HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 019
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What conditions should a real estate agent have?
- If so, we all go when the real estate agent is good. You can often imagine their own excellent performance
- Q: What is the gross margin of the real estate industry?
- but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
- Q: What does real estate mean?
- Real estate can have three forms of existence: the land, buildings, real estate one. In the real estate auction, the auction of the subject can also have three forms of existence
- Q: How is China's housing market in other aspects of the trend ?
- China's other aspects of the real estate market in the future the following changes will occur:
- Q: What is the characteristics of real estate prices
- real estate prices, including the following six points,Real estate prices have obvious price characteristics
- Q: When China introduct the real estate?
- Then the market to further recovery and development, 97,98 years when they met the Asian financial crisis
- Q: What is the difference between land valuation and real estate valuation?
- based on the land market transaction data, according to the land's economic and natural attributes, according to the quality of real estate, grade and its real economic activities in the general income Situation
- Q: According to the use of housing classification?
- According to the use of housing functions can be divided into eight categories:
- Q: What is the real estate from the law?
- Real estate because of its own characteristics that the location of the fixed and immutable, in economics, also known as real estate.
- Q: What kind of factors in our housing market?
- they will release a huge purchasing power and demand, thereby stimulating the development of China's real estate
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 019
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches