• HVAC Ventilation Ducting Flexible Air Hose Pipe System 1
  • HVAC Ventilation Ducting Flexible Air Hose Pipe System 2
  • HVAC Ventilation Ducting Flexible Air Hose Pipe System 3
  • HVAC Ventilation Ducting Flexible Air Hose Pipe System 4
  • HVAC Ventilation Ducting Flexible Air Hose Pipe System 5
  • HVAC Ventilation Ducting Flexible Air Hose Pipe System 6
HVAC Ventilation Ducting Flexible Air Hose Pipe

HVAC Ventilation Ducting Flexible Air Hose Pipe

Ref Price:
$1.00 - 20.00 / m get latest price
Loading Port:
Shekou
Payment Terms:
TT or LC
Min Order Qty:
100 m
Supply Capability:
100000000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

HVAC Ventilation Ducting Flexible Air Hose Pipe

1.Structure of HVAC Ventilation Ducting Flexible Air Hose Pipe

Flexible air ducts are typically made of flexible plastic over a metal wire coil to shape a tube. And they have a variety of configurations. Flexible ducts are very convenient for attaching air outlets to the rigid ductwork. It is commonly attached with long zip ties or metal band claps. Besides, flexible ducts can tolerate moderate negative pressures.

2.Main Features of HVAC Ventilation Ducting Flexible Air Hose Pipe

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

3. HVAC Ventilation Ducting Flexible Air Hose Pipe Images

 

HVAC Ventilation Ducting Flexible Air Hose Pipe

4. HVAC Ventilation Ducting Flexible Air Hose Pipe Specification

Insulated Flexible Duct

Structure: 1 layer of Aluminum Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Aluminum Foil

Glass Wool Density: 16kg/m3; Thickness: 25mm

Insulated Acoustic Flexible Duct

Structure: 1 layer of Aluminum Foil +1 layer PET film+ insulated glass wool

Outer jacket: 1 layer of Aluminum Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm

Specification

Type 1

Material

Aluminum foil

Structure

Inner pipe is made of aluminum foil and inside spiral structure is hold by high tensile steel wire.

Application

Suitable for medium-low air speed

Technical Parameter

Size

4”-16”

Standard Length

10m

Maximum Air Speed

20m/s

Maximum Heat Resistance

-20℃-150℃

Maximum Pressure

250mmWG

 

Type 2

Material

Aluminum foil

25mm thickness ,16kg/m3 glass wool.

Structure

Inner pipe is made of aluminum foil and inside spiral structure is hold by high tensile steel wire.

Insulating layer is covered by 25mm thickness ,16kg/m3 glass wool.

Outside layer: Reinforced aluminum foil;

Inside layer: Glass fiber mesh

Application

Suitable for medium-low air speed and low temperature difference.

 

Technical Parameter

Size

4”-5”, 6”-12”, 14”-16” 

Standard Length

7m, 10m

Maximum Air Speed

20m/s

Maximum Heat Resistance

-20℃-150℃

Maximum Pressure

250mmWG

 

Type 3

Material

·Aluminum foil

· 25mm thickness ,24kg/m3 glass wool.

Structure

· Inner pipe is made of aluminum foil and inside spiral structure is hold by high tensile steel wire.

· Insulating layer is covered by 25mm thickness ,24kg/m3 glass wool.

· Outside layer: Reinforced aluminum foil;

Inside layer: Glass fiber mesh

Application

Suitable for medium-low air speed and large temperature difference.

 Technical Parameter

Size

6”-12”

Standard Length

7m

Maximum Air Speed

20m/s

Maximum Heat Resistance

-20℃-150℃

Maximum Pressure

250mmWG

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

1.How long for the delivery time?

Delivery time: 10-30 days, it depends on the ordered quantity.

2.What’s the usage

Practicality: suitable for the densely-populated area(such as school, supermarket, office, stadium, theater, factory.),high requirement of the environment area, such as hospital, laboratory, howff, bus, train, broadcasting studio. main usage: 1) Cold, hot water supply facilities for public buildings 2) Food, chemical, electronic industrial pipeline networks such as pipeline networks for transporting all kinds of corrosive liquid 3) Drinking water production system pipeline networks such as pure water and mineral water 4) Air conditioning facility pipeline 5) Compressed gas pipeline networks for industry 6) Pipeline network for swimming pool 7) Pipeline network for solar energy facility 8) Agriculture and garden production Additional information

How you control the quality?

During the production of fiberglass insulation, material is sampled at a number of locations in the process to maintain quality.

 

 

Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
External wall insulation should pay attention to what the details?
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q: What is the whole heat exchange fresh air ventilator?
Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q: HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords