect and check the bearing capacity of the stressed part, the reinforcement condition of the double fasteners and the stability of the foundation
Q:What do concrete pumps and fabrics mean?
People need to arrange for pouring concrete tubing, split pipe, guard, pump handle up too much trouble
Q:What are the acceptance items of concrete spreader?
Good mechanical properties, meet the technical standards in the specification, is strictly prohibited in the pressure pipe and tubing in open pipe joint, no end of the hose, and let the arm pull down another rigid connection pipeline, rotary process, no brakes or do reverse operation in the machine when not parked
Q:What is the structure of a concrete distributor?
The vertical pipe has a rotary joint Gu card. By pulling the manpower, the whole turning part can be turned 360 degrees
Q:What's the design plan of the concrete spreader?
The belt conveyor head sweeper is designed for the special requirement of conveying concrete and cleaning mortar. The scraper is made of hard alloy material, with a rectangular section, and it does not hurt the adhesive tape and the mortar loss is small
Q:How to maintain the concrete spreader?
Four screw high precision quantitative cloth is adopted, and the error of cloth quantity is less than 2%. According to the field process, the traveling speed and the cloth speed are stepless flexible adjusted
Q:What is the concrete distributor?
Hydraulic cloth machine, manual cloth machine (also divided into 12 meters, 15 meters, 18 meters three kinds)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords