Single Mast aerial working platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Single mast aerial working platform
strengthen aluminum alloy design;make sure it is handle fluenty;mast will not deform,construction is nicety
and compact,machine body design is legerity.All the hydraulic pressure pumping station and motor are all
imported original from occident,insure the quality is excellent!
inner back-up electrical source and manual valve design,
insure drop the control platform in the plat roof or ground if the electricity is broken when
you are doing hight-altitude work.There is movable wheels in the machine shelf base,
can supply better turn off function,and easy to span common ground bars.
Single mast machine is loaded cargo handling assistant device.
Can load and unload by two people.lifting chain load safefy factor more than 10:1,
also have steel wire safety protect system,make sure lift and drop fluently and safe.
Supporting leg occupy area is very small,The biggest distance between platform and wall is 0.34m af-ter fix,
it is very convenient to work.
This product is made of aluminum a-lloy,light-duty,single people series aerial work platform,
electro hydraulic transmission,safety and credibility,the highest work altitude can reach 13.8m,
the biggest load can reach 150KG.
We use universal safe inserting leg,can interlock with brainpower electrically controlled,
can product worker forcedly.Lifting machine'svolume is small,weight is light,very flexible to move and easy
to go through room door and elevator door.Quality and capability and so on have exceeded many safety standard,
such asJC5099-1998,JG/T5103-1998,CE and so on.Products specification will continue to improve,here's photos
just for reference,can check latest design for detailed items.
Code
GTWY-6
GTWY-8
GTWY-9
GTWY-10
GTWY-11
GTWY-12
GTWY-12G
Work height(m)
7.8
9.8
10.8
11.8
12.8
13.8
13.8
Platform height(m)
6
8
9
10
11
12
12
Carrying capacity(kg)
150
150
136
136
120
120
120
Storage length(m)
1.3
1.34
1.34
1.4
1.46
1.52
1.43
Storage width(m)
0.76
0.76
0.76
0.76
0.76
0.76
0.76
Storage height(m)
1.99
1.99
1.99
1.99
1.99
1.99
2.78
Work platform size(m)
Platform length(m)
0.68
0.68
0.68
0.68
0.68
0.68
0.68
Platform width(m)
0.64
0.64
0.64
0.64
0.64
0.64
0.64
Guardrail height(m)
1.1
1.1
1.1
1.1
1.1
1.1
1.1
Supporting leg size(m)
1.55x1.35
1.68x1.48
1.75x1.55
2.10x1.83
2.23x1.9
2.45x2.06
2.26x2.06
The platform away from the wall spacing
0.20
0.15
0.22
0.32
0.36
0.43
0.43
Volatage(v)ACxDC
220/12
220/12
220/12
220/12
220/12
220/12
220/12
Electricity machine pressure(kw)
0.75
0.75
0.75
0.75
0.75
0.75
0.75
Raise/drop speed(m/s)
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
0.18/0.30
Machine-weight(kg)
320/355
370/405
375/410
410/415
435/470
460/495
460/495
Inclined collection size
- Q:Do you have a personal elevator with hydraulic platform
- Hydraulic platform itself is not flat layer device, the upper and lower limit is oil cylinder and the mechanical structure limits. Platform only "motor" "stop" "up" "down" button. The safety of the sheared platform can also be shaken when it starts and stops, without the thought preparation. In different floor installed several travel switch, electric cabinet, become automatic stop, hardware does not need how many money, the line a little trouble. Can do it. Just installed is not good
- Q:What kinds of tables are there? Which is better for the office?
- In the office, see if you're new or in the office. New outfit can consider electric elevator table, common card position can buy lift platform. It is recommended that they have a variety of elevating products, including elevating tables and elevating tables.
- Q:How much is the 8 square meter tatami mat
- Look at the material you choose. Eight is not too small. It is estimated to be around 5,000-1w, without a lift
- Q:You need to make a small lift platform, on top of the robot, non-industry. What you want is to add a light pole with a nut and a bolt, and you can use an electric motor to turn the bolts and the nuts.
- It should be ok, but it's a little bit of a problem, which is that you have to be able to use an electric motor and you have to have a lot of power or you can use a decelerator,
- Q:Does the fixed hydraulic platform need to submit to the specification requirement
- Lift platform, mobile elevators, cargo-lifts equipment, such as the regulations of the state, load is larger than 500 kg of belong to special equipment, is the need in the local quality supervision of special equipment inspection. First, look at the equipment capacity is over 500 kg, then you should go to the local quality inspection of special equipment department to put on record, first need information: including manufacturer's business license, tax registration certificate, organization code certificate, production license of special equipment, special equipment installation and maintenance license, there are different from region to region, it's best to make a phone call to prepare the material.
- Q:Is the elevator moving faster or slower?
- The speed is relative, but the best speed is not over half m/s.I hope my answer will help you.
- Q:What happened to the rise and fall
- Replace when necessary. Indicator, press the up button, motor rotation and lifting platform does not rise inspection or greater power contact, inverted power supply after the motor, it can be power supply is correct.
- Q:Safety operation of hydraulic platform
- Purpose: this procedure is used to guide operators to operate correctly and use hydraulic platform equipment. Two procedures: 1, the parts should be inspected carefully before they are work lifting platform, key check whether the screw connection is reliable, hydraulic pipe leaks, loose wires contact with and without, breakage, and so on and so forth. 2, lifting platform lift, put the leg in the four corners, four leg should be firmly supported on solid ground, dispatch work mesa to state level (visual). Turn on the power, the indicator should be on. Then start the motor, pump work, drop one or two in the air, check the parts and then start working again. When the temperature is below 10 ℃, should make the pump running 3-5 minutes, confirmation of oil pump work can be carried out. 3, homework personnel enter the platform after the guardrail doors should be closed, with bolt, tied on safety rope, the center of the load (people stand location) should be in the center position of workbench face.
- Q:What device is better to design a platform that is 1 square meter or so?
- Hello, we are jinan Kowloon hydraulic machinery manufacturing co., LTD., which produces elevators,
- Q:How to automatically lift up and lift
- If I want to reach a certain time, the platform automatically drops, how to achieve? There is a time relay. Thank you very much!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Single Mast aerial working platform
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords