German Type Drop Forged Scaffolding Pipe Fittings Fixed Coupler
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
German Type Drop Forged Scaffolding Pipe Fittings Fixed Coupler
1. Product Detail:
Size | 48.3*48.3mm |
Weight | 1.35kg/pc |
T-Bolt | M14-86mm |
Nut | 22mm |
Surface | Electro-galvanized/HDG |
2. Company Introduction
We are a professional manufacturer of scaffolding couplers and scaffolding accessores, there are 4 forging lines in our workshop and we have our own mould machines and technicians , could meet different requests from clients. OEM also available. All our products are made according to international standard EN74-1:2005/BS1139 and AS1576.2-2009 and we own the test machine in our factory to control the quality.
Welcome to our factory anytime you want.
Factory View:
Product Details:
A. BS Type Double Coupler and Swivel Coupler
B. German Type Double Coupler and Swivel Coupler
C. US Type Double Coupler and Swivel Coupler
D. Italian Type Double Coupler and Swivel Coupler
E. Putlog Coupler/Single Coupler
F. Board Retaining Coupler
G. Fixed Beam Clamp
H. Swivel Girder Coupler
I. Sleeve Coupler
J. Bone Joint
K. Jack Nut
L. Forged Wing Nut and so on.......
Pictures of German Type Double Coupler/Scaffolding Pipe Fittings
Remarks:
1. Packing: Woven bags+steel pallet or other shipping standard
2. Leading time: Reguarly 25-30 days after receving advanced payment or according to your qty.
3. Payment Term: 30% advanced payment by T/T, 70% balance against copy of BL .
Packing Picture:
For more informaiton, please keep in touch with Bella.
Hope to work with you together in the near future.
Thanks .
- Q:Standard for inspection of portal scaffolding
- The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
- Q:along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
- Read the book and find out! I think she's up on the scaffold sometime in spring, but as I said, READ it and make sure.
- Q:i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
- the industrial take over a year to FULLY heal. and it will be for a while.
- Q:21M high full scaffold erection scheme
- 2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
- Q:Mobile scaffolding accessories prices
- The price of each region is different, are you renting or buying?
- Q:Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
- (less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
- Q:What are the full house scaffolding specification
- 7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)
- Q:I plan on playing tennis and doing track and field at school... Im getting the piercing this month and it won't be healed in time to take it out. How can I conceal it or possibly even help it heal faster??
- Well an industrial piercing isn't exactly going to get in your way, just put your hair up in a pony tail so your hair doesn't get snagged on it. I wouldn't suggest trying to cover it with anything though, you'll be putting the piercing at risk of infection from trapping bacteria, especially if you're going to end up sweating.
- Q:Key points for safety of portal scaffolding
- 2, take off the scaffolding workers must wear a helmet, wearing a seat belt, wear non slip shoes.3, the construction load should meet the design requirements, shall not overload; shall not be stacked on the scaffolding template, steel and other objects. Prohibited in the scaffolding on the pull cable wind rope or fixed, erection of concrete pump, pump and lifting equipment etc..
- Q:Please help me in building professional people (scaffolding)
- Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
German Type Drop Forged Scaffolding Pipe Fittings Fixed Coupler
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 pc
- Supply Capability:
- 100000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords