Cup-lock Scaffolding with Best Quality, Easy Assembling and Maintenances
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Main Introduction of Cup-lock Scaffolding:
Name: Cup Lock Scaffolding
Category: Scaffolding system
Material: Steel (Q235/Q345)
Size: as your requirement
Surface: Electro Galvanized/Self Color/Painted/HDG
Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.
Application:
Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering
2. TheAdvantages of Cup-lock Scaffolding:
Easy assembly, time and labor saving.
High load-carrying capacity.
Adaptable to various construction projects.
All elements safely connected
Highly durable
3. Images for Cup-lock Scaffolding:
4. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:Hester Prynn stands on a scaffold
- In medical college they had to take notes rather at once. commencing off to be a doctor isn't that straightforward now, the fee of their writing messep up their handwriting and that they do now no longer care approximately it after commencing off to be a doctor.
- Q:A window washer is standing on a scaffoldsupported by a vertical rope at each end. Thescaffold weighs 145 N and is 3.02 m long.Assume the 675 N worker stands 1.28 m fromone end of the scaffold.What is the force on the rope farther fromthe worker?Answer in units of NWhat is the force on the closer rope?Answer in units of N.
- Analyzing the force diagram Forces in the Upward direction:...T1,T2 (tension of the ropes) Forces in the Downward direction...M1g (scaffold), M2g (man) Fnet = 0 T1 + T2 = M1g + M2g Analyzing the moments about the center T1 is nearest man T1(1.51) =M2g(1.51 - 1.28) + T2(1.51) T1 + T2 = (675 + 145)= 820 T1 - T2 = ((675)(1.51 - 1.28))/1.51 = 102.81 sum the two equations 2T1 = 922.81 T1 = 461.5 N T1 + T2 = 820 T2 = 358.6 N
- Q:Bowl buckle scaffold is not a steel pipe scaffolding
- The buckle of the bowl buckle scaffold can be welded with a bowl buckle, and the node is mainly fixed by a bowl buckle
- Q:I really want to get an industrial piercing but I'm going to a music festival in about a month... If I get it done this weekend, will a month be time enough for it to heal, because I plan on being drunk for that whole festival so I doubt I'll find time to clean it haha..Should I get it done, or wait until after the festival?..Thanks :) x
- it not to big a deal if you get it before, but if youre worried about keeping it clean than i would wait untill afterwards. cartledge pierceing can take anywhere from 6 months to 2 years to completly heal. plus it will be sensitive for quite a while and if youre going to be partying it may not be a good idea to have cuz you'll probably hurt it alot. you'd be surprised how many things your ear touches.
- Q:What is the bowl buckle scaffold, bowl buckle scaffold what are the characteristics?
- The single cross bar is welded only at one end of the diameter of 48 mm x 3.5mm steel pipe;
- Q:I bought 100 tons of scaffolding steel pipe, according to the 150 tons of rack pipe to prepare various kinds of fasteners and fastening screws. How to calculate.. Thank you all
- 0.7 - the basic wind pressure reduction coefficient determined by the return period of 5 years. In some special cases, a value above 0.7 may be used, but not less than this value.More than W0, Z, beta Z, STW are in accordance with the "building structure load code" (GBJ9-87) of the corresponding provisions of the selection or calculation to determine, which STW 6.3.1 in accordance with its table thirty-second and thirty-sixth.
- Q:Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
- Must be 120 steps according to the distance control, set up close to the bottom plate beam always available for 60 or 90 bars and the adjustable bracket is adjusted.
- Q:I would like to ask what is the erection of external wall scaffolding specification? What do you need to pay attention to?
- N need to pay attention to several points: 1, scaffolding load shall not be more than 270kg/m2, after the acceptance of the listing can be used before the use of the regular inspection and maintenance. More than 270kg/m2 load, or the form of special scaffolding should be designed. rn2, steel pipe column should be set metal base, on the basis of the soft foundation of the board should be filled with wood or stick. rn3, scaffolding vertical pole should be vertical, vertical deviation shall not exceed the height of 1/200, vertical pole spacing of not more than 2 meters
- Q:It's like they just disappeared
- not sure but i know Dawn Marie was pregnant when she got released and thats the reason why and now she cant ggo back to wwe cus they have a hard schedule and she has 1 or 2 little kids
- Q:Tips and advices regarding the piercing or healing process will be greatly appreciated. Thanks:)
- It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup-lock Scaffolding with Best Quality, Easy Assembling and Maintenances
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords