• Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized System 1
  • Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized System 2
  • Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized System 3
  • Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized System 4
Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized

Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Heavy Duty Steel Prop Description 

Adjustable steel Prop is applied to vertically support system in the construction to support the timber beam and formwork,such as the floor construction.There are two typesLight Duty and Heavy Duty.

Normally,Raw Material is Q235 Steel with Hot Dip Galvanized

Steel Prop is mainly made up of bottom plate,outer tube, inner tube, swivel nut,cotter pin,upper plate and the accessories of folding tripod,head jack, the structure is simple and flexible.

 

2.Main Features of Heavy Duty Steel Prop

Steel Prop could be adjusted to required height according to the different height of the constructions.

1Convenient: Steel Prop is simple of the structure, so it is easy to assemble and disassemble.

2Economy: Steel Prop could be re-used, and once useless, the material could also be recovered.

3.Heavy Duty product pictures:

   Heavy Duty Adjustable Steel Prop with Hot Dip Galvanized

4.FAQ

 We have organized several common questions for our clientsmay help you sincerely

1How many Steel Prop your company have

Here comes our 5 types of Scaffolding systems:

-According to the Dutythere are Light Duty and Heavy Duty.

-According to surface treatmentthere are PaintingGalvanizedand Hot Dip Galvanized.

2How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q: i just got it like 3 days ago and its no signs of infection and im just worried it might get that way. ive been reading online about people who got infections and people who had all this crap happen. what do i need to do to stop one from coming i mean i use contact solution and cotton swabs wipe it down with wet ones and clean it when i sweat and turn it twice a day.. im always careful about keeping it clean im a neat clean freak but is there anything else i can do to stop infection from coming
go to safepiercing.org for proper aftercare and what to avoid. if you use store bought saline, make sure it is additive free, but, the sea salt soaks on the above site works much better. also, stop turning it. it disrupts the newly forming skin which prolongs healing and makes you more prone to infection. turning the earring is something that comes from the old way of ear piercing (with a gun). it does not apply to any other piercings, and, we know now that it's not good for any piercing. the 'gun piercers' aren't real piercers and don't know anything about it also, it takes up to a year to heal
Q: Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
i sharted. PS: please purchase my new toilet hawaii chair
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
I'd give it a decent amount of time before changing it. They take awhile to heal, often times for most between 6-12 months, but for most it's closer to the 12. So I'd give it a few months at least, but it wouldn't be a bad idea to ask your piercer about when would be the best time. Often times too they'll help you with changing jewelry jewelry insertion for little to no charge, so you may want to do that. I've had mine pierced for about 12 yrs, and actually, I still have the original bar in that it was pierced with, but I remember it was quite a while before I felt comfortable taking it all the way out to clean.
Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance
Q: I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q: Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
5.2.5, the calculation of the column, a clear calculation of the type of stud.6.2.4, clear the structure of fastener type column.Local documents, it is not possible to regulate, do not allow the use of fastener type scaffolding. But the top of the column, to use the provisions of backwater, specification.
Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q: Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
One is in any uneven slopes and ladder type foundation erection; two is the support ladder type template, template can realize the early dismantling; the three is to achieve early removal of part of the support frame, capable of setting up a passage, with four wing cornice; is the erection of climbing frame, a movable working table, efflux frame, to achieve the various functions of supporting role; five is used as storage shelves, can be used for the erection of a variety of stage, advertising support engineering. The pole is connected with a long press 600mm modulus of arbitrary function, also has a head butt function, provides the convenience for the use of special height. The utility model provides a technical support for the hanging, installing and fixing of the new type of formwork, and the utility model is used for the large-scale standardized template.
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords