• Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China System 1
  • Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China System 2
  • Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China System 3
Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China

Flexmaster Flexible Duct - Aluminium Flexible Duct in Low Price from China

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Pictures of aluminium Flexible Duct

Aluminium Flexible Duct in Low Price from China

Aluminium Flexible Duct in Low Price from China

Product Description of aluminium Flexible Duct:

Features and Specification:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature

-Fire Retardant

-Corrosion Resistant

-High flexibility

-Convenient installation

-Non- toxic


Introduction of aluminium Flexible Duct

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building. 

FAQ of aluminium Flexible Duct:

1.             What teperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.              Lead time: 10 days

 

 

 

 

Q: What is the effect of concrete pouring on the construction quality?
, why should set the flexible pipe, because all the materials are hot and cold shrink, you layout the pipeline When the temperature and your future use when there is a difference in the temperature and the thermal stress when processing, if not Ji plant perfection Dao Ghost voucher set the flexible pipeline, the pipeline will have a lot of internal stress, long-term alternating role will Resulting in pipeline damage, set a lot of places, such as straight pipe, to a certain length must be set, the inflection point also need to set, these settings you can be in the mechanical design manual pipe chapter check out
Q: Will the embedded stove why use stainless steel corrugated hose connection?
62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
Q: How to optimize the construction management to improve the quality of construction projects
I suggest you look at Google, there will be a lot, I hope you can find a satisfactory, I wish you a happy life!
Q: What is the difference between a rigid sleeve and a flexible sleeve?
Apparent density of 23kg / m3 or more, the greater the density the more expensive.
Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q: The first generation of the tube is that year out?
In general, there is also a strong ability to resist, it is likely that there may be cracking
Q: How is the flexible tube of FRP composite pipe defined
I am not an expert and have occasionally slept on the foam board. Personal feeling sleep in the above airtight, but also hot, easy to get angry.
Q: Is the flexible sleeve of the broken wall used as a second retest?
There is a staircase in the middle of the tower crane, from the stairs began to climb
Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches