• Cuplock Scaffolding With  The Best Performerce System 1
  • Cuplock Scaffolding With  The Best Performerce System 2
Cuplock Scaffolding With  The Best Performerce

Cuplock Scaffolding With The Best Performerce

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

          We can provide mature rolling, stamping, welding and casting technology, with an annual adjustable base products 8000 tons, screw class production Products 4,000 tons of steel bracing accessories products 2000 tons, 5000 tons of casting nut products, our company has specialized rolling equipment 16, stamping equipment 12 sets, 20 sets of welding equipment and auxiliary equipment several advanced production equipment, strict quality control system, professional to provide “Stable quality, Stable quantity, Cost-effective” products and services.

      

     2.   Main Features of Cup-lock Scaffolding

     .Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding,            props, etc. Applied to high-rise building, bridge, water tower, and so on.

     .Avoid using bolt in assembly and low down labor intensity

    .Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal

    .Not easy to lose fastener, portable firm and easy to maintain and transport

3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

   .There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

   .5 times fast of adapter plug assembly and disassembly than normal

   .Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

1) What can we do for you? 

.We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

  . If printing required, please advise asap because the whole set need much more time to complete.

  . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

   .Packing:  As Customer's Requirements

  .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

 



Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?
Go on, with 3 m long rod, the top layer with 1.8 m and 3 m two. The length of leveling under 30 m high scaffold verticality deviation should be controlled within 1/200, 30 m high above the scaffold should be controlled at 1/400~1/600, the total height of the vertical deviation should be less than 100 mm.The domestic vertical bar bowl buckle spacing of 600mm, the number of foreign pitch bar button spacing is some of the 500mm, the foreign specifications of the crossbar as well as 1m, 2m, 2.5m
Q:is both 1 m farm from the scaffold. if the boeard is 20 kg in mass, how close to the end can the painter stand w/out tipping the board over?
1.692m, but you should have included a diagram, I am still not sure if you are talking about a cantilever force couple or a simple lever pivot..
Q:Explain the principles of scaffolding?
The term scaffold is a Vygotskian metaphor for someone to support a learner through dialog, questioning, conversation, and nonverbal modeling, in which the learner attempts tasks that could not be done without that assistance. Identify five types of scaffolding: offering explanations, inviting participation, verifying and clarifying understandings, modeling of desired behaviors, and inviting them to contribute clues for reasoning through an issue or problem. Additional effective scaffolds, especially for struggling people, are to address the emotional.
Q:Bridge formwork support bowl button steel scaffolding, you need to set the floor bar?
Bridge formwork support bowl buckle type steel pipe scaffold, need to set the sweeping rod.
Q:Bowl buckle scaffold is not a steel pipe scaffolding
Bowl buckle scaffold with steel scaffolding is different
Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
1200 or 900 spacing is generally adopted in practice. According to the size of the room are on the line. Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room
Q:Full house scaffolding height of more than the number of meters experts need to do?
The height of the erection of the frame is more than 24m, and only need to be designed and calculated according to the regulations.
Q:The first scaffold scene is when Hester and Pearl are up there in front of the public.The second scene is with Dimmesdale, Hester, and Pearl at night. The stars create an quot;Aquot; in the sky.The third scene is in public again but with Dimmesdale and he dies.
the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
Q:So today I decided to get both my tragus' done, a top cartlidge piercing and a scaffolding piercing in one sitting and now I'm in agony and the only aftercare I was given is a tiny bag of rock salt.... SALT!?Any ideas on how to get the swelling down / pain to go away and any tips on how to reduce the chance of getting them infected?
One way I know to help the healing using bioplast or PTFE jewelry but I dont recommend changing it now since it's new. As for the rocksalt use it on the piercings to clean it out

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords