Cuplock – Base Jack (ARES SCAFFOLDING – C001)
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | United Arab Emirates |
Specifications
Cup lock Base Jack also known as Levelling Jack.
Cuplock – Base Jack (ARES SCAFFOLDING – C001)
Cuplock – Base Jack also known as Levelling Jack.
The pipe is of Hot Rolled Steel as per BS-1139 Standard,
The Jack Nut of SG Iron Castings.
Made from pipe of 38mm OD X 650mm Height.
The Breaking Load is 10 Tons
Specification of Cuplock Scaffolding:
Item Name | Cuplock Scaffolding | |
Brand Name | Queen | |
Raw Material | Q235 /Q345steel Grade | |
Components | Standard.Ledger .Diagonal brace. Top/Bottop Cup/ Ledge Blade | |
Surface finish | Electric Galvanized/HDG/Powder coated | |
Size | Pipe size:48.3mm | |
Thickness:3.25mm | ||
Usage | Widely used in Bridge .Tunnel.Peterifaction.Shipbuilding .railway,Airport. Dock Industry and Civil Building | |
Packing | By Steel pallet or bulk | |
Standard | 48.3*3.25*500mm | 3.5kg |
48.3*3.25*1000mm | 5.6kg | |
48.3*3.25*1300mm | 8.0kg | |
48.3*3.25*1500mm | 8.75kg | |
48.3*3.25*1800mm | 10.6kg | |
48.3*3.25*2000mm | 11.4kg | |
48.3*3.25*2500mm | 14.0kg | |
48.3*3.25*3000mm | 16.70kg | |
8.3*3.25*4000mm | 20.36kg | |
Ledger | 48.3*3.25*650mm | 2.54kg |
48.3*3.25*914mm | 3.6kg | |
48.3*3.25*1065mm | 4.10kg | |
48.3*3.25*1150mm | 4.7kg | |
48.3*3.25*1570mm | 5.76kg | |
48.3*3.25*1829mm | 6.62kg | |
48.3*3.25*2130mm | 7.62kg | |
48.3*3.25*2438mm | 8.24kg | |
48.3*3.25*3050mm | 10.68kg | |
Diagonal brace | 48.3*3.25*915mm | 3.4kg |
48.3*3.25*1150mm | 4.04kg | |
48.3*3.25*1572mm | 5.34kg | |
48.3*3.25*1829mm | 6.13kg | |
48.3*3.25*2130mm | 7.06kg | |
48.3*3.25*2438mm | 8.01kg | |
48.3*3.25*3050mm | 9.90kg | |
Steel Plank | 210*45*1.2*1000/2000/3000/4000 | |
250*50*1.2*1000/2000/3000/4000 | ||
Screw jack base | 38*4.0*500mm | 3.35kg |
38*4.0*600mm | 3.65kg | |
48*4.0*600mm | 4.4kg | |
35*500mm | 4.5kg |
- Q: Standard for inspection of portal scaffolding
- The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
- Q: What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
- (2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
- Q: Latch type disc scaffolding accessories are national patent products?
- The utility model is mainly used for a light frame and a background frame of a large-scale concert Pankou, type multifunctional scaffold, the scaffold socket diameter of 133mm and thickness of 10mm disc, 8 hole disc, adopting 48*3.2mm, Q345A pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disk. The bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
- Q: i just got it like 3 days ago and its no signs of infection and im just worried it might get that way. ive been reading online about people who got infections and people who had all this crap happen. what do i need to do to stop one from coming i mean i use contact solution and cotton swabs wipe it down with wet ones and clean it when i sweat and turn it twice a day.. im always careful about keeping it clean im a neat clean freak but is there anything else i can do to stop infection from coming
- Keeping it cleanis the only thing you really can do. Insteas of contact solution you could use a non iodized sea salt soak (1/8 teaspoon of sea salt to 8 oz of warm water). But you are going to want to stop spinning it. Spinning it could rip your fistula and prolong the healing time of the piercing
- Q: Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
- that would be great natural born killas playing the whole match
- Q: What does scaffold one's days mean? kill time?
- In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
- Q: how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
- Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
- Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
- As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
- Q: three examples of scaffolding, thanks
- As long as you're on the internet, why not just Google examples of scaffolding rather than expecting someone on YA to do your homework for you?
- Q: Specification and type of scaffold erection
- 2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
Send your message to us
Cuplock – Base Jack (ARES SCAFFOLDING – C001)
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords