• Aluminium Flexible Ductings in Competitive Price from China System 1
  • Aluminium Flexible Ductings in Competitive Price from China System 2
  • Aluminium Flexible Ductings in Competitive Price from China System 3
  • Aluminium Flexible Ductings in Competitive Price from China System 4
  • Aluminium Flexible Ductings in Competitive Price from China System 5
Aluminium Flexible Ductings in Competitive Price from China

Aluminium Flexible Ductings in Competitive Price from China

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Pictures of aluminium Flexible Duct

Aluminium Flexible Ductings in Competitive Price from China

Aluminium Flexible Ductings in Competitive Price from China

Product Description of aluminium Flexible Duct:

Features and Specification:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature

-Fire Retardant

-Corrosion Resistant

-High flexibility

-Convenient installation

-Non- toxic


Introduction of aluminium Flexible Duct

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building. 

FAQ of aluminium Flexible Duct:

1.             What teperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.              Lead time: 10 days

 

 

 

 

Q:Drain flexible pipe to keep the base design above the elevation of the number of meters
, there are cloth-based materials, such as Teflon cloth, etc
Q:The first generation of the tube is that year out?
In general, there is also a strong ability to resist, it is likely that there may be cracking
Q:Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
Can be made of polystyrene particles by the pre-die into the steam completely foam self-adhesive after the formation of foam block through the line to form a polystyrene board
Q:Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
Usually in accordance with cubic meters or kilograms to calculate the price
Q:What are the scope of construction work special operators?
Cost plus cost plus artificial plus profit on the line! Regional differences are great!
Q:What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
Tower crane is used to lift objects up and down the lifting of the object is not clear the length of the arm of the tower crane!
Q:On the classification of car repair, the best details Thank you Such as sheet metal workers, car circuits, etc. Thank you
There are also special materials such as bamboo, so rare, no longer introduced
Q:Talk about the class flexible management of the class teacher what the requirements
Hello metal hose made of stainless steel models are mainly single-button type P3 and double button P
Q:Is the flexible sleeve of the broken wall used as a second retest?
There is a staircase in the middle of the tower crane, from the stairs began to climb
Q:Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches