• Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales System 1
  • Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales System 2
  • Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales System 3
  • Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales System 4
  • Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales System 5
  • Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales System 6
Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales

Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales


\Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales\

Tower Crane TC6024 Technical Sheet:

Crane TC6024 Sale Construction Equipment Building Machineruy Wholesaler Sales

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
Q: What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well, weak- anthropic beats the hell out of strong- anthropic. One cannot, in good conscience, postulate God from the improbability of a good primordial soup kitchen, when beating the odds is the prerequisite for anything evolving sufficiently to be amazed. Life, however, plays hell with probability, because it’s possible for an improbably complex thing to create as many improbably complex things as energy allows. Introduce evolution, crank out a tool user, it gets worse. One dedicated farmer can create a vast and profoundly improbable flourishing of life. Now if we move out into the universe and find a vast and improbable flourishing, we will have cause to suspect the existence of cosmic farmers. This especially because it appears we are evolving towards that state ourselves. Dressing up this concept in pseudo science though, strikes me as a bit pretentious. Which is my take on Louis Crane's idea of meduso-anthropic principle
Q: the title. the battery --- 9.6v 2000Mah INT NIMH Crane Stock Battery. will this fit in an echo 1 crane stock? the desc. said its designed for GG and SRC crane stocks, but may fit in other crane stocks.
yeah, all crane stock battery's are pretty much interchangeable.
Q: was he a realist or naturalist
Stephen Crane was a naturalist a lot like Jack London. His main themes were man vs. nature and man vs. himself in which nature is an abstract, omnipotent force that does not (and really cannot) care what becomes of the individual. In Crane's writings, man is often faced with strengths and weaknesses within himself when confronted by extremes of uncaring Nature (see the short story The Open Boat).
Q: Absolutely bs. I hope a crane falls on ALL these effin construction workers and their families and the building executives' heads. Let THEM have family members die or get hurt from these accidents - then they will get what's coming to them. They should all burn in hell. Total greed total total greed. They will pay
It's not really the construction workers fault. It's the city inspectors!! They take short cuts, sign off on inspections that never happened, all because of greed! Then they can say they inspected them and go home early. Unfortunately it's the innocent residents of these buildings and the construction workers that die while they are at home all snug in their beds!!! That first crane accident should have taught them all a lesson, but evidently it did not. I think whoever was in charge of inspecting that crane should be arrested for manslaughter. The first guy got in trouble, I'm not sure to what extent but it obviously didn't make an impression on the rest of those lazy a**holes!
Q: He hasnt been in the military before, so how long would he be gone for boot camp and all that? What is the pay, does he get paid for going? I need to know it all. I am a stay at home mom that doesnt work, so we would need to earn money somehow.
If you want to know, and you have a right to, you should talk to your husband's recruiter. Tell him NO BS! The next best is to find a wife in a very similar situation via the net, forums, ect...
Q: hiya :) for my birthday i want an arcade style grabber machine that can pick up sweets and accept real money etc. I dont want small plastic ones because they are pretty pathetic tbh. I know its a bit random but i really appriciate it because my birthday is coming up ;) i want it being in the range of ?60-?100 :) thanks
Sweet Grabber Machine
Q: I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
Large okorder .
Q: I know it is the last thing in the movie but what chapter does Crane's death occur? THANK YOU
It's not metion in the hunger games, but in Catching Fire President Snows metions it to katniss. Then katniss does her presentation to the gamemakers, where she takes a dummy hangs hims and writes seneca crane in it.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords