• Double masts aerial working platform System 1
Double masts aerial working platform

Double masts aerial working platform

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Double light model mast aerial work platform

There were six highly choice:

There were GTWY-9 II, 10 II, 11 II, 12 II, 13 II, 14 II, the highest working for 16 meters high.

Using high quality aluminum alloy material system, design, and a strong security,

Wide platform can load in two people and tools work, the more effective and safe.

advantages

-the highest degree of work for 16 m

-lightweight design, small can through the general channel, elevator, etc.

-platform area: 183 x70cm

-the AD/DC power supply

-hydraulic parts imported the international first-class original set of hydraulic pump station for power supply

-particularly strong mast system, increase the stability

-with a sudden stop switch to prevent wrong operation

-in the situation of power is another manual valve has dropped

accessories

-alarm device

-customized platform

-AC or DC power supply

-AC or DC hybrid power supply

Technical parameters:

CODE

GTWY9-

GTWY10-

GTWY11-

GTWY12-

GTWY13-

GTWY14-

GTWY14--G

Work height m

11

12

13

14

15

16

16

Platform height m

9

10

11

12

13

14

14

Carrying capacity kg

200

200

200

200

200

200

200

Storage length m

1.48

1.48

1.48

1.48

1.60

1.75

1.60

Storage width m

0.78

0.78

0.78

0.78

0.78

0.78

0.78

Storage height m

1.99

1.99

1.99

1.99

1.99

1.99

2.20

Work platform sizem

Platform length m

1.38

1.38

1.38

1.38

1.50

1.65

1.50

Platform width m

0.69

0.69

0.69

0.69

0.69

0.69

0.69

Guardrail height m

1.1

1.1

1.1

1.1

1.1

1.1

1.1

Supporting leg size AxB

2.20x1.80

2.20x1.80

2.35x2.02

2.35x2.02

2.45x2.17

2.70x2.36

2.57x2.36

Distance between platform and wall m

0.41x0.56

0.41x0.56

0.49x0.67

0.49x0.67

0.47x0.74

0.53x0.83

0.54x0.83

VoltagevACXDC

220v/12v

220v/12v

220v/12v

220v/12v

220v/12v

220v/12v

220v/12v

Electricity machine pressure kw

1.5

1.5

1.5

1.5

2.2

2.2

2.2

Raise/drop speed m/s

0.18/0.30

0.18/0.30

0.18/0.30

0.18/0.30

0.18/0.30

0.18/0.30

0.18/0.30

Machine-weight kg

620

655

700

700

768

820

812




Q: What about the heat treatment of the lifting platform?
The silk rods are generally used for the processing of the adjustment, and the semi-finishing process is a stabilizing stress treatment.
Q: What is the reason for the automatic lowering of the hydraulic platform
The non-leakage of pressure oil is the key factor for the non-drop, so check the one-way valve
Q: Tomb raider 9 research base elevator to go to go to go to go to the order to pry the gear not to go down to go down to go down the card 3 to break up
Press the switch and then descend the elevator down to the second floor and then climb to the right hand side of the cargo and pull down the first gear. Walk to the elevator and climb down the stairs to open the door between the second and third floors. Go up to the third floor and turn the elevator to the third floor. And then you go back to the second floor and you go to the third floor and you go to the sandwich and you get the second gear. Go up to the fourth floor and press the elevator up, go back to the third floor and switch to the three or four floors and twist the third gear. Come down to the entrance of the third floor elevator and then go in and use a shotgun to smash the three floors and the four floors. On the fourth floor elevator again back to the fourth floor, between the back to the fourth floor on the elevator by just open the channel on the wall opposite the detour to the fourth floor mezzanine dropped last gear lever.
Q: How does the platform maintain
Remove and disassemble the valve, and remove the valve core and remove it from the new installation. Put all the hydraulic oil in the tank into the tank, remove the oil absorbent filter, and put it back in the tank. The oil tank refilled with new oil.
Q: What is the hydraulic platform driven
Choose an electric motor or internal combustion engine based on load and situation
Q: How is the small electric shearing fork lift designed
The mobile platform is a special equipment for high-altitude operation. The mechanical structure of it, make the lifting platform lifting has high stability, wide operating platform and high bearing capacity, larger, and the area of aerial work for many people work at the same time. It makes high-altitude work more efficient and safer. It is mainly used in the installation of machinery, equipment and maintenance of the station, pier, bridge, hall and workshop.
Q: What is the size of the hydraulic elevator platform for 2T
If use the size of the demand is larger, can use fixed double span hydraulic lift, double straddle steady lifting, large carrying capacity, easy operation, widely used in vehicle maintenance, kilns, chemical plant, equipment and other industries use.
Q: Which is good for mobile goods elevators?
The design load of all mechanical and transmission equipment of the hoist is more than five times the actual load. It is a safe choice for you to go to jinan
Q: What hydraulic cylinder is used
As long as the hydraulic cylinder reaches the required height.I hope my answer will help you.
Q: The hydraulic cylinder with hydraulic platform is changed to whether the cylinder is feasible
As long as your cylinder size is large enough, theoretically! But in practice, it's not feasible to think about space and so forth.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords