Quick Details of En12810 Construction Platform Ringlock Scaffolding
Material:Steel
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Color:
Steel Grade:
Descriptions of En12810 Construction Platform Ringlock Scaffolding
Introduction
The revolutionary Ringlock System's node point ( Rosette) provide up to 8 connections in one place. The 4 narrow punched out holes automatically center the ledgers in correct dimensions and at right angles. The 4 wide holes permit alignment of ledgers and diagonal braces at angles required.
Standard
Use: Standards are the vertical members of ringlock scaffolding. They provide the
vertical support for scaffolding.
Material: High strength structural steel
Finish: Hot dipped galvanized
ledger
Use: Ledgers are the horizontal members of Ringlock scaffolding. They provide horizontal support for loads and planks. Ledgers can also be used as mid rail and top or hand guard railsMaterial: High strength structural steel Q235
Finish: Hot dipped galvanized
Base collar
Use: The base collar is designed to "base out" the Ringlock scaffolding system sitting on top of the screw jack creating a lower node point.
Material: High strength structural steel Q235
Finish: Hot dipped galvanized
Features:
1) Quick erection: Ringlock scaffolding are all pre-measured and just a hammer is required when erection.
2) Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening.
3)Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.
4) Low maintenance: The dip galvanized finishing will greatly last the life of the products, no paint required, antirust and anticorrosion.
5) Convenient in storage and transportation: Individual scaffolding parts can be packed in bundles for easy storage and transportation.
The Parts of En12810 Construction Platform Ringlock Scaffolding
DESCRIPTION | MATERIAL | QTY. (PCS) | W. T. (KG/PC) | SURFACE |
3.00m standard | Q345 48.3*3.2mm | 1.00 | 15.3 | Hot-dipped Galvanized |
2.50m standard | Q345 48.3*3.2mm | 1.00 | 12.9 | Hot-dipped Galvanized |
2.00m standard | Q345 48.3*3.2mm | 1.00 | 10.5 | Hot-dipped Galvanized |
1.50m standard | Q345 48.3*3.2mm | 1.00 | 8.1 | Hot-dipped Galvanized |
1.00m standard | Q345 48.3*3.2mm | 1.00 | 5.7 | Hot-dipped Galvanized |
0.50m standard | Q345 48.3*3.2mm | 1.00 | 3.3 | Hot-dipped Galvanized |
2.00m ledger | Q345 48.3*2.5mm | 1.00 | 6.8 | Hot-dipped Galvanized |
1.80m ledger | Q345 48.3*2.5mm | 1.00 | 6.2 | Hot-dipped Galvanized |
1.50m ledger | Q345 48.3*2.5mm | 1.00 | 5.3 | Hot-dipped Galvanized |
1.20m ledger | Q345 48.3*2.5mm | 1.00 | 4.4 | Hot-dipped Galvanized |
0.90m ledger | Q345 48.3*2.5mm | 1.00 | 3.5 | Hot-dipped Galvanized |
0.60m ledger | Q345 48.3*2.5mm | 1.00 | 2.6 | Hot-dipped Galvanized |
2.00*2.00m brace | Q235 33.5*2.3mm | 1.00 | 7 | Hot-dipped Galvanized |
1.80*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.7 | Hot-dipped Galvanized |
1.50*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.4 | Hot-dipped Galvanized |
1.20*2.00m brace | Q235 33.5*2.3mm | 1.00 | 6.1 | Hot-dipped Galvanized |
2.00*1.50m brace | Q235 33.5*2.3mm | 1.00 | 6.3 | Hot-dipped Galvanized |
1.80*1.50m brace | Q235 33.5*2.3mm | 1.00 | 6 | Hot-dipped Galvanized |
1.50*1.50m brace | Q235 33.5*2.3mm | 1.00 | 5.6 | Hot-dipped Galvanized |
1.20*1.50m brace | Q235 33.5*2.3mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.90*1.50m brace | Q235 33.5*2.3mm | 1.00 | 4.9 | Hot-dipped Galvanized |
0.60*1.50m brace | Q235 33.5*2.3mm | 1.00 | 4.7 | Hot-dipped Galvanized |
2.00*1.00m brace | Q235 33.5*2.3mm | 1.00 | 5.8 | Hot-dipped Galvanized |
1.80*1.00m brace | Q235 33.5*2.3mm | 1.00 | 5.4 | Hot-dipped Galvanized |
1.50*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.9 | Hot-dipped Galvanized |
1.20*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.5 | Hot-dipped Galvanized |
0.90*1.00m brace | Q235 33.5*2.3mm | 1.00 | 4.1 | Hot-dipped Galvanized |
0.60*1.00m brace | Q235 33.5*2.3mm | 1.00 | 3.8 | Hot-dipped Galvanized |
2.00*2.00m brace | Q345 48.3*2.5mm | 1.00 | 10.2 | Hot-dipped Galvanized |
1.80*2.00m brace | Q345 48.3*2.5mm | 1.00 | 9.8 | Hot-dipped Galvanized |
1.50*2.00m brace | Q345 48.3*2.5mm | 1.00 | 9.2 | Hot-dipped Galvanized |
1.20*2.00m brace | Q345 48.3*2.5mm | 1.00 | 8.8 | Hot-dipped Galvanized |
2.00*1.50m brace | Q345 48.3*2.5mm | 1.00 | 9.1 | Hot-dipped Galvanized |
1.80*1.50m brace | Q345 48.3*2.5mm | 1.00 | 8.7 | Hot-dipped Galvanized |
1.50*1.50m brace | Q345 48.3*2.5mm | 1.00 | 8 | Hot-dipped Galvanized |
1.20*1.50m brace | Q345 48.3*2.5mm | 1.00 | 7.4 | Hot-dipped Galvanized |
0.90*1.50m brace | Q345 48.3*2.5mm | 1.00 | 7 | Hot-dipped Galvanized |
0.60*1.50m brace | Q345 48.3*2.5mm | 1.00 | 6.6 | Hot-dipped Galvanized |
2.00*1.00m brace | Q345 48.3*2.5mm | 1.00 | 8.3 | Hot-dipped Galvanized |
1.80*1.00m brace | Q345 48.3*2.5mm | 1.00 | 7.7 | Hot-dipped Galvanized |
1.50*1.00m brace | Q345 48.3*2.5mm | 1.00 | 7 | Hot-dipped Galvanized |
1.20*1.00m brace | Q345 48.3*2.5mm | 1.00 | 6.2 | Hot-dipped Galvanized |
0.9*1m brace | Q345 48.3*2.5mm | 1.00 | 5.6 | Hot-dipped Galvanized |
0.6*1m brace | Q345 48.3*2.5mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.88m board bracket | Q345 48.3*2.5mm | 1.00 | 9.5 | Hot-dipped Galvanized |
0.60m base collar down | Q235 38.1*4.5mm | 1.00 | 4.4 | Hot-dipped Galvanized |
0.60m base collar up | Q235 38.1*4.5mm | 1.00 | 5.2 | Hot-dipped Galvanized |
0.24*2.00m Plank | DX51D-Z80 | 1.00 | 8.2 | Hot-dipped Galvanized |
0.24*1.80m Plank | DX51D-Z80 | 1.00 | 7.5 | Hot-dipped Galvanized |
0.24*1.50m Plank | DX51D-Z80 | 1.00 | 6.5 | Hot-dipped Galvanized |
0.24*1.20m Plank | DX51D-Z80 | 1.00 | 5.5 | Hot-dipped Galvanized |
0.24*0.90m Plank | DX51D-Z80 | 1.00 | 4.5 | Hot-dipped Galvanized |
0.50*2.00m Plank | DX51D-Z80 | 1.00 | 15.3 | Hot-dipped Galvanized |
0.50*1.80m Plank | DX51D-Z80 | 1.00 | 14 | Hot-dipped Galvanized |
0.50*1.50m Plank | DX51D-Z80 | 1.00 | 11.9 | Hot-dipped Galvanized |
0.50*1.20m Plank | DX51D-Z80 | 1.00 | 9.9 | Hot-dipped Galvanized |
0.50*0.90m Plank | DX51D-Z80 | 1.00 | 7.9 | Hot-dipped Galvanized |
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: What issues need to pay attention to the construction of high-level scaffolding
- To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
- Q: Exterior wall scaffold construction plan?
- Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
- Q: What are the functions and requirements of the masonry wall
- 4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
- Q: What is the mobile scaffolding materials
- The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
- Q: Mobile scaffolding accessories prices
- ! Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components
- Q: Fastener type steel pipe scaffold composed of components
- Fastener type steel pipe scaffold components are mainly shelf
- Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
- dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
- Q: Scaffolding scaffolding erection norms which requirements, who can say?
- This problem is more professional, we must be more professional people to answer, just do this industry, here on the simple about the content, you can refer to see.
- Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
- Q: does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
- Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Send your message to us
En12810 Construction Platform Ringlock Scaffolding CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords