Formwork System Scaffolding System Formwork Steel low price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 300 m.t
- Supply Capability:
- 1000 m.t/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Formwork System Scaffolding System Formwork Steel low price
Product pictures:
Product description:
Name: | RingLock Scaffold System |
Category: | Scaffolding System |
Material: | Steel (Q235/Q345) |
Size: | D48*3.25mm, etc |
Surface: | Electro Galvanized, Hot Dipped Galvanized, Painted, Powder Coated |
Component: | Standard, Ledger, Diagonal Brace, Bracket, Base Jack, U Head Jack, Etc. |
Application: | Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc. |
Manufacturer: | OEM is Available |
Items or goods can be manufactured according to your standards. |
Advantage
* Good loading capacity
* Easy to assemble and dismantle
* Excellent quality for formwork & scaffolding with wide choices
Other scaffolding & formwork products:
(1) Scaffolding System:
Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Haki Scaffolding System and accessories;
(2) Scaffolding Frame & Accessories:
We can produce all kinds of forged and pressed couplers, including British type couplers, German type couplers, Italian type couplers, BRC coplers and so on. We also can produce according to your drawings or samples.
(3) Formwork System Scaffolding & Accessories:
Light Duty Shoring prop and Heavy Duty Shoring Prop;RASTO clamp and so on.
FAQ
Why Us?
We are one of the largest construction materials suppliers in China.
We own professional manufacturers with powerful producing capacity.
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q: What is the exterior scaffolding erection specification? What do you need to pay attention to?
- Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
- Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
- This depends on your choice of products to decide, because now scaffolding collapse accident frequently, we recommend that you must use the national standard fasteners
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
- Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
- Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
- Q: The obvious would be helpful too!
- Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
- Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
- First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
- Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
- Prefabricated concrete pipe piles are structural parts Raw materials refers to the main components of steel, cement, sand, stone and so on
- Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- 2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
Send your message to us
Formwork System Scaffolding System Formwork Steel low price
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 300 m.t
- Supply Capability:
- 1000 m.t/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords