Manual Concrete Placing Boom For Delivery Concrete Pump Parts
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manual Concrete Placing Boom
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q:How to install and use the distributor?
- In the process of assembling and installing concrete distributing machines, the constructors must wear safety belts when they work at high altitude, and the seat belts must be hung where they can be stressed. Construction cable must be overhead or buried in the ground, not flat and put
- Q:What is the Hand operated concrete distributor?
- Concrete spreader is a new product developed in order to enlarge the pouring range of concrete and improve the level of pumping construction mechanization
- Q:What is the difference between concrete pump truck and concrete distributor in construction?
- Automobile pump flexible tubing can flexibly rotate 360 degrees, the body shift is also very convenient, the pumping efficiency is relatively high, but the cost is more expensive.
- Q:How to distinguish tower type distributor and general distributor?
- No frame structure. Its stability and service life are all behind the tower cloth machine
- Q:What are the benefits of concrete handling machines?
- The construction area of the crane pipe can not be reached, and the concrete distributor can be used instead
- Q:How to fit the cloth rod of the distributor?
- When the cloth rod is placed on the frame, the leg is compacted by a support pipe, and the device is not necessary when being arranged on the floor of the building
- Q:What's the design plan of the concrete spreader?
- Imported cloth machine (tire belt machine) is based on heavy duty truck chassis, or cross-country tire crane as chassis. The distribution machine patent uses the self-propelled crawler crane as the chassis, forming the structure of articulated upper material belt conveyor + crawler chassis + telescopic cloth belt conveyor, which is the first in China
- Q:How to maintain the concrete spreader?
- The lining of the silo is equipped with abrasion less material lining board to reduce material adhesion and reduce material arching
- Q:what's the difference between the fabric pump and boom pump?
- The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
- Q:What are the weekly inspection items for concrete spreader?
- Check connection bolts, shaft end plate, pin shaft, lock nut is loose
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Manual Concrete Placing Boom For Delivery Concrete Pump Parts
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords