Mast aerial work platform
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Mast aerial work platform
GTWY series of mast aerial work platform comprisee six differenttypes, with a lift of platform form
6.4 meters to 14.5 meters. They are a new generation of products with nover drsign and made of
new profife alumiumalloy. Due to the high strength of the profile alloy, the deviation and oscillation
if the lifting platform has been reduced to a minimum. The work plarform hs a slim and graceful
appearance, and is able bring its utmost lift into play in a very small sapce. This makes poossible
an easy, high effiant an safe aeriat work done in such places as hotels, airports, railway stations,
gymnasiums, woekshops and warehouses.
- Q: Is the truck crane and truck crane mean?
- The use of these two cranes is not the same. Lorry crane is installed on the car chassis, this vehicle is mainly used to transport the goods,
- Q: How is the length of the main hoist's main winch and sub-winch wire rope calculated?
- When the lifting angle of the boom is maximum, the wire rope override (generally not the full magnification of the main hook) is specified according to the specifications of the crane, and the length of the main rope is the length of the main rope.
- Q: What is the development trend of truck cranes abroad?
- Less modular form, combined into different specifications of the crane to meet the needs of the market and enhance the competitiveness.
- Q: What operating permits are required for truck cranes?
- 5, the car cranes need to carry out 36t heavy items of the lifting operations, the driver should also go to apply for secondary operating permit
- Q: What is the material process for a truck crane?
- Due to the application of the new technology in the steel industry, the quality of the steel can be improved. When the strength of the main girder of the crane is designed, a high allowable stress can be used without the need of a high safety factor in order to reduce the weight of the crane material
- Q: What is the speed limit of a motor vehicle crane?
- In all the valve, only the manual valve in the commutation at the same time, by controlling the size of the valve opening can also limit the speed and throttling speed.
- Q: What is the principle of the arm boom of the boom-type truck crane?
- Synchronous expansion and contraction using a single cylinder plus wire rope, pulley components to achieve expansion and contraction
- Q: What is the reason for the jitter of the crane boom
- Exclusion method: the balance valve disintegration cleaning, dredge damping holes.
- Q: What is the difference between a crane and a crane?
- The function of the crane and the crane is the same, the crane is included in the crane, but the crane has a greater category.
- Q: What are the daily maintenance of the truck crane?
- Purchasing the Ministry of Commerce Organize the process, the equipment management department and the equipment manufacturer or agent to sign the "purchase order" (key and important equipment before the purchase order should be approved by the general manager), the purchase order should specify the specifications of the equipment to be purchased, the basic
Send your message to us
Mast aerial work platform
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords