Frame Scaffolding System Painted type Hight Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 10000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Frame Scaffolding System Painted type Hight Quality
1.Structure of H Frame ScaffoldingDescription
As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. Further, these pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.
Packaging & Delivery
Packaging Detail: | Frame system scaffolding package in the container, or according to your requested |
Delivery Detail: | after deposit 10-15 days |
2. Main Features of Frame Scaffolding
1) Frame system scaffolding is light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.
2)A complete set of frame system scaffolding usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.
3) Frame system scaffolding is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .
4) Frame system scaffolding can be used for the building decoration which is the light duty scaffolding, it is more easier for moving.
5) Frame system scaffolding are dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness
3.Frame Scaffolding product pictures:
4.Frame Scaffolding Product Description
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
1)How about your company?
CNBM International Corporation, China National Building Materials (Group) Corporation, is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world; We has over 10 year experience in scaffolding industry.
2)Can we provide different size of Frame system Scaffolding as customer need
The answer is Yes, customer can provide the Tec spec to us and Drawing for production.
3)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q: i have my nose pierced and am thinking about getting a scaffold cartilage piercing, but am affraid because your cartilage is so tough! and i know it depends on the person when it comes to pain, but just compairing it to a nose piercing? (when i got my nose pierced i cried, but once they finished piercing it, i wasn't in anymore pain)
- ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X
- Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
- Q: Specification for construction steel pipe scaffolding and construction safety rules?
- Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
- Q: What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
- Q: How to maintain the scaffold after use
- Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
- Q: I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
- Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
- Q: What are the main safety problems when dismantling the scaffold
- 3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
- Q: Can you do the outer scaffolding?
- 6 15cm. When the oblique rod in a span of two step distance, it is appropriate in the intersection of the large cross bar to add a small bar, the oblique abdominal rod fixed on its protruding end. 7, scissors (1) of the scaffold bridging with columns, longitudinal and transverse horizontal rod synchronous erection, with long scissors along the elevated continuous layout
- Q: 21M high full scaffold erection scheme
- 2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
- Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
- 5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis
Send your message to us
Frame Scaffolding System Painted type Hight Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 10000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords