• Aluminum Flexible Duct For Heat Ventilation System 1
  • Aluminum Flexible Duct For Heat Ventilation System 2
  • Aluminum Flexible Duct For Heat Ventilation System 3
  • Aluminum Flexible Duct For Heat Ventilation System 4
  • Aluminum Flexible Duct For Heat Ventilation System 5
Aluminum Flexible Duct For Heat Ventilation

Aluminum Flexible Duct For Heat Ventilation

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
20000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications
non-insulated aluminum flexible duct

extension rate:1:10

Low /medium pressure central HVAC system flame and heat resistant

Aluminum ventilation hose aluminum foil air duct expandable aluminium ducting

 

Material:

Double layers of aluminum foil reinforced with high tensile spring steel wire

Structure: High elastic wire, aluminum foil. A reinforcement model can be required.

Aluminum foil thickness: 0.035mm

Temperature range: -30°C~+140°C

Maxim Air Flow: 30m/s

Maxim working pressure: 2500 pa

Standard Length: 10m/pc  Or as your requirement

Fire resistance: Non flammable.

Normal packing: In carton. Or as your requirment

Application: Low /medium pressure central HVAC system and ventilation system.

Application: Used in gigh pressure,low pressure air conditioner and ventilation system,easy installation, anti-temperature and inflaming retarding etc

Description

100% Non-asbestos 

Raw Materials

Cement,Quartz Sand,Paper Pulp,etc.

Standard Size

1220mm×2440mm or 1200mm×2400mm

Max Width

1220mm

Max Length

3000mm

Thickness

4-20mm

Density

1.30-1.50g/cm3

Color

Light yellow or Grey

 

Product Description:
Specifications of Glass wool board

Width: 600, 1000,1200mm

Length: 600,1200,2300mm

Thickness: 25-100mm

Aluminum Flexible Duct For Heat Ventilation

Q:Will the embedded stove why use stainless steel corrugated hose connection?
62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
Q:Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications
Q:Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
Usually in accordance with cubic meters or kilograms to calculate the price
Q:Does the desulfurization and denitrification equipment use metal hoses?
Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
Q:Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Q:Two hundred galvanized pipe should be under the large flexible tube
We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Q:What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
Tower crane is used to lift objects up and down the lifting of the object is not clear the length of the arm of the tower crane!
Q:CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q:Flexible pipe trench backfill inspection batch quality acceptance record how to fill
Step distance is the bar distance, vertical distance is vertical bar distance. Span ... guess or pole distance.
Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords