the best Excavators XE260CLL Excavating machinery
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | Unit | XE260CLL | |
---|---|---|---|
Operating weight | kg | 27500 | |
Standard bucket capacity | m³ | 0.4 | |
Engine | Engine Model | / | ISUZU CC-6BG1TRP |
Direct injection | / | √ | |
Four strokes | / | √ | |
Water cooling | / | √ | |
Turbo charged | / | √ | |
Air to air intercooler | / | √ | |
No. of cylinders | / | 6 | |
Rated power/speed | kw/rpm | 128.5/2100 | |
Max. torque/speed | N.m | 637/1800 | |
Displacement | L | 6.494 | |
The main performance | Travel speed | km/h | 5.5/3.3 |
Swing speed | r/min | 12.1 | |
Max. gradeability | / | ≥30 | |
Ground pressure | kPa | 40.8 | |
Max.Bucket digging force | kN | 70.7 | |
Max.arm crowd force | kN | 41.3 | |
Max.traction force | kN | 193 | |
Hydraulic system | Main pump | / | 2个柱塞泵 |
Rate flow of main pump | L/min | 2×231 | |
Max pressure of prime relief valve | MPa | 32.3/34.4 | |
Max pressure of travel system | MPa | 34.3 | |
Max pressure of swing system | MPa | 23 | |
Max pressure of pilot system | MPa | 3.9 | |
Oil capacity | Fuel tank capacity | L | 400 |
Hydraulic tank capacity | L | 240 | |
Engine lubrication | L | 25 | |
Overall dimensions | A Overall length | mm | 13900 |
B Overall width | mm | 3390 | |
C Overall height | mm | 3360 | |
D Overall width of upperstructure | mm | 2830 | |
E Track length | mm | 4640 | |
F Overall width of undercarriage | mm | 3390 | |
G Crawer width | ㎜ | 800 | |
H Track length on ground | mm | 3842 | |
I Crawer gauge | mm | 2590 | |
J Clearance under counter weight | mm | 1050 | |
K Ground clearance | mm | 495 | |
L Min.tail swing radius | mm | 2985 | |
Working range | A Max. digging height | mm | 13800 |
B Max. dumping height | mm | 11414 | |
C Max. digging depth | mm | 14915 | |
D 8inch horizonal digging depth | mm | × | |
E Max. vertical wall digging depth | mm | 13917 | |
F Max. digging reach | mm | 18258 | |
G Min. swing radius | mm | 6740 | |
Angle of arm deflection | Degree |
- Q: I'm currently working for a construction company Monday-Saturday. We occasionally use heavy machinery, like bulldozers and industrial forklifts, but don't have anyone who can fully operate then so we have to hire ab operator, costing the company more money. I was wondering what schools or any courses I can take either after work or on Sundays to get certified in southern California. If you guys have any places or advice to give it would be appreciated. :)
- I've okorder /
- Q: i need woood working machinery for my industry.i am looking for good indian supplier for iported machines.
- I put machine suppliers into the Google search box and was immediately brought to a wealth of supplier-based information. Further refine your search by adding woodworking, Indian, etc. This will be an easy one to solve! Len
- Q: I am doing an energy audit for a plastic manufacturing company for my final year university project.The company runs on 3 phase and has a large variety of different machinery (blow molders, injection molders, compressors, refrigerators etc) I am required to measure each component and determine how much is contributed to the monthly electricity bill. What is the best way to do this? Is there any pieces of equipment I can use (such as something similar to the kill-a-watt) which can attach to the machine and measure kW usage?The machines run on demand so therefore taking an average from the specifications would be too inaccurate.NEED SOME HELP PLEASE :(
- If it runs on demand, whatever you put down will be correct. Let them prove you wrong! Or you could guestimate how long they are used each day and take the nameplate power rating off the machine, then do the math.
- Q: What machinery is used to make sugar? From digging the ground to harvesting.......
- Sugar is obtained from a corn-like cane that grows in tropical places, It is planted from small cut portions of the cane into the soil already prepared and fertilized, when the canes get as high as 6 feet, and the leaves start to get yellow, is harvested, in many places its burnt to get ready of the leaves with sharp cutting edges and some dangerous snakes that usually nest in the plantations. The cane itself as is full with sweet liquid doesn't burn and is collected and carried to the mill. The first part of the extraction is to pass the canes through a press of rollers that press the syrup out, keeping the dry cane to be used for fuel to use in the boilers. The syrup is boiled and the water is removed leaving a very dense paste that is then dried with hot air to get raw sugar in large crumbs, this crums are milled to get what is known as brown sugar in cystaline form. The brown sugar doesn't have any chemicals and is almost 100% from dried syrup. From the brown sugar, is processed white sugar by means of adding some chemicals to whiten and remove the sugar cane flavor that comes with the original syrup. The final product is what we buy at the store. The boilers designed for sugar mills are unique for they are able to work with the dry cane as with oil, reducing considerably the cost of operation. There are some by-products very important that make sugar mills a great industry, the process of drying produce also a burned taste sediment called molasses high in calories that is also comercialized as stock food.
- Q: What are the total cost of the project?
- Direct costs include direct project costs (labor costs, material costs, construction machinery costs) and measures fee (environmental protection fees, civilized construction costs, safe construction fees, temporary facility fee, night construction fee, two handling fee, large machinery and equipment import and field installation, concrete reinforced concrete template and support fee scaffolding fee, finished project and equipment protection fees, construction fees) precipitation drainage.
- Q: I'm pretty disturbed about this whole deal. So she doesn't have certain female components.. does that make her a man? Is that why she ran so much faster than everyone else in Berlin? Are men really that much faster than women? Do you think she knew?
- But it's not the fact that she can't have children that makes her a question mark for her events. It's the fact that she has the chemistry of a man competing against women. It's not about one being more worthy over the other. It's the fact that testosterone makes you more able to build muscle and run quicker. It's a competetive advantage. However you look at it, I feel sorry for her having it drug into the public setting like it has been.
- Q: Our company is doing business of exporting used construction machinery from China.Various used construction machines can be supplied.The details are as below:Products: Used Wheel Loaders, Used Bulldozers, Used Cranes, Used Excavators, Used Forklifts, Used Rollers, Used Motor graders, Used Concrete Mixer, and Spare Parts.
- www.okorder
- Q: Which God should we pray in the sucess of machineries business?
- There's only one God, so pray to Him about all your needs. You don't need to go far.
- Q: My neighbors just woke me up with extremely loud chainsaws!! Is there some rule about this??
- I would say 9 am is an acceptable time. Anything earlier is rude. I would go over and talk with them and ask them to wait till 9 if it's bothering you.
- Q: I would like an example workout routine thank you! :)
- Here's a basic workout routine. 5 sets of 20 pushups 5 sets of 10 triangle pushups. 1 minute plank 3 times. 5 sets of 20 crunches 5 sets of 20 leg lifts 5 sets of 20 V-crunches 5 sets of 20 bicycle crunches. 5 sets of 15 jumping squats. Take a 30 second break in between each set and a 1 minute in between each exercise. If you're unfamiliar with any of these exercises just google them. If this seems a bit too intense for you, you can modify it as you please and then work up to the suggested workout. It's better if you do this every other day since it is quite intense. Remember to do 10 minutes of stretching before and after the workout. Do cardio the next day. I got results with this in the first 2 weeks, and got amazing results within 2 months. Just remember to have a healthy diet and stick to the workout routine too. Luck.
Send your message to us
the best Excavators XE260CLL Excavating machinery
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 10 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords