Cup Lock Scaffolding /Cuplock Scaffolding best quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 PCS
- Supply Capability:
- 10000 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | cuplock scaffolding | ||||
Size: | 48mm | material: | Q235/Q345 | surface: | Paint,Galvanized,HDG |
thickness: | 2.5mm/2.75mm/3.0mm/3.25mm |
Packaging & Delivery
Packaging Detail: | in bulk or as customer's require |
Delivery Detail: | 25-30 days after receiving deposit |
Specifications
cuplock scaffolding
Material:Q235
Surface: HDG, Color:Silver
Function: Connection &Support
Cuplock Scaffolding
Cuplock scaffolding system is widely used for false work support structures. Its high leg load and wide range of components gives the system the capacity to tackle virtually and soffit support application with a cost-effective solution. For formwork support, a vide number of grid variations can be created to suite differing load requirements and decking systems
Ringlock component | Specification (mm) | Weigtht (kg) | Material |
Standards with Spigot | 500 | 3.09 | Q235/Q345 |
1000 | 5.49 | ||
1500 | 7.90 | ||
2000 | 10.30 | ||
3000 | 15.11 | ||
3500 | 17.51 | ||
Ledgers | 750 | 3.20 | Q235 |
1000 | 4.07 | ||
1065 | 4.31 | ||
1200 | 4.78 | ||
1500 | 5.88 | ||
2000 | 7.56 | ||
2200 | 8.30 | ||
2500 | 9.35 | ||
3000 | 11.13 | ||
Ladder | 3000 | 17.80 | Q235 |
Braces | 750x2000 | 9.18 | Q235 |
1000x2000 | 9.47 | ||
1500x2000 | 10.31 | ||
2000x2000 | 11.40 | ||
2500x2000 | 12.67 | ||
3000x2000 | 14.06 |
- Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
- Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
- Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
- Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
- Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
- 1, steel pipe:(1) the steel pipe shall have the product quality certificate and inspection report with the outer diameter of 48mm and the thickness of 3.5mm of the steel pipe welded to the steel pipe of 3. Rust must be replaced, not to be used to build the frame.(2) the surface of the steel pipe shall be straight and smooth, and shall not be used for cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep drawing.(3) anti rust paint for steel pipe. Vertical rod and bar brush yellow rust proof paint, scissors and handrails with red and white tube brush. The maximum quality of each steel pipe shall not be greater than 25Kg. Steel pipe is strictly prohibited.
- Q:A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
- Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
- Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
- The span, the rod step is easy to calculate, I have done the program in general 4.4.8 meters
- Q:Specification for construction steel pipe scaffolding and construction safety rules?
- 2, operating conditionsAccording to the engineering characteristics and construction requirements of the scaffolding erection scheme.The shelf position has to clean up the site.On the soft soil foundation has been hardening.
- Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
- oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
- Q:opinions on scaffolding piercing and how to hide it from school :)?
- Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
- Q:Exterior wall scaffold construction plan?
- Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
- Q:New features of quick dismantling scaffolding?
- The scaffold material for the Q235 high frequency welded pipe diameter 48mm wall thickness 2.75mm-3.5mm can be processed in accordance with the requirements of
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup Lock Scaffolding /Cuplock Scaffolding best quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 PCS
- Supply Capability:
- 10000 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords