Construction HDG Steel Ringlock Scaffolding System with En12810 Standard CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Construction HDG Steel Ringlock Scaffolding System with En12810 Standard
Type:
Material:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Surface Treatment:
Certificate:
Color:
Production Capability:
Delivery Time:
Export Markets:
Descriptions of Construction HDG Steel Ringlock Scaffolding System with En12810 Standard
1. Standard:
3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
2. Ledger:
3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
3. Diagonal brace:
3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
4. Tube specification:
Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
5. Surface Finish:
Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
6. Material:
Q235, Q345
7. Certificate:
EN12810,SGS test report for loading capacity.
The Parts of Construction HDG Steel Ringlock Scaffolding System with En12810 Standard
Ringlock System Main Parts | |||
Item NO. | Description | Material | Finish |
1 | Standard | Q345/Q235 | HDG |
2 | Ledger | Q345/Q235 | HDG |
3 | Brace | Q345/Q235 | HDG |
4 | Base Collar | Q235 | HDG |
5 | Base Jack | Q235 | HDG/EP |
6 | U-Head | Q235 | HDG/EP |
7 | Plank | Q235/Q195 | HDG |
8 | Stair | Q235 | HDG |
Stair Guardrail | Q235 | HDG | |
9 | Ladder | Q235 | HDG |
Ladder Bracket | Q235 | HDG |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
- Hey, This is a good link for downloading Virtual Villagers 3 The Secret City for free: j.mp/1pnRgNo it's completely free and it's very fast to install It is an entertaining game series that consist in exploring new corners of Isola Island, building structures and unraveling mysteries that you will find during the adventure.
- Q: What's an antonym for the word scaffold?
- I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
- Q: Latch type disc scaffolding accessories are national patent products?
- Disk lock scaffolding called socket type Pankou scaffold.Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
- Q: i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
- A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
- Q: Want to rent the scaffolding in the county, you need to cast how much money
- Look what you want to do. Store rent is not.
- Q: What are the full house scaffolding specification
- 5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
- dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
- Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
- . The utility model is mainly used for a light frame and a background frame of a large-scale concert Disc type multifunctional scaffolding, after the bowl buckle scaffold after the upgrading of products. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 48*3.5mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disc, the bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
- Q: In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
- (3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
Send your message to us
Construction HDG Steel Ringlock Scaffolding System with En12810 Standard CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords