Factory supply professional scaffolding ringlock system
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 500 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Factory supply professional scaffolding ringlock system
Product info:
Ring lock system is a typical formwork scaffolding system, consist of support part and operaion forwork. Since born of German LAYHER company in 80’s designs, it has been improved many times by scaffolders. Now it has been the most widely used and most trusted scaffolding products in construction field.
Feature
Ring lock system has lots of advantages basing its simple deisgn and structions.The more essential it is, the easier it is.
1.Fast. The connect parts are using plug pin to fit in, one hammer can complex all parts erection, erect fast and dave time, simple struction make erection is easy copy and trainned, after project finish or build another level forwork, also save time and manpower.
make bearing capacity can pass on. Strongen system capacity and stability. In the same capacity,ring lock use less material than other systems. Simple struction, easy errect, also easy trained ,save many manpower and time and costs.
2.Ring plates are in horizen lines,make bearing capacity can pass on. Strongen system capacity and stability, reduce the formwork fail rate.In the same capacity,ring lock use less material than other systems. Save project costing.
3.Solder points are fixed and high-precision, so this will make enterprices must run a set of standard included income material till finish products, use trained workers and automation machine to keep products in a good quality.Use standard service to lead standard products.
Welcome inquiry us for more detials.
Product specification:
Part description | Thicknesss | Thickness | Lenger | Steel Grade | Surface |
Standard | φ48.3/φ60 | 3-3.25mm | 500-2500mm | Q345 | Hot dipped galvanized |
Ledger/Horizontal | φ48.3 | 3mm | 600/900/1200/1500/1800/2100 | Q235 | Hot dipped galvanized |
Level diagonal | φ48.3 | 3mm | \ | Q235 | Hot dipped galvanized |
Brace/diagonal | φ48.3/φ42 | 2.5mm | \ | Q235 | Hot dipped galvanized |
Production applications:
Our this ringlock system is produce by us Gainford, got good control from income material to end products. Whole product system has big load capacity and multi function benifits, suitable for many usages, such as bridge construction,boat building,outlook frame for building,railway construction,oil and gas projects and so on.
With it fast erection and good convinient, it could be use for stage, show platform, outdoor AD landmarks and so on.
Welcome send inquiry to us for more info, we glad to support you !
- Q: Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q: What is the bamboo board for the scaffolding of the building?
- Wooden foot Shouban, bamboo scaffold (including bamboo string board, bamboo fence board) Involving the scaffolding of the main norms are "construction fastener steel scaffold safety technical specifications" JGJ130- "construction scaffolding safety technical specifications" JGJ164-2008 and so on.
- Q: the reading on the left scale is 400n what should the reading on the right scale be?
- Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
- Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
- Hello, "farmers from the building, the most important is the quality and safety
- Q: What is the most important safety hazard at the construction site?
- 2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
- Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
- ... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
- Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
- the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q: I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- Of course, you can make your own soil to do a radius of 4 meters small cloth machine
- Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Send your message to us
Factory supply professional scaffolding ringlock system
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 500 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches