• H3/36B tower crane standrads of NFE 52081 FRANCE and DIN 5018 GERMANY System 1
  • H3/36B tower crane standrads of NFE 52081 FRANCE and DIN 5018 GERMANY System 2
  • H3/36B tower crane standrads of NFE 52081 FRANCE and DIN 5018 GERMANY System 3
H3/36B tower crane standrads of NFE 52081 FRANCE and DIN 5018 GERMANY

H3/36B tower crane standrads of NFE 52081 FRANCE and DIN 5018 GERMANY

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower crane H3/36B


H3/36B tower crane is manufactured under the advanced technology introduced from POTAIN(France).The crane is up to the standrads of NFE 52081(FRANCE) and DIN 5018 (GERMANY).


For Tower Crane H3/36B:


Max.load capacity: 12t ,


Tip load capacity : 3.6,


Work Radius(m): 60Mast section dimension(m): 2 X 2 X 3 / 2.5 X 2.5 X 5.78


H3/36B tower crane standrads of NFE 52081 FRANCE and DIN 5018 GERMANY

Groundwork is poured on the ground without under frame, and tower crane is fixed directly on the groundwork. This method makes tower crane spare groundwork section and crossing girder, and separate working height of tower crane is 46.2m under such condition.
If construction object is high, tower crane can adopt attaching mode, and hoisting height can reach 161-200m. If it is required to be higher under special conditions, please contact our company.
No matter which kind of mode is adopted, hoisting arm has lengths of 55m, 60m and 65m, which can be chosen according to different objects.

 It adopts hydraulic hoisting system to increase or reduce standard sections, which makes height of tower crane rise or fall according to height of construction to adapt construction of different buildings.Working speed is high, timing performance is good, and working efficiency is high.

 

Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
Q:What is the maximum weight an industrial crane can lift?
Last okorder /
Q:what is the proper way to fold a paper crane?
I would go to a library or a book store and find a book on origami.
Q:I need to go to a tower crane school inside Las Vegas, where do i go? At least inside Nevada. Not Arizona or Utah or California.
Statistically, they rank below familiar. The Clark County college District (Las Vegas) is recruiting instructors from out of city, or perhaps in another us of a (ordinarily the Philippines) through fact there's a scarcity. not many human beings flow to Las Vegas to flow into the coaching occupation. it rather is in all threat a marvel to no person. in spite of the fact that, like maximum college districts for the time of that us of a, the solid colleges are frequently in wealthier neighborhoods, and the undesirable colleges are frequently interior the final rich neighborhoods. this is extraordinarily lots comparable to that's in the different city. some colleges are greater valuable than others. In l. a. there's a great distinction between Canoga Park extreme college and Crenshaw extreme college, even although they're interior an identical college district. lots an identical might nicely be reported for the Las Vegas college District. There are solid colleges, familiar colleges, and below familiar colleges. As i discussed, as an entire, the District stories regularly occurring instructor shortages. There are only not that many qualified instructors that flow to the city for that particular occupation. The CCSD is ranked low in custom benchmarks including attempt rankings, instructor to pupil ratio's, etc. Vegas isn't understand for it rather is high quality of education, like say ... Boston. in spite of the fact that, in case you progression to a ideal section including Summerlin or Henderson, your babies will greater or much less attend and familiar suburban extreme college with a common adventure in different cities. in case you progression to North Las Vegas, or the Nellis section, there will be greater gang problems and a loss of inspired instructors through fact of a complicated coaching environment. many mum and dad % their properties here in accordance with which college their babies will attend.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:I've only seen one book that has it.I can't buy it until I get more money.That's the only one from that book I really wanted though...Is there any site that has it?With a diagram.Thanks!
Now, If the guy was 75 yrs old, with beautifull gray hair and can ballroom dance, and asked If he could kiss me , I would say yes, The one thing I hate is when a guy opens his mouth over yours and thinks thats a kiss, I would have to tell him I don't need a bath. Or that I don't need to be swallowed up. If he's that hundgry he should go get something to eat at A fast food place. HA HA HA.
Q:I have a compare and contrast paper due on Tuesday comparing Cranes and The Sniper and I can't find Cranes to save my life. Somebody please help me!!!
If okorder In the search bar there, select the books category, then type the title of the story into the bar, and click go. You will be linked to the page where you can purchase the book very cheaply -- about $5.00. Also, there is a review of the story describing its plot. Additionally, you can type into the search bar of your computer: short story Sadako and the Thousand Paper Cranes; on the page you receive will be a link to Wikipedia where the plot is explained. If you are looking for a story simply titled Cranes, I was unable to discover that one. Sorry!
Q:I've been watching Passions for years and I don't understand what in the world is going on between Fancy and Pretty Crane... what did Pretty do to her??
A wild and rebellious teen, Fancy's 13th birthday party was canceled five minutes before its designated start time after she and her sister Pretty Crane stole the caterer's van and drove it halfway to neighboring Castleton. She was also pulled over by future police chief Sam Bennett at least once for driving over the speed limit and without a license (Fancy was, at the time, not of the legal age to obtain a driver's license).[1] Growing up, Fancy apparently had a sometimes competitive relationship with her sister, Pretty. According to their aunt Sheridan, Pretty brought a cute boy from their country club on the family's yacht one Labor Day, and jealous Fancy pretended to sprain her ankle so that the boy spent much of the day tending to his date's injured sister. The two apparently began dating, but Fancy broke up with him a week after once she was sure she had stolen him from Pretty. (However, Fancy denied that the event had occurred as so.) Sometime before 1999, Fancy departed Harmony for a prestigious school, either boarding or a university. She did eventually make it to college, but, according to Ivy, she has yet to complete her degree. Fancy later made her way to Italy with her sister sometime in 2004 or 2005, but the two ended up parting ways, her sister staying in Italy and Fancy heading for Las Vegas. Lately, hints have been given that Fancy betrayed Pretty, causing Pretty to leave Harmony for good.
Q:Where i live i get a damn lot of these come in my house.... I usually just leave them unless there are too many. This was before i was told that they are in fact one of the most venomous creatures on the planet. I laughed, but then was told the same by a friend.Im now Little worried about them coming near me. I understand they have no ability to sting but still... Should i worry about them flying around my house? I was thinking if i were to squash one, doesn't that mean the venom is now on my hand?!Are they really the most venomous creatures on earth? Or am i making a mountain out of a molehill? Thanks
This Site Might Help You. RE: Daddy longlegs/Crane Fly... Most venomous creature on earth? Where i live i get a damn lot of these come in my house.... I usually just leave them unless there are too many. This was before i was told that they are in fact one of the most venomous creatures on the planet. I laughed, but then was told the same by a friend. Im now Little worried about...
Q:Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
According to the present list of quotations, the winning project, the tower crane cost has been included in the total price, and has nothing to do with the construction side, that is, the cost of tower crane foundation should be borne by the construction side.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords