H Frame Steel Scaffolds Types Movable CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Application: For house bulding
Certification: SGS
2.Packaging & Delivery
Packaging Details:
Delivery Detail:
Steel tube is packed in bundles with steel strips; coupling is packed in carbons. |
20 days after the deposit |
Durable steel scaffolding systems tube&coupling
3.Feature Details
1. Scaffolding systems tube&coupling is one of the most labor intensive scaffolding systems,but the return on time investment is nearly umlimited adaptability and access to even the most unique jobsite.
2.The normal size of scaffold tube is 5.8 meter long,diameter 48mm. It is compatible with scaffolding couplers 48.6*48.6mm or 48.3*48.3mm.
3. Scaffold tube can be joint at any angles you want with three simple components:fixed coupler,swivel coupler and sleeve coupler.
4.The steel scaffold tube are mainly used to cover the outside wall of building,adaptable to any construction situation.However,they are also suitable to support inside concrete walls.
5.The thickness of scaffold tube can be 3.2mm,3mm and 2.75mm,the surface can be black,painted or cold galvanized.
4.
Main Frame | |||||
Code | Thickness(mm) | Height(mm) | Width(mm) | Surface Treatment | |
HF1930 | 2.0/2.2 | 1930 | 1219 | HDG/Painted | |
HF1700 | 1700 | 1219 | |||
HF 1524 | 1524 | 1219 | |||
HF1709 | 1700 | 914 | |||
LF1700 | 1700 | 1219 | |||
LF1219 | 1219 | 1219 | |||
LF914 | 914 | 1219 | |||
LF1524 | 1524 | 1524 | |||
LF1930 | 1930 | 1524 |
5.What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
- Q: Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
- Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
- Q: There is a 5.0 kg pail of paint to one side, as shown. How close to the end can he approach safely? Express your answer using two significant figures. If there is more than one answer, separate them by commas.
- I am looking for as shown, as I am not psychic.
- Q: Construction technology measures fee is directly into the sub - project costs
- Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
- Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
- ... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
- Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
- the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding load shall not exceed 270kg & nbsp; # 47; m
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
- Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- (Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
- Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
- The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
Send your message to us
H Frame Steel Scaffolds Types Movable CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches