• Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales System 1
  • Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales System 2
  • Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales System 3
  • Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales System 4
  • Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales System 5
  • Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales System 6
Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales

Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6024 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales


\Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Sale Construction Equipment Wholesaler Sales

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q: Did Noah build the Ark with no power tools, nails, or crane?
Yes, but it took around 50 years and he had the help of three strong sons.
Q: would someone who study both white crane kung-fu & ninjutsu be called a mixed martial artist?
Not by most MMAists. Strictly speaking, studying two martial arts is just cross training. To be MMA, the elements of the two would have to be blended together and trained in a realistic way (sparring), with equal attention being paid to the stand-up, clinch, and ground-fighting phases of combat.
Q: Who do you think was better and who would've won if they faced.
Gotta go with Willie. The only match I ever saw Mosconi play was in Chicago back in 1964. He was down 46 to 14 going to 150. When he got to the table he ran 136 and out for the win. It was incredible. I never saw Crane in person and saw only one film of him. He ran 150 and out on Cowboy Jimmy Moore. A good friend of mine was telling me a story about the time he was in Johnston City, Illinois. Richie Lawrence was at the table. My friend was seated in front of Crane. As Richie was shooting, Irving Crane was telling his friend what Richie should be shooting every shot. Richie did just the opposite every time. The neat part about it was... Richie ran 150 and out... and never shot the right ball. Gotta give Willie the edge. Good question.
Q: Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
QTZ100 in fact, there are two symbols behind T.M, which is used in the country.Q is lifting, T is tower, and Z is self elevating. The 100 is its lifting torque, which means 100 tons. Meters (T.M).
Q: In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
Q: I know that there's Tibetan and Fujian but what are all the styles and which is the best one to learn ( in your opinion)
tibetan, fukien, shaolin, ans emei, for starters. WING CHUN was originally a combo of crane and snake.
Q: What are the main technical parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q: How much should the verticality of a tower crane be controlled? Thank you
No, the wind speed is not more than 3m/s, the independent state tower (or attached state highest attachment point above the tower axis) lateral verticality tolerance is 4/1000, the highest tower axis perpendicularity allowed attachment line below the point of difference is 2/1000.
Q: Hi! I'm only going into 9th grade, but I'm getting a head start on chooising a college. I am absaloutley positive I want to be a musician. Hopefully a singer/songwriter, but my plan B is music production. So, I'm going to put Juliard aside (lol)and here are my choices right now:Crane School of Music,Fredonia School of Music,and Berklee School of Musicplease give me your opinion on those schools, and if you could suggest any others, please do. I need all the information I can get...Ive been doing alot of research but now I need other people's opinions. thanks :)
Hey! okorder
Q: ?? Please star my ? i will give you points!
Although I haven't seen it done I imagine that especially for very high cranes it's done most often with cables and winches (utilizing a pivot point at the bottom of the structure). For many lower cranes such as those found on vehicles hydraulic lifting is sufficient.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords