Cup-lock Scaffolding with Best Quality, Easy Assembling and Maintenances
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Main Introduction of Cup-lock Scaffolding:
Name: Cup Lock Scaffolding
Category: Scaffolding system
Material: Steel (Q235/Q345)
Size: as your requirement
Surface: Electro Galvanized/Self Color/Painted/HDG
Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.
Application:
Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering
2. TheAdvantages of Cup-lock Scaffolding:
Easy assembly, time and labor saving.
High load-carrying capacity.
Adaptable to various construction projects.
All elements safely connected
Highly durable
3. Images for Cup-lock Scaffolding:
4. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:why the scaffold nned to be inspected within the preceding seven(7) days?
- To make sure that it is constructed properly and things haven';t slipped out
- Q:I'm getting scaffolding put up round my house. Its a Normal size house and its being put up all round the four walls to the top. will it be put up in 2 hours or more? or less? I have no clue please help me.Thanks!
- all depends how many guys are putting up the scaffold but I would say more than two hours
- Q:i have decided that i'll finish a tragic story that i have been writing with the public execution of the both lovers (protagonists). This story is in the monarchy age. Well but i want to ask you what method of execution is the more suitable for to lovers which love is forbiden and tragic. i've two options one is that they should be burned in the stake so their love and passion will burn them, other option is that they should be beheaded (guillotine ore axe what do you think?) so they'll lost their heads for love or the last option is that they die for hanging so they will have a last dance together in the rope. So what do you thing that is more suitable for end my tragic story? and which analogy is better for a forbbiden love and his punishment?
- Yeah I am big into tragic romances especially during that era. I also vote for burning at the stake. I mean just the concept of fire consuming them as passion did invokes such empathy and sadness. Also since it is not a quick execution think of what you can do to prolong the execution. They will be able to hear each others agony and they can say their i love yous as their dying words. Romantic, tragic, it would rock!
- Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
- To make sure the components are securely locked together and will not collapse when used.
- Q:i mostly need forest tho!
- This Site Might Help You. RE: in the scarlet letter, what is the significance of the forest and the scaffold? i mostly need forest tho!
- Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
- These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
- Q:How Much would it cost to Scaffold a Detached Dwelling, 23m x 8.4m...Roughly?
- I had a detached 4-bed house surrounded (soffit and barge boards to do) by scaffold to a high standard for ?180 in Kent. Two weeks hire, assembly and dismantle included (they left it there for 3 weeks in fact). Pay more than 200 outside and you're being ripped-off...
- Q:JGJ 130-2011 also has a carpenter scaffolding specification, who has to share the upload thank you
- Technical code for safety of steel tubular scaffold with couplers in construction of JGJ 130-2011
- Q:Wheel buckle scaffolding rental price
- Each region is not the same price, the lease is not the same.
- Q:One of my fav. when laws are unjust. like laws I don't believe in regarding freedom of body how about you..
- I don't think I get it? lol
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup-lock Scaffolding with Best Quality, Easy Assembling and Maintenances
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords