High Temp Flexible Duct - Aluminium Flexible Ductings in Competitive Price from China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Pictures of aluminium Flexible Duct
Product Description of aluminium Flexible Duct:
Features and Specification:
-Applied in Heating, Ventilation and Air Conditioning
-Non-insulated and insulated Flexible Duct offered
-Up to 150℃ and 250℃ high temperature
-Fire Retardant
-Corrosion Resistant
-High flexibility
-Convenient installation
-Non- toxic
Introduction of aluminium Flexible Duct
Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.
FAQ of aluminium Flexible Duct:
1. What teperature maximum? Our products: 150℃ and 250℃
2. What MOQ? Our MOQ: 500 pcs
3. What payment terms? We accept T/T and L/C
4. Lead time: 10 days
- Q: We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Construction workers classification and breakdown of ordinary types of work
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
- Q: The sound of water pipes will not produce infrasound damage to the human body?
- The first look at the factory declaration materials in the building level. The second depends on the material you use sandwich panels. (Generally Caigang sandwich rock wool no problem, glass wool depends on the design requirements of the building).
- Q: How to strengthen the construction management and construction quality control
- You can Google Oriental Rainbow's official website, there are rainbow days cat flagship store and other links will have the price and product display, you can also contact Rainbow customer service, it is recommended that you choose the East Rainbow waterproof products and standardized construction team, the East Rain rainbow is the best quality waterproof listed companies RPUF-371 sprayed rigid polyurethane waterproof insulation integrated system "rain rainbow" spray foam polyurethane waterproof insulation integrated system is made of foam polyurethane foam waterproof insulation integrated material and protective surface layer constitute
- Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
- In the past, the external wall insulation technology prevails, the external wall insulation is in the experimental stage, Basically no
- Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
- Construction safety inspection standards (JGJ59-2011) a total of 19 inspection items, they are 1. Safety Management 2. Civilized construction. Fastener steel scaffold 4. Door steel scaffold 5. Bowl button steel pipe scaffolding 6. Socket type plate fastener type steel scaffolding 7. Full house scaffolding 8. Suspended scaffolding 9. Attachment lift scaffolding 10. High operating basket 11. Foundation Pit Engineering. Template holder 13. High work 14. Construction electricity 15. Ingredients Red Chrysanthemum Chrysanthemum Chrysanthemum. Construction lift 17. Tower crane 18. Lifting hoisting. Construction tools hope to help you.
- Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
- First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
- Q: What is the difference between the D-LD2000 clamp-type flexible fittings and the KRJ-type clamp-type flexible fittings?
- Models according to the requirements of various manufacturers to prepare, the general rules of the metal hose coding is the enterprise name code + hose diameter + hose diameter + single button or double buckle code, such as AL0406D said the metal tube production of single-button type 4mm outer diameter 6mm metal hose Metal hoses are characterized by: metal hose between the pitch flexible; metal hose has a good scalability, non-blocking and stiff; metal hose light weight, caliber consistency is good; Metal hose softness, repeat bending, good flexibility; metal hose corrosion resistance, high temperature resistance is good; metal hose anti-rat bite, wear and tear, to prevent the internal wire wear; Metal hose flexible bending, tensile properties, anti-lateral pressure strong; metal hose soft and smooth, easy to threading installation positioning; metal hose Product Application: for a variety of equipment signal lines, transmission wire and cable, fiber Cable protection armored cable, precision optical ruler, optical measuring instruments, medical equipment, machinery and equipment with the wire protection tube; for public telephones, remote meter, Menci alarm and other needs of the wire security equipment ; a variety of small wire protection tube; a variety of computers, robots and so on the network line protection tube
- Q: Plastic tube most afraid of what the East unitary
- The bonding strength of the gypsum board and the extruded polystyrene plate is ≥010MPa, and the interface is in the extruded polystyrene board The bond strength of the bonded gypsum and the composite plate is ≥010MPa The combustibility of the composite plate reaches B1 level Construction technology points: the installation of the board between the natural close (including the long board) does not leave; for long board, should be installed before the hardening of the bonding material can be carried out; per square meter composite board with at least 2 Expansion of the anchor, each commonly used specifications of the composite board at least 6 expansion anchors evenly anchored to the grass-roots wall; external walls and internal wall connection should be extended to the wall, the width should not be less than 300mm; And wall bonding area ≥ 30% Applicable conditions and scope: hot summer and hot summer and warm winter area outside the building insulation works
- Q: To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
- The radial force of the seal is far greater than the axial force of the connecting bolts but all the axial force washers 窢 field urging 讵 peculiar aldehyde support, good self-sealing effect by the pipeline through the media rubber ring pressing force pressure more sealing performance of the more pressure to prevent the pressure of the rubber ring to the inner diameter of the tube end of the interface diameter Preload to prevent the media pressure leakage and the blue compared to the higher the pressure of the pipe the more the advantages of the more dangerous the pipe junction at the flexible state of the clamp and the tube between the gap between the clamp clamp a small number of adjacent pipe to allow the corner tube Pipe pipe between the end of the gap to allow the axial shift of the pipeline to adapt to the expansion and contraction of the pipe; pipe interlocking effect reduced 70% mechanical vibration
Send your message to us
High Temp Flexible Duct - Aluminium Flexible Ductings in Competitive Price from China
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 50000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches