Garage Roof Green Waterproof & Drainage Board
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Composite waterproof and drainage plate
Products overview:
Shandong yongrun composite waterproof and drainage of the floor board with high impact and the resistance, high pressure polystyrene (HIPS), HDPE resistant to high pressure for a long time, made no deformation. This long resistance not only can withstand bone-chilling concrete slabs and weight load, and can withstand bone-chilling during construction inevitable foreign pressure and impact, such as vehicles, workers and concrete pouring down momentum, etc. Long-term deformation, so keep floor can maintain the original displacement. On the floor of the filter layer is to ensure that the use of geotextiles drainage channels won't because foreign substance and block, such as particle or concrete backfill soil.
Product features:
Composite waterproof and drainage board set in an organic whole, waterproof and drainage success in solving the waterproof and drainage relations, no matter in drainage function, the economic interests are better than the traditional stone taoli drainage and other filter layer superior and reliable. Composite put drainage plate is the anti, drainage, and the combination of increase durability of engineering new products, its performance of 120 years of age. Building structure of waterproof and drainage is an important link is the durability, this to the building waterproof and drainage of the problem set new and higher requirements applying modern flexible waterproofing material building waterproof system, and in theory can completely impervious, but waterproof system often destroyed, in the environment will still produce leakage, composite waterproof and drainage plate to the part of the water discharge, the engineering for guidance and drainage, prevention in row, cut, plugging, and the combination of modern building waterproof and drainage system to the new requirements.
Application:
In the roof garden, outdoor garage roof greening, retaining wall, the basement, metro, underground foundation engineering, slope protection and a highway roadbed of waterproof and drainage, wide application.
- Q: Eastern rainbow waterproof how to do
- especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
- Q: What decoration materials, light and water, and the wall, the perfect combination of glass
- Third, the mouth of the mouth, put pressure glue gun Cut the hose tube, fitted with a pointed nozzle, and then according to the size of the gap will be cut by 45 degrees angle. Install the glue gun.
- Q: Cabinet is to buy finished products, or directly to the decoration company to do?
- My home decoration cabinets are Haotian decorative package to do, although expensive, but still very worthwhile, all of their wood will be waterproof and moisture, in contact with the wall will do the underground waterproof and moisture, and are on-site cash Now do, timber materials can be seen directly, the amount of glue is not much, less formaldehyde, the latter part of the living is also more comfortable!
- Q: Nanning building waterproof material market where
- to buy what materials are going to go to some factories, such as paper, printing materials and other manufacturers in the Nanning High-tech Zone or Nanning Economic Development Zone may be more
- Q: Js waterproof coating without powder can brushing
- 5. Coating maintenance: JS cement-based waterproof emulsion coating construction after 24 hours after the end with a damp cloth to cover the coating or spray water to maintain the coating, usually 2-3 days; air humidity, poor ventilation of the local dry The time period may be longer, and vice versa; 6. Check the construction of JS waterproof coating (closed water test): bathroom, pool and other parts in the JS cement-based waterproof emulsion waterproof layer after dry (at least 24 hours in summer, at least 48 hours in winter) stored water for 48 hours to see the water Construction is not qualified. Light wall must do the water test. JS waterproof coating See the amount of: under normal circumstances, the amount of about 0.6-1kg / ㎡, the actual amount from the use, the use of parts, rough surface roughness, environmental factors such as the decision.
- Q: Roof for the insulation, Master roof, using two waterproof construction program
- Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
- Q: What are the key points and contents of the quality control of waterproof material?
- 2, ordinary two-component polyurethane: A material is similar to the appearance of edible oil translucent yellowish curing agent from polyether and isocyanic acid by polycondensation of polyurethane prepolymer (about 20,000 yuan / t), B material For the plasticizer, coagulant, fillers and other components of the black liquid (about 3900 yuan / t), after mixing the polyurethane coating is also black. But also because of A, B material of the huge spread so often the following two kinds of fraud: ① with a very cheap black oil (priced at only about 1,200 yuan / t), diluted with xylene after thin coating twice. Cold oil is not easy to dry after the coating, after each coating must be drying a few days, in the winter with roasted, and then do not sprinkle dry powder cement, so a long time paint are dry. ② is often used to expand the proportion of A, B components such as 1: 4-6 (usually 1: 2), but also in the polyurethane mixing process by adding cement powder as a filler, if the stirring is not added xylene diluted Agents and other methods of fraud.
- Q: I would like to ask how to do in the warm water above,
- I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
- Q: Finished house bathroom waterproof household acceptance should be how to accept?
- 4: coating waterproof layer coating evenly, the thickness of the product to meet the technical requirements, the general thickness of not less than 1.5mm not exposed at the end.
- Q: What is the difference between finished mortar and cement mortar?
- Finished mortar for dry areas, because the addition of lime, lime water retention is good; cement mortar for wet areas, because the high strength.
Send your message to us
Garage Roof Green Waterproof & Drainage Board
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 1000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords