Excavating machinery Excavators XE215CLL
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | Unit | XE215CLL | |
---|---|---|---|
Operating weight | kg | 22350 | |
Standard bucket capacity | m³ | 0.5 | |
Engine | Engine Model | / | ISUZU BB-6BG1TRP |
Direct injection | / | √ | |
Four strokes | / | √ | |
Water cooling | / | √ | |
Turbo charged | / | √ | |
Air to air intercooler | / | × | |
No. of cylinders | / | 6 | |
Rated power/speed | kw/rpm | 106.5/1950 | |
Max. torque/speed | N.m | 551/1600 | |
Displacement | L | 6.494 | |
The main performance | Travel speed | km/h | 5.5/2.8 |
Swing speed | r/min | 12.2 | |
Max. gradeability | / | ≤35 | |
Ground pressure | kPa | 36.2 | |
Max.Bucket digging force | kN | 78.7 | |
Max.arm crowd force | kN | 40 | |
Max.traction force | kN | 179 | |
Hydraulic system | Main pump | / | 2 Plunger pump |
Rate flow of main pump | L/min | 2×206 | |
Max pressure of prime relief valve | MPa | 32.3/34.3 | |
Max pressure of travel system | MPa | 34.3 | |
Max pressure of swing system | MPa | 28 | |
Max pressure of pilot system | MPa | 3.9 | |
Oil capacity | Fuel tank capacity | L | 360 |
Hydraulic tank capacity | L | 220 | |
Engine lubrication | L | 25 | |
Overall dimensions | A Overall length | mm | 12050 |
B Overall width | mm | 3190 | |
C Overall height | mm | 3150 | |
D Overall width of upperstructure | mm | 2710 | |
E Track length | mm | 4255 | |
F Overall width of undercarriage | mm | 3190 | |
G Crawer width | ㎜ | 800 | |
H Track length on ground | mm | 3462 | |
I Crawer gauge | mm | 2390 | |
J Clearance under counter weight | mm | 1060 | |
K Ground clearance | mm | 470 | |
L Min.tail swing radius | mm | 2750 | |
Working range | A Max. digging height | mm | 13250 |
B Max. dumping height | mm | 10942 | |
C Max. digging depth | mm | 11690 | |
D 8inch horizonal digging depth | mm | --- | |
E Max. vertical wall digging depth | mm | 11200 | |
F Max. digging reach | mm | 15394 | |
G Min. swing radius | mm | 4835 | |
Angle of arm deflection | Degree |
- Q:Survey: What piece of heavy machinery should I operate after the meds kick in?
- A table saw, or a chainsaw
- Q:What methods and measures should be adopted for the maintenance of construction machinery?
- Once this happens, can supplement the epoxy resin or use soap daub, emergency plugging. If there is a hole, you can use the cork to entertain and, if necessary, tie it with wire or rope. If the pipe joints loose and oil spills, you can use random belt of raw tape at the thread wrapped 3-5 laps, it can be tightened.
- Q:Is there more machinery of gov't than is necessary, too many parasites living on the labor of the industrious?
- There are too many people to be USED by any machinery. Since we are not USEFUL- we do not need to be fed.
- Q:In marvel comics why does machinery explode when (shadow cat) phases through it?
- Shadowcat's ability to phase through matter comes from the fact that her phasing power works by letting her atoms pass through the spaces between the atoms of another object. Because her atoms and the object's atoms never touch, she achieves the ability to quantum tunnel herself through that object. However, even though her atoms never touch, they do disrupt the electron field of other atoms. For machines, this causes the electron flow to destabilize, which in turn causes the machine to malfunction or explode.
- Q:I have never dealt internationally before and am a little leery about doing so. The seller looks legitimate but how can I be sure? Is there a way to check if there were problems with their machines, quality issues, etc?
- Contact their nearest Embassy they will have a Trade Commissioner you can discuss it with. Contact your own Government somewhere you will have a Trade Department. Both these can do checks on your behalf for free. QUALITY 1: Ask for some references where they have sold their Machines etc, then check up on them. QUALITY 2: If you are dealing with Asia most don't know what quality is and will openly lie to you, especially China. Did you know over 50% of Chinese Toy manufacturers this year went out of business because of Quality problems? Believe me it is a problem in most of their manufacturing industries.
- Q:How else might they have expressed their grievances? would other kinds of active have been more successfull?
- It is in the very core of their belief system. Any other way of expressing their grievances would not be a true expression of their faith.
- Q:When a crematorium, for instance, which is not an industrial building but requires heavy machinery, is constructed, are the environmental systems, like HVAC and mercury abatement systems, or the actual furnaces themselves brought to site in pieces and assembled at first fix stage or put in place before the roof or slab above goes on? Or are they just serviceable by a separate large entrance?
- Large entrance is best. Long ago setting equipment then constructing the walls was a common practice. When the original machines need to be replaced it is a problem.
- Q:A heavy piece of machinery is raised by sliding it a distance d = 12.5 m along a plank oriented at angle θ = 20.0° to the horizontal, as shown below.(a) How high above its original position is it raised? m(b) How far is it moved horizontally? m
- The trigonometry of a right-angled triangle .. (a) Height = 12.50.sin20 .. .. .. ?h = 4.28 m (b) Horiz.distance (triangle base) = 12.50 s20 .. .. ?11.75 m
- Q:What type of lithium base grease is used in construction machinery?
- General No. 3 in the summer with the winter 2, grease, grease
- Q:elaborate please. and if you have any sites that would help me please list them..thanks
- Perhaps the quantities of farmers in developed countries. Advanced machinery requires far less labor than do primitive methods. My great grandfather harvested corn by hand with a corn knife and bushel baskets. A modern corn picker probably outperforms his efforts ten thousand-fold.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Excavating machinery Excavators XE215CLL
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords