High Performance TC4808 tower crane with Competitive Price
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our tower crane:
1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3, It is original in design, reliable in operation and satisfactory in shape.
4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.
5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products
Advantage of our tower crane:
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Main technical parameters of the tower crane:
1) loading capacity:
jib length(m) | 11 | 14 | 18 | 22 | 26 | 30 | 34 | 38 | 40 | 42 | 44 | 46 | 48 |
2t-20.97m | 2 | 2 | 2 | 1.897 | 1.576 | 1.34 | 1.159 | 1.017 | 0.973 | 0.93 | 0.886 | 0.843 | 0.8 |
4t-10.96m | 3.986 | 3.09 | 2.36 | 1.897 | 1.576 | 1.34 | 1.159 | 1.017 | 0.973 | 0.93 | 0.886 | 0.84 | 0.8 |
2) Mechanism specifications:
hoisting | ||
m/min 65.1 32.6 13.0 | 15/15/4 | |
T 0.8 2 2 | ||
trolleying | m/min 25.2 | 2.8/2.2 |
slewing | r/min 0.734 | 5.5 |
climbing | m/min 0.4 | 3 |
electric power | 26.3 | |
main supply | 380V/50HZ | |
Jib length(m) | 48 | |
Counterbalance(t) | 7.76 |
- Q:I started to make 1000 paper cranes to make a wish come true and before I start I have a few questions. How many times can you make 1000 cranes to make a wish come true? Do you have to string them? And how long do you have to make them?
- I think it's a one time deal. You don't have to string them. You have as long as it takes. Look up Sadako Sasaki. She was a 12 year old Japanese girl who tried to fold 1000 cranes while in the hospital in the 1950's. She had A bomb disease, also know as leukemia. She got it because of the bombing of Hiroshima as a baby. She died after only making 650 or so cranes. It's a very good true story though.
- Q:the lenght of beam is 4.5mmaterial of beam is ASTM Gr60
- difficult question
- Q:Has anyone ever folded 1000 paper cranes? If so did your wish come true? If it did come true what did you wish for? :) Thanks so much!
- I know of someone who did. They did it as a fundraiser for a village school. They folded the cranes while working on the project, though, so I guess the lesson there is that you can make your own luck. The cranes look beautiful, though!
- Q:Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
- Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
- Q:Climbing process of an internal climbing tower crane
- The tower is sleeved on the ladder climbing, lifting hydraulic cylinder is articulated in the body of the beam, and the lower end (piston rod end) the middle beam is hinged on the activities. The two sides of the tower are provided with legs, and the two sides of the movable beam are also provided with legs, and the two supporting legs are alternately supported on the ladder steps so as to cause the tower to rise.
- Q:What symbols are there in the story? What might be the symbolic meaning of the sea? the boat? the seabirds? the shark? the unmanned life-saving station? the lighthouse? the tourists on the beach?What is the theme of the story? What does the story as a whole say about human beings and nature? about male bonding? about survival? how are these three topics related in the story as a whole?
- Temporary. It is sort of classic that a group of people are thrown together by some terrible tragedy or circumstance, but unless there is something beyond that one day or hour, there is no common bond that will make it permanent. The Open Boat is a terrific story. I always liked it. It reminded me of the movie stagecoach or the movie The Open Boat which is a bit different. It's all about people being together and having to work to survive. They went down together, but how much else do they have in common? My guess is little.
- Q:I got the crane gold 1.6 roller rocker I'm trying to install on my 95 z28 w/ an lt1 and it doesn't seem like they are installing quite right. I got the tall black nuts that hold the rocker down around the stud and the pushrods, that's it. Do I need to use those things that go below the rockers themselves (the things that slide over the stud and the rocker goes over it from the original rockers) or do I just install how I already am with just the crane rockers, black nuts and pushrods?
- on the LT1 they come factory with screw in studs so the crane application should go without any problems the rocker the rocker guide from crane should slide right on to stud you don't use the old rocker guide for that
- Q:Thanks to anyone who helps ^^
- crane - tsuru flower - hana, kusabana, seika butterfly - cho, kocho cherry blossom - sakura sword - katana
- Q:how do you make one of them, put me through sep by step with photos.
- www.okorder /
- Q:for example: erection, technical data...
- A bridge crane is one that looks like a bridge (sorry I am tired). It sits on two railway tracks. One at either side of say a building. The tracks are at a fair height. The crane bridge spans between the tracks. Long travel is when the crane moves along the tracks. Cross travel is when the 'crab' moves sideways along the bridge. The crab has the hoist on it with a drum and cable type arrangenment. The lifting gear or hook is attached to the cable. They are very useful in factories for transporting large parts from one process to another. They transport pretty well anywhere in a well designed building in that Long Travel can be X cross travel can be Y and hoist up and down can be Z.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
High Performance TC4808 tower crane with Competitive Price
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords