Cup Lock Scaffolding For Commercial Building
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 15000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details:
Place of Origin:Heibei, China
Model Number: W104
Material: Q235
Surface: Painted or galvanzied
Packaging & Delivery
Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.
Delivery Detail: 1 month after the contract or as customer's requirement.
Specifications
1.Great Reputation Cup Lock Scaffolding
2.Three Year Warranty
3.Operating Friendly
4.Full Safety Devices
5.Provide OEM service
6.Reasonable price
FAQ:
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q:Wankou scaffolding steel scaffolding and look like? What's the difference?
- The steel pipe scaffold is composed of a fastener and a frame tube, each of which is connected by a fastener
- Q:What are the hidden dangers of scaffolding
- 3, do not approve the construction plan to guide the construction.4, the settlement of the foundation of the ground scaffolding.
- Q:What kind of scaffolding used in engineering construction
- Scaffolding is a special type of work closely related to production safety. In the design and construction of steel tubular scaffolding in the implementation of national safety production policies, to ensure the safety of construction workers, do apply advanced technology, reasonable economy, safety, it must comply with the "construction of steel tubular scaffold safety technical specifications" (JGJ 130 - 2011) requirements, the new standard by the Ministry of construction in People's Republic of China Announcement No. 902, and in 2011 - 01 - 28 - 12 - 2011 approved 01 implementation.
- Q:So a week ago today I got my industrial pierced. The pain was what I expected and afterwards it was very sore (as expected) however a week later it is a still rather sore and swollen and (I hate to be disgusting) quite crusty with dried blood/yellow stuff. I clean it everyday with salt water solution but I was just wondering if this was normal or should I take the piercing out?
- I#x27;m pretty sure it#x27;s normal make sure you use the proper cleanser for your ear. And make sure to clean it out as often as the piercer said to.
- Q:the shop said i might have the wrong ear shape, does anyone know of any pictures or diagrams of the wrong shape so i can see. Also what are some do's and do not's. not like cleaning cos i've read loads of them, just anything else useful. thankssharotoxxx
- Hello You should have asked them I dunno whats that mean the wrong ear shape But you can always do a cartilage piercing, it looks a way better Good luck
- Q:Should I work Offshore or Scaffold?
- offshore for sure buddy,,scaffolding is a pain sometimes,,
- Q:What person or place to scaffold?
- For a long time, due to the erection of the tool itself and its construction technology and the use of safety management in a relatively backward state, resulting in a higher incidence of accidents. Statistics on the surface: in China's construction system every year, the number of casualties occurred, about 1/3 directly or indirectly with the erection tools and the use of related issues
- Q:I would like to ask what is the erection of external wall scaffolding specification? What do you need to pay attention to?
- Outside, scaffolding, ramps, platforms 1.05 meters fence. The laying of bamboo or wood, both ends must be secured, strictly binding is put into use. rn6, in the corridor and escalator scaffolding should be reinforced, can not impede the passage. rn7, pick scaffolding generally 1.2 meters walking distance, and to add a diagonal brace, diagonal bracing and vertical angle of not more than 30 degrees. rn8, in order to prevent the buckling of the tube tube bending buckle from the tube head, each rod is extended to the ends of the intersection are greater than 10 cm. rn9, scaffolding erection site, if there is a power line or electrical equipment, must comply with the safety distance requirements, erection and removal measures taken to stop the transmission
- Q:I pierce and I have 20 piercings. I've wanted this piercing for like 2 years, and about 3 days ago i finally did it =]I just wanted to know what you think.
- I think the positioning is ok. It just look different because of the other piercing next to it. Over all your piercings are cool !
- Q:More than 3 floors of the building can be erected with bamboo scaffolding
- 3, the structure of the scaffold, the components of the initial defects, such as the initial bending of the rod, corrosion, erection size error, eccentric load, etc.;4, and the wall of the connection point, the binding of the scaffold variation. The study of the above issues and lack of systematic accumulation of statistical data, does not have the independent probability analysis of the conditions and structure of the resistance is less than 1 of the adjusted coefficient multiplied by the value determined by calibrating system and safety coefficient used in the past. Therefore, the design method used in this specification is essentially a semi probabilistic, semi empirical. Scaffolding to meet the requirements of this specification is the basic requirements of the design calculation.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup Lock Scaffolding For Commercial Building
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 15000 pc
- Supply Capability:
- 300000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords