• Famous Brand Cup lock Scaffolding from China System 1
Famous Brand Cup lock Scaffolding from China

Famous Brand Cup lock Scaffolding from China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Famous Brand Cup lock Scaffolding from China

1. Quick Details:

Place of Origin:Hebei China

Model Number: W104

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

2.Packaging & Delivery:

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

3.Product Information


Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

4.Pictures:

Famous Brand Cup lock Scaffolding from China

Famous Brand Cup lock Scaffolding from China

Famous Brand Cup lock Scaffolding from China 

5.Advantages:

1.GREAT REPUTATION CUP LOCK SCAFFOLDING

2.Three Year Warranty

3.Operating Friendly

4.Full Safety Devices

5.Provide OEM service

6.Reasonable price


6.FAQ

How to guarantee the quality of the products

We have established the international advanced quality management systemevery link from raw material to final product we have strict quality testWe resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.


Q: Can any one tell me about different types of scaffolding? Especially about tubular and frame scaffolding. If you can tell me about the components using in scaffolding also, that would be appreciate. Please give me some useful links too. Thanks in advance.Regards,Just A Guy
Sorry I don't have links.But I have had the tube type for over 20yrs.The components are :cross bar decks or planks leveling pads scaffold ends(thats what we called them) You should be able to call your local rentall place and find out where you can purchase some or you might be able to purchase theirs at a good price.One more piece you may want to consider depending on how high you go is called a wall tie.always make sure your scaffold is level both ways!it makes a difference when you start to stack or tie together in a string.goodluck
Q: Bowl buckle scaffold from the machine to pull out the upper and lower bowl
It seems that there is no specific load value in the code, but there are some requirements on the calculation method and some structural loads
Q: do u think i should, is it safe, will it hurt, how bad will it hurt, and what might happen.
It is safe so long as you go to a professional. Keep in mind that many professional piercers will not pierce you until you are 14, even with parental consent. It will hurt, because it is done with a needle, and in order to get an industrial, you will have to get two holes pierced. The only things that could happen if you don't clean it properly is you could get an infection. Aside from that, if you go to someone who doesn't know what they are doing, or who pierces you with a piercing gun instead of a needle, you *could* end up with nerve damage. Research reputable shops before you get pierced!
Q: I've had my industrial piercing for almost 5 years now and I was wondering if I was to take it out if it would close up or how long it would take to close. And after I take it out will it be noticeable that it was there.
If you had it for 5 years it won't close up since its healed up. The holes on mine are pretty small but I have hair covering mine so you can't see it but I've only had mine a little over a month. I do have other piercing that haven't ha anything in for a while and they are not closed like my belly button and I got that done about 7 years now.
Q: i had an industrial piercing 2 days ago and was just wondering roughly how long untill i can change the bar? ive seen a few i like and want to change the boring one asap,..also, do u think my ears look crowded??? i dont have any pictures but on my left ear i have earlobe, tragus and rook, and my right ear i have ear lobe, anti-tragus and industrial..just wondering what u think.. thankss x
U shouldn't exchange it. i've got had undesirable journey with that. If the bar that it replaced into pierced with dosent worsen ur tongue then use the comparable bar and purely exchange the ball. Ur working a hazard changing the bar bc u do not kno if the hot bar will infect or irratate ur tongue. If u do pick to alter it wait apprx 6wks except ur putting yet another a million in as quickly as u take the 1st a million out. U can exchange the ball suitable after u get it pierced bc the ball dosent remember as long as u save the bar in.
Q: Hi people, just wondering if the main Angkor Wat temple is still under restoration/renovation with all that green tarpaulin and scaffolding on it?I'm wondering when that will be off as it might obstruct the amazing views.Is there any restoration schedules?thanks!!
Basically Angkor Wat is always under construction. The green tarpaulin is still there on the left side, it does ruin the photo opportunity a little bit.
Q: What is the difference between the bowl buckle scaffold and the fastener type steel pipe scaffold? What is the difference
The difference between the role of the first, the first is the use of indoor or roof construction scaffolding, commonly known as the full house scaffolding, mainly to play a supporting role
Q: Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Go on, with 3 m long rod, the top layer with 1.8 m and 3 m two. The length of leveling under 30 m high scaffold verticality deviation should be controlled within 1/200, 30 m high above the scaffold should be controlled at 1/400~1/600, the total height of the vertical deviation should be less than 100 mm.The domestic vertical bar bowl buckle spacing of 600mm, the number of foreign pitch bar button spacing is some of the 500mm, the foreign specifications of the crossbar as well as 1m, 2m, 2.5m
Q: Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
its normal aii your probaly slept on it just do a sea salt soak and you'll be fine but if your super worried go back to your piercer
Q: It's not fixed to the building and it looks as though a heavy gust of wind would send it crashing down. How exactly does scaffolding stay up and not topple over?
Well, it is attached to the building - not very strongly, but enough to keep it directly over the feet. The feet are adjusted to keep the part above them vertical so forces are straight down - easily achieved with a plumb bob on a string parallel to the pipes. Many scaffolding installations extend around a corner and with the diagonal bracing built in that provides stiffness. And scaffolding for working on a building is protected by the building, which blocks the air flow and slows it down from in the open air. Scaffolding towers, such as lighting at a concert or other special event (golf tournament) are guyed with wires/cables going out at an angle to anchors in the ground - these are often nearly invisible at any distance.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches