• High Medium Voltage Drive 10KV 4600KW RMVC4000-A100/5800 VFD System 1
  • High Medium Voltage Drive 10KV 4600KW RMVC4000-A100/5800 VFD System 2
High Medium Voltage Drive 10KV 4600KW RMVC4000-A100/5800 VFD

High Medium Voltage Drive 10KV 4600KW RMVC4000-A100/5800 VFD

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Energy-saving Solutions for Enterprise
1
Program Overview
Saving energy achieves 10% -70%
The enterprises do not need to pay for expense of equipment manufacture and installation.
Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)
Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1
)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility
2
)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3
)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4
)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5
)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2
Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3
Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Q: Is the laptop power adapter high temperature normal? Is there anything else?
Hello, the power adapter because there are a lot of electronic components so hot is normal, the general hand feels hot does not feel hot on it, if hot, then there is a problem.
Q: A 4-pole AC motor into a 2-pole AC motor, the motor is controlled by the inverter, to make the maximum speed of the 2-pole motor and the original 4-pole
First reduce the frequency of about one-third of the test, not the case, then appropriate adjustments!
Q: Is the speed of the motor controlled?
Change the external conditions, you can change the motor speed: 1. Change the number of pole pairs of the motor. (Multi-pole motor use) 2. Use the frequency converter to change the frequency speed 3. Winding motor rotor series resistance speed control. 4. Slip motor is to change the slip electromagnetic speed
Q: What is the working principle of high voltage electrodes and frequency converters?
High voltage inverter from high - low - high; low - high; high - high points. The following are the same as the " High-low-high-mode high-voltage inverter is the high-voltage power transformer with a step-down, with low-voltage inverter control, and then step up the transformer voltage to the voltage we use, the supply of high-voltage motor.
Q: Motor nameplate on the standard 2P, I set the number of motor pole in the inverter, is set 2 or 4 pole?
Then the motor nameplate on the standard 2P, it must be 2-pole motor, synchronous speed = 60 seconds x frequency (mainland 50Hz) / pole pairs, you can also look at the rated motor speed, about 2940 rev / 60s, so the inverter Set the number of motor poles, is set 2 pole, I hope you can be satisfied.
Q: Laptop adapter heat
Therefore, in the design and production of switching power supply, we must choose high temperature components. Of course, be sure to control the temperature of the power supply within the allowable range of the application environment. First, the conversion efficiency should be designed as high as possible, and secondly, to use the pressure drop is small, low loss of switching components, the third is to be thermal design, cooling area to be as large as possible, more than 100W switching power supply Should have a metal perforated shell, or add a cooling fan. The current notebook power adapter power is generally around sixty or seventy W, the use of high temperature plastic fire sealed package, the internal heat generated by the plastic shell mainly distributed out. Therefore, the power adapter surface temperature is still quite high, the maximum temperature or even reach about 70 degrees! Think of the inside of the adapter, it is not like the fire! So, when you use the laptop, try to place the power adapter in a better place to ventilate heat, do not put books and the like on the power above. As for the kind of hot feeling, do not have to worry about is the power, not angry strange!
Q: ASUS power adapter Acer can use it
See whether the power adapter is suitable for notebook use, the following three conditions for reference: 1. The output voltage of the adapter is the same as that of the notebook.
Q: Inverter problem
(0 ~ 20mA), but the main input / output is completely isolated, than the output of the inverter simulation of the output of the analog output The amount of signal impact resistance, anti-interference ability.
Q: 90KW inverter start 90KW, 4-pole motor and 6-pole motor j What is the difference? The inverter can be used for it?
Three-phase AC induction motor, 4-pole speed is generally 1480 rpm, 6-pole speed was 980 rpm
Q: Why G120 inverter to be equipped with 4-pole motor?
On the upstairs that the motor parameters to be set on the possible, such as voltage, current, power, power factor, rated efficiency, rated frequency, rated speed, motor overload factor

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords