• Aluminum Flexible Air Duct With Black Color PVC System 1
  • Aluminum Flexible Air Duct With Black Color PVC System 2
  • Aluminum Flexible Air Duct With Black Color PVC System 3
  • Aluminum Flexible Air Duct With Black Color PVC System 4
Aluminum Flexible Air Duct With Black Color PVC

Aluminum Flexible Air Duct With Black Color PVC

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Aluminum Flexible Air Duct With Black Color PVC

Introduction

This type of duct is made of reinforced aluminum foil coating.The inner part is filled with highly tensile spiral steel wires to support the duct.It is generally applied on low to medium air velocity with temperature variation system.This product has passed GB8624B1 fire resistant test.

Specification Description

Thickness of aluminum foil

0.0065mm

Thickness of PET

0.012mm/0.015mm

Density of cotton

16kg/m3;20kg/m3;32kg/m3

Thickness of cotton

25mm

Diameter of steel wire

0.8mm/1.2mm

Glue

hot melt adhesive /polyurethane

Caliber

4"~20"

Package

Box/bag

Length

6m/10m

Technical Target    

Operating temperature range

-30oC~140oC

Max air velocity

30m/s

Max operating pressure

2500pa

Meltingpoint of hot melt adhesive

130oC

Parametric Table

Number of plies

Max operating temperature

Materials

Single ply

120oC

single-ply aluminum foil and single-ply PET  film compound

Double plies

140oC

single-ply PET to place in double-ply  aluminum foil

Four plies

220oC

Doulble plies of single-ply aluminum foil

Six plies

250oC

Double plies of double-ply aluminum foil

We are pleased to supply products according tothe requirement of our clients!

Production Flow

   




Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.
Q: Air to water heater host and air conditioning host is not the same
You can try asphalt! Is the kind of paving the way! Very useful!
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q: Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q: Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords