• H20 Timber Beam for Concrete Formwork Construction Formwork Girder System 1
  • H20 Timber Beam for Concrete Formwork Construction Formwork Girder System 2
  • H20 Timber Beam for Concrete Formwork Construction Formwork Girder System 3
  • H20 Timber Beam for Concrete Formwork Construction Formwork Girder System 4
H20 Timber Beam for Concrete Formwork Construction Formwork Girder

H20 Timber Beam for Concrete Formwork Construction Formwork Girder

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Detailed Product Description



1.glued laminated timber beam

2.Max. Allowable shear force: 40KN, Max. Design value: 11KN;

3.Max. Allowable bending moment: 10KN·M, Max. Design value: 5KN·M.



Formwork Girder H20 Timber Beam for Concrete Formwork Construction


Description:

1. Structure sketch

Formwork Girder H20 Timber Beam for Concrete Formwork Construction


2. Related parameters

① Max. Allowable shear force: 40KN, Max. Design value: 11KN;

  Max. Allowable bending moment: 10KN·M, Max. Design value: 5KN·M.

② Max. Production length: 6600mm;

  Production capacity: 3000m/day;

  Weight: about 4.8kg/m;

  Moisture Content: about 13% ;

  Using time: about 4-5 years.


Competitive Advantage:

1. Standardized production line guarantees good products.

Formwork Girder H20 Timber Beam for Concrete Formwork Construction


2. Finger jointing of the flange and web,the strength of timber beam is highly improved.

Formwork Girder H20 Timber Beam for Concrete Formwork Construction

 


3. Well treated to prevent from water penetration or erosion, so the service life
maximally extended.

Normally, CMAX timber beam H20 can be used for 4 to 5 years, the exact using time is influenced by construction environment and the way to storage.

4. The length will be flexible, we can afford any length to meet customs’ demand within 6.6m limit.



Applications:

As a kind of girder, it is an important constituent part for formwork and it is widely used in concrete formwork construction.

Formwork Girder H20 Timber Beam for Concrete Formwork Construction


Q:What is an integrated climbing frame? What are the works? What are the advantages
The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Q:The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
Q:The whole concrete wall climbing frame or good use of steel scaffolding
Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
Q:Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords