Container vertical skip type concrete mixing plant
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The HZSDJ container vertical skip type concrete mixing plant is a new commercial concrete mixing plantdeveloped by NFLG on the basis of absorbing latest technology achievement in the field of concrete equipment and integrating many years of improvement, innovation and customer feedback. It’s characterized by little land consumption, quick installation and convenient transportation.
1. Brief introduction
The HZSDJ container vertical skip type concrete mixing plant is a new commercial concrete mixing plantdeveloped by NFLG on the basis of absorbing latest technology achievement in the field of concrete equipment and integrating many years of improvement, innovation and customer feedback. It’s characterized by little land consumption, quick installation and convenient transportation.
2. Characteristics
1) Vertical skip, little land consumpiton, reducing by 70% in comparison with conventional plant;
2) Adopting one self-made 40gp container and 4 self-made 20gp containers. It takes just three days to complete installation of its main structure;
3) Water and air pipelines are pre-installed in containers and their connection is realized with quick joints, making it especially quick and convenient to install and transfer;
4) The plant is fitted with mixer of capacity 2.5m3, which makes a ideal complement with popular 10m3concrete mixer truck;
5) Steel structure fundament is also available, which would reduce cost and time spent on foundation preparation.
HZSDJ container vertical skip type concrete mixing plant | ||
---|---|---|
Technical performance | Parameter | |
Mixer | JS2500DK.0 | |
Rated productivity | 100m3/h | |
Aggregate size | <=80mm | |
Discharge height | 3.8m | |
Dosage range | aggregate | 5000kg±2% |
cement | 1500kg±1% | |
Fly ash | 400kg±1% | |
water | 500kg±1% | |
additive | 2×50kg±1% | |
Skip hopper capacity | 4.2m3 | |
Power supply | 380v/50Hz | |
Total power | ≈190kw(excluding screw) |
- Q:What is the meaning of right in The boiler was in the fore-end, and the machinery right astern.
- right is the placement of where the machinery was/is
- Q:The Tom Smith Corporation has the following items: Cash, $5,000; Machinery, $50,000; Building, $150,000; Note payable bank, $10,000; Savings, $10,000; Long term debt, $50,000; Accounts payable, $30,000; Taxes payable, $5,000; Accounts receivable, $30,000; Inventory, $10,000; Depreciation Building, $35,000; Depreciation Machinery, $25,000; Land $50,000. Total assets for this Corporation are what?A. $55,000B. $95,000C. $155,000D. $190,000E. $245,000
- Cash, $5,000 Machinery, $50,000 Building, $150,000 Savings, $10,000 Accounts receivable, $30,000 Inventory, $10,000 Land $50,000 - Depreciation Building, $35,000; - Depreciation Machinery, $25,000; = (E) $245,000
- Q:why are damping devices often used on machinery?
- Damping Devices
- Q:The school was like 3 months. And he says he has an offer to go to Alberta, Canada for 6 months and they'll pay him $140,000. Is this realistic, has anyone ever heard of people making that much money in 6 months?
- Never heard of that. Given that the hot market in Alberta and shortage of all types of labour, it may be possible but you have to tell your friend about the skyrocketing expenses there.
- Q:Is repairs to plant and machinery revenue or capital expenditure???? Can you all explain why?????and what is the different between revenue or capital expenditure!!!1
- Start okorder
- Q:Please explain the process and give an example of a machine that used this in the industrial revolution. best answer for a decent answer in the next hour.
- Iron doesn't provide power. Coal was only used to provide heat to boil water to make steam. Steam, if contained, produces pressure. Properly harnessed, pressure can drive pretty much anything.
- Q:Can anybody knows the Journal entry of purchase Plant & Machinery?
- Debit Plant Machinery A/c and Credit with either Cash/Bank or Creditor's Account
- Q:Registration process of a construction machinery maintenance plant in Tangshan? What information should be prepared and which departments should be handled?
- Sign the rental contract, but also to the tax bureau to buy stamp tax, annual rental rate of 1/1000 of the purchase, such as your annual rent is 10 thousand yuan, tax 10 yuan would buy, attached to the rent contract home, followed by those who need to use the rent contract in place, need to copy the contract a post stamp tax.
- Q:no i cannot hear any machinery, no fans?
- ?????????????????
- Q:like a kettle, for example.
- Just about everything you see. Certainly anything electronic, like TV, stereo, iPad, iPod, phones, computers. And autos, trucks, also. And aircraft.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Container vertical skip type concrete mixing plant
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords